Loading...
Search for: soroudi--a--r
0.138 seconds

    Multi-objective planning model for integration of distributed generations in deregulated power systems

    , Article Iranian Journal of Science and Technology, Transaction B: Engineering ; Volume 34, Issue 3 , 2010 , Pages 307-324 ; 10286284 (ISSN) Soroudi, A. R ; Ehsan, M ; Sharif University of Technology
    2010
    Abstract
    This paper presents a long-term dynamic multi-objective model for distributed generation investment. The proposed model optimizes three objectives, namely active losses, costs and environmental emissions and determines the optimal schemes of sizing, sitting of DG units and specially the dynamics of investment over the planning period. The Pareto optimal solutions of the problem are found using a GA algorithm and finally a fuzzy satisfying method is applied to select the optimal solution considering the desires of the planner. The solutions of Pareto optimal front are analyzed to extract general useful information for planners about the appropriate DG technologies and placement schemes. The... 

    Multi objective distributed generation planning using NSGA-II

    , Article 2008 13th International Power Electronics and Motion Control Conference, EPE-PEMC 2008, Poznan, 1 September 2008 through 3 September 2008 ; 2008 , Pages 1847-1851 ; 9781424417421 (ISBN) Ahmadi, M ; Yousefi, A ; Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2008
    Abstract
    With the increasing share of distributed generation in electrical energy supply, the proper planning procedure for using these units, has become more vital for power system planners. In this paper, the application of multi-objective optimization techniques for siting, sizing and determination of the proper technology to be used, has been investigated in such a way that, the load demand during the planning horizon is met and the technical and environmental constraints are satisfied. Unlike the traditional optimization methods used in power system optimization, NSGA-II multi-objective optimization algorithm does not consider techno-economical and environmental parameters in the constraints of... 

    Hybrid immune-genetic algorithm method for benefit maximisation of distribution network operators and distributed generation owners in a deregulated environment

    , Article IET Generation, Transmission and Distribution ; Volume 5, Issue 9 , 2011 , Pages 961-972 ; 17518687 (ISSN) Soroudi, A ; Ehsan, M ; Caire, R ; Hadjsaid, N ; Sharif University of Technology
    2011
    Abstract
    In deregulated power systems, distribution network operators (DNO) are responsible for maintaining the proper operation and efficiency of distribution networks. This is achieved traditionally through specific investments in network components. The event of distributed generation (DG) has introduced new challenges to these distribution networks. The role of DG units must be correctly assessed to optimise the overall operating and investment cost for the whole system. However, the distributed generation owners (DGOs) have different objective functions which might be contrary to the objectives of DNO. This study presents a long-term dynamic multi-objective model for planning of distribution... 

    Probabilistic dynamic multi-objective model for renewable and non-renewable distributed generation planning

    , Article IET Generation, Transmission and Distribution ; Volume 5, Issue 11 , 2011 , Pages 1173-1182 ; 17518687 (ISSN) Soroudi, A ; Caire, R ; Hadjsaid, N ; Ehsan, M ; Sharif University of Technology
    2011
    Abstract
    This study proposes a probabilistic dynamic model for multi-objective distributed generation (DG) planning, which also considers network reinforcement at presence of uncertainties associated with the load values, generated power of wind turbines and electricity market price. Monte Carlo simulation is used to deal with the mentioned uncertainties. The planning process is considered as a two-objective problem. The first objective is the minimisation of total cost including investment and operating cost of DG units, the cost paid to purchase energy from main grid and the network reinforcement costs. The second objective is defined as the minimisation of technical risk, including the probability... 

    Possibilistic evaluation of distributed generations impacts on distribution networks

    , Article IEEE Transactions on Power Systems ; Volume 26, Issue 4 , 2011 , Pages 2293-2301 ; 08858950 (ISSN) Soroudi, A ; Ehsan, M ; Caire, R ; Hadjsaid, N ; Sharif University of Technology
    2011
    Abstract
    In deregulated power systems, the distribution network operator (DNO) is not responsible for investment in distributed generation (DG) units, and they are just concerned about the best architecture ensuring a good service quality to their customers. The investment and operating decisions related to DG units are then taken by entities other than DNO which are exposed to uncertainty. The DNO should be able to evaluate the technical effects of these uncertain decisions. This paper proposes a fuzzy evaluation tool for analyzing the effect of investment and operation of DG units on active losses and the ability of distribution network in load supply at presence of uncertainties. The considered... 

