    Sequence-dependent flow shop scheduling problem minimising the number of tardy jobs

    , Article International Journal of Production Research ; Volume 50, Issue 20 , 2012 , Pages 5843-5858 ; 00207543 (ISSN) Varmazyar, M ; Salmasi, N ; Sharif University of Technology
    2012
    Abstract
    Flow shop scheduling problems with sequence-dependent setup times and minimising the number of tardy jobs as the criterion (F m |prmu, S ijk |∑U j) are considered in this research. A mixed-integer linear programming model is developed for the research problem. Since the proposed research problem has been proven to be NP-hard, several meta-heuristic algorithms based on tabu search (TS) and the imperialist competitive algorithm (ICA) are proposed to heuristically solve the problem. In order to find the best meta-heuristic algorithm, random test problems, ranging in size from small, medium, to large, are generated and solved by the meta-heuristic algorithms. Then, a detailed statistical... 

    Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times

    , Article International Journal of Advanced Manufacturing Technology ; Volume 40, Issue 11-12 , 2009 , Pages 1216-1226 ; 02683768 (ISSN) Mansouri, S. A ; Hendizadeh, S. H ; Salmasi, N ; Sharif University of Technology
    2009
    Abstract
    A two-machine flowshop scheduling problem is addressed to minimize setups and makespan where each job is characterized by a pair of attributes that entail setups on each machine. The setup times are sequence-dependent on both machines. It is shown that these objectives conflict, so the Pareto optimization approach is considered. The scheduling problems considering either of these objectives are N p - hard, so exact optimization techniques are impractical for large-sized problems. We propose two multi-objective metaheurisctics based on genetic algorithms (MOGA) and simulated annealing (MOSA) to find approximations of Pareto-optimal sets. The performances of these approaches are compared with...