Loading...
Search for: cost-of-productions
0.008 seconds

    Study of factors affecting on the sawability of the ornamental stone

    , Article 10th International Multidisciplinary Scientific Geoconference and EXPO - Modern Management of Mine Producing, Geology and Environmental Protection, SGEM 2010, 20 June 2010 through 26 June 2010, Varna ; Volume 1 , 2010 , Pages 533-547 ; 9789549181814 (ISBN) Yousefi, R ; Mikaeil, R ; Ataei, M ; Abbasian, R ; Sharif University of Technology
    2010
    Abstract
    Ornamental stone sawability is important in predicting the prime cost of production and planning of the stone quarries and factories. Ornamental stone sawability with two standard methods, wire and circular sawing, is dependent on many parameters including; the stone that be sawn and machine characteristics and saw operating characteristic. The investigation of these parameters and the determination of the optimum working conditions for sawing machines in the stone industry is significant for establishing the most suitable and economic usage of the sawing method in the future. Up to now, various attempts have been made to determine these parameters. In this review paper, the important... 

    Multi-objective thermoeconomic optimisation for combined-cycle power plant using particle swarm optimisation and compared with two approaches: An application

    , Article International Journal of Exergy ; Volume 16, Issue 4 , 2015 , Pages 430-463 ; 17428297 (ISSN) Abdalisousan, A ; Fani, M ; Farhanieh, B ; Abbaspour, M ; Sharif University of Technology
    Inderscience Enterprises Ltd  2015
    Abstract
    This paper shows a new possible way with particle swarm optimisation (PSO) to achieve an exergoeconomic optimisation of combinedcycle power plants. The optimisation has been done using a classic exergoeconomic and genetic algorithm, and the effects of using three methods are investigated and compared. The design data of an existing plant is used for the present analysis. Two different objective functions are proposed: One minimises the total cost of production per unit of output, and maximises the total exergetic efficiency. The analysis shows that the total cost of production per unit of output is 2%, 3%and 5% lower and exergy efficiency is 4%, 8% and 6% higher with respect to the base case...