    Imperialist competitive algorithm for solving non-convex dynamic economic power dispatch

    , Article Energy ; Volume 44, Issue 1 , 2012 , Pages 228-240 ; 03605442 (ISSN) Mohammadi Ivatloo, B ; Rabiee, A ; Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2012
    Abstract
    Dynamic economic dispatch (DED) aims to schedule the committed generating units' output active power economically over a certain period of time, satisfying operating constraints and load demand in each interval. Valve-point effect, the ramp rate limits, prohibited operation zones (POZs), and transmission losses make the DED a complicated, non-linear constrained problem. Hence, in this paper, imperialist competitive algorithm (ICA) is proposed to solve such complicated problem. The feasibility of the proposed method is validated on five and ten units test system for a 24 h time interval. The results obtained by the ICA are compared with other techniques of the literature. These results... 

    Iteration PSO with time varying acceleration coefficients for solving non-convex economic dispatch problems

    , Article International Journal of Electrical Power and Energy Systems ; Volume 42, Issue 1 , November , 2012 , Pages 508-516 ; 01420615 (ISSN) Mohammadi Ivatloo, B ; Rabiee, A ; Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2012
    Abstract
    This paper presents a novel heuristic algorithm for solving economic dispatch (ED) problems, by employing iteration particle swarm optimization with time varying acceleration coefficients (IPSO-TVAC) method. Due to the effect of valve-points and prohibited operation zones (POZs) in the generating units' cost functions, ED problem is a non-linear and non-convex optimization problem. The problem even may be more complicated if transmission losses are taken into account. The effectiveness of the proposed method is examined and validated by carrying out extensive tests on three different test systems. Valve-point effects, POZs, ramp-rate constraints and transmission losses are modeled. Numerical... 

    Multi Objective Distributed Generation Planning in a Flexible Environment

    , Ph.D. Dissertation Sharif University of Technology Soroudi, Alireza (Author) ; Ehsan, Mehdi (Supervisor)
    Abstract
    The process of deregulation that has involved electricity many markets has introduced several new interesting research topics in power system area. This thesis addresses one of the most fascinating issues among them: the study of distributed generation both renewable and conventional integration in distribution networks. From the distribution network operator (DNO)'s point of view, it is of interest to develop a comprehensive methodology which considers various distributed generation technologies as an option for supplying the demand in distribution networks. In this thesis, the planning problem has been multi-objectively modeled. This will help the planner in decision making while knowing... 

    Imperialist competition algorithm for distributed generation connections

    , Article IET Generation, Transmission and Distribution ; Volume 6, Issue 1 , January , 2012 , Pages 21-29 ; 17518687 (ISSN) Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2012
    Abstract
    This study proposes an imperialist competition algorithm (ICA) to maximise the benefits of distribution network operators (DNOs) because of the existence of distributed generation (DG) units. The sum of active loss reduction and network investment deferral incentives has been considered as the objective function to be maximised in this study. The optimal location and size of DG units in the network are found considering various techno-economical issues. The application of the proposed methodology in the UK under current Ofgem financial incentives for DNOs is investigated. The ability of the proposed approach in finding the optimal solution is validated by comparing the obtained results with... 

    Application of a Modified NSGA Method for Multi-Objective Static Distributed Generation Planning

    , Article Arabian Journal for Science and Engineering ; Volume 36, Issue 5 , 2011 , Pages 809-825 ; 13198025 (ISSN) Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2011
    Abstract
    The characteristics of integrating distributed generation (DG) in a distribution network have changed. These electrical resources are used as an alternative energy source to the main grid. The technical and economical benefits of such units are achieved only when they are optimally sized and placed in the network. In this paper, a static mixed integer non-linear model for distributed generation planning is defined and solved using a modified NSGA method (Non-dominated Sorting Genetic Algorithm). Different DG technologies are considered and the objective functions for minimization are defined as the total active loss, investment and operational costs, and environmental pollution. The method... 

