Loading...
Search for: shahsavar--a
0.008 seconds

    A hybrid project scheduling and material ordering problem: modeling and solution algorithms

    , Article Applied Soft Computing Journal ; Volume 58 , 2017 , Pages 700-713 ; 15684946 (ISSN) Zoraghi, N ; Shahsavar, A ; Niaki, S. T. A ; Sharif University of Technology
    Abstract
    A novel combination of a multimode project scheduling problem with material ordering, in which material procurements are exposed to the total quantity discount policy is investigated in this paper. The study aims at finding an optimal Pareto frontier for a triple objective model derived for the problem. While the first objective minimizes the makespan of the project, the second objective maximizes the robustness of the project schedule and finally the third objective minimizes the total costs pertaining to renewable and nonrenewable resources involved in a project. Four well-known multi-objective evolutionary algorithms including non-dominated sorting genetic algorithm II (NSGAII), strength...