    A heuristic fuzzy decision-based solving of redispatching problem for congestion management in restructured power systems

    , Article Journal of Intelligent and Fuzzy Systems ; Volume 24, Issue 3 , 2013 , Pages 563-574 ; 10641246 (ISSN) Meyabadi, A. F ; Ehsan, M ; Sharif University of Technology
    2013
    Abstract
    This paper proposes a new technique to manage congestion in a short-run market model. The method consists of an iterative algorithm to search and apply a sequence of bilateral power exchanges among the generators that would optimally reduce and completely remove the congestions. A combination of fuzzy decision principle and sensitivity analysis is developed to choose the best exchange and AC load flow is used to apply it on the network in the iterations. The effectiveness of the proposed approach is illustrated in a case study on IEEE 118-bus system, and results are discussed in the paper in comparison with the mathematical and evolutionary-based optimization techniques  

    Power system stability assessment during restoration based on a wide area measurement system

    , Article IET Generation, Transmission and Distribution ; Volume 6, Issue 11 , 2012 , Pages 1171-1179 ; 17518687 (ISSN) Nourizadeh, S ; Karimi, M. J ; Ranjbar, A. M ; Shirani, A ; Sharif University of Technology
    2012
    Abstract
    Online power system stability assessment during restoration has not been strongly addressed