    A possibilistic-probabilistic tool for evaluating the impact of stochastic renewable and controllable power generation on energy losses in distribution networks-A case study

    , Article Renewable and Sustainable Energy Reviews ; Volume 15, Issue 1 , 2011 , Pages 794-800 ; 13640321 (ISSN) Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2011
    Abstract
    This paper proposes a hybrid possibilistic-probabilistic evaluation tool for analyzing the effect of uncertain power production of distributed generations (DGs) on active losses of distribution networks. The considered DG technologies are gas and wind turbines. This tool is useful for distribution network operators (DNOs) when they are faced with uncertainties which some of them can be modeled probabilistically and some of them are described possibilistically. The generation pattern of DG units changes the flow of lines and this will cause change of active losses which DNO is responsible for compensating it. This pattern is highly dependent on DG technology and also on decisions of DG... 

    IGDT based robust decision making tool for DNOs in load procurement under severe uncertainty

    , Article IEEE Transactions on Smart Grid ; Volume 4, Issue 2 , 2013 , Pages 886-895 ; 19493053 (ISSN) Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2013
    Abstract
    This paper presents the application of information gap decision theory (IGDT) to help the distribution network operators (DNOs) in choosing the supplying resources for meeting the demand of their customers. The three main energy resources are pool market, distributed generations (DGs), and the bilateral contracts. In deregulated environment, the DNO is faced with many uncertainties associated to the mentioned resources which may not have enough information about their nature and behaviors. In such cases, the classical methods like probabilistic methods or fuzzy methods are not applicable for uncertainty modeling because they need some information about the uncertainty behaviors like... 

    Efficient immune-GA method for DNOs in sizing and placement of distributed generation units

    , Article European Transactions on Electrical Power ; Volume 21, Issue 3 , 2011 , Pages 1361-1375 ; 1430144X (ISSN) Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2011
    Abstract
    This paper proposes a hybrid heuristic optimization method based on genetic algorithm and immune systems to maximize the benefits of Distribution Network Operators (DNOs) accrued due to sizing and placement of Distributed Generation (DG) units in distribution networks. The effects of DG units in reducing the reinforcement costs and active power losses of distribution network have been investigated. In the presented method, the integration of DG units in distribution network is done considering both technical and economical aspects. The strength of the proposed method is evaluated by applying it on a small and a realistic large scale distribution network and the results are compared with... 

    A distribution network expansion planning model considering distributed generation options and techo-economical issues

    , Article Energy ; Volume 35, Issue 8 , 2010 , Pages 3364-3374 ; 03605442 (ISSN) Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2010
    Abstract
    This paper presents a dynamic multi-objective model for distribution network expansion, considering the distributed generations as non-wire solutions. The proposed model simultaneously optimizes two objectives namely, total costs and technical constraint satisfaction by finding the optimal schemes of sizing, placement and specially the dynamics (i.e., timing) of investments on DG units and/or network reinforcements over the planning period. An efficient heuristic search method is proposed to find non-dominated solutions of the formulated problem and a fuzzy satisfying method is used to choose the final solution. The effectiveness of the proposed model and search method are assessed and... 

    Multi objective distributed generation planning using a binary particle swarm optimization method

    , Article 2008 International Conference on Genetic and Evolutionary Methods, GEM 2008, Las Vegas, NV, 14 July 2008 through 17 July 2008 ; 2008 , Pages 140-146 ; 1601320698 (ISBN); 9781601320698 (ISBN) Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2008
    Abstract
    With the introduction of restructuring concepts to traditional power systems, a great deal of attention is given to utilization of distributed generation. Integration of DG units has been known as an alternative for distribution network reinforcement and purchasing energy from transmission network. Considering these facts, in the planning procedure of DG, determination of optimal sizing and sitting is a very important issue. This work presents a comprehensive framework for integration of distributed generations into a distribution network, regarding various technical and economical issues such as reduction of active power losses, environmental pollutions, investment and running costs while... 

