    Interruptible Load Management in Simultaneous Energy and Reserve Market

    , M.Sc. Thesis Sharif University of Technology Sahebi, Mir Mohammad Reza (Author) ; Ehsan , Mehdi (Supervisor)
    Abstract
    In restructured power system, the Independent System Operator (ISO) implements Security Constraint Unit Commitment (SCUC) for clearing of day-ahead market. In this project, SCUC is also uses for simultaneous clearing of energy and reserve market. Spinning reserve and of generating units and Interruptible Loads (IL) are considered as system operating reserves in the proposed model. Some of IL usage restrictions such as maximum load curtailed, maximum curtailment hour in a day, maximum length of each curtailment and etc is also considered. One of these constraints is interruption time (the time between ISO’s request and IL’s Answer) which is very difficult to formulate. Expected Energy Not... 

    Reliability based joint distribution network and distributed generation expansion planning

    , Article 2020 International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2020, 18 August 2020 through 21 August 2020 ; September , 2020 Kabirifar, M ; Fotuhi Firuzabad, M ; Moeini Aghtaie, M ; Pourghaderi, N ; Lehtonen, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2020
    Abstract
    In this paper the reliability of distribution network is modeled in joint multistage expansion planning of distribution network assets and distributed generations (DGs). The imposed costs due to network reliability weakness are considerable in the distribution level. Therefore in the proposed model distribution network operator (DNO) considers the costs associated with load interruptions in the planning problem. In this regard, reliability evaluation of the network is modeled in the joint multistage distribution network expansion planning (MDNEP) problem in an integrated manner while the network topology is unknown until the planning problem is not solved. In the proposed joint MDNEP problem...