    Simultanous emergency demand response programming and unit commitment programming in comparison with interruptible load contracts

    , Article IET Generation, Transmission and Distribution ; Volume 6, Issue 7 , 2012 , Pages 605-611 ; 17518687 (ISSN) Sahebi, M. M ; Duki, E. A ; Kia, M ; Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2012
    Abstract
    Different reasons such as power system restructuring, electricity price variation in some hours of a day and growth in the fuel price, have led to more attention to demand response (DR) programmes for consumers. Two important issues in DR programmes are emergency demand response programming (EDRP) and Interruptible/Curtail able (I/C) programme that is utilised as interruptible load contracts (ILC). The EDDR is utilised to decrease the consumption in peak load or critical hours of the day. This occurs by means of customer's behaviour in response to the incentives. However, the curtailment of voluntarily loads in the critical hours considering the consumer requirements is an action that can be... 

    A probabilistic modeling of photo voltaic modules and wind power generation impact on distribution networks

    , Article IEEE Systems Journal ; Volume 6, Issue 2 , 2012 , Pages 254-259 ; 19328184 (ISSN) Soroudi, A ; Aien, M ; Ehsan, M ; Sharif University of Technology
    2012
    Abstract
    The rapid growth in use of renewable intermittent energy resources, like wind turbines (WTs) and solar panels, in distribution networks has increased the need for having an accurate and efficient method of handling the uncertainties associated with these technologies. In this paper, the unsymmetrical two point estimate method (US2PEM) is used to handle the uncertainties of renewable energy resources. The uncertainty of intermittent generation of WT, photo voltaic cells, and also electric loads, as input variables, are taken into account. The variation of active losses and imported power from the main grid are defined as output variables. The US2PEM is compared to symmetrical two point... 

    A practical eco-environmental distribution network planning model including fuel cells and non-renewable distributed energy resources

    , Article Renewable Energy ; Volume 36, Issue 1 , 2011 , Pages 179-188 ; 09601481 (ISSN) Soroudi, A ; Ehsan, M ; Zareipour, H ; Sharif University of Technology
    2011
    Abstract
    This paper presents a long-term dynamic multi-objective planning model for distribution network expansion along with distributed energy options. The proposed model optimizes two objectives, namely costs and emissions and determines the optimal schemes of sizing, placement and specially the dynamics (i.e., timing) of investments on distributed generation units and network reinforcements over the planning period. An efficient two-stage heuristic method is proposed to solve the formulated planning problem. The effectiveness of the proposed model is demonstrated by applying it to a distribution network and comparing the simulation results with other methods and models  

    SUT-DAM: An integrated software environment for multi-disciplinary geotechnical engineering

    , Article Advances in Engineering Software ; Volume 37, Issue 11 , 2006 , Pages 728-753 ; 09659978 (ISSN) Khoei, A. R ; Gharehbaghi, S. A ; Azami, A. R ; Tabarraie, A. R ; Sharif University of Technology
    Elsevier Ltd  2006
    Abstract
    As computer simulation increasingly supports engineering design, the requirement for a computer software environment providing an integration platform for computational engineering software increases. A key component of an integrated environment is the use of computational engineering to assist and support solutions for complex design. In the present paper, an integrated software environment is demonstrated for multi-disciplinary computational modeling of structural and geotechnical problems. The SUT-DAM is designed in both popularity and functionality with the development of user-friendly pre- and post-processing software. Pre-processing software is used to create the model, generate an... 

    Contact friction simulation in powder compaction process based on the penalty approach

    , Article Materials and Design ; Volume 29, Issue 6 , 2008 , Pages 1199-1211 ; 02613069 (ISSN) Keshavarz, Sh ; Khoei, A. R ; Khaloo, A. R ; Sharif University of Technology
    Elsevier Ltd  2008
    Abstract
    In this paper, the influence of powder-tool friction on the mechanical properties of the final product is investigated in pressing metal powders. A computational algorithm is presented for simulation of frictional contact in the compaction process of powder. The large deformation finite element (FE) formulation is characterized by the use of penalty approach in which a plasticity theory of friction is incorporated to simulate sliding resistance at the powder-tool interface. The constitutive relations for friction are derived from a Coulomb friction law. A double-surface cap plasticity model is employed together with the nonlinear contact friction behavior in numerical simulation of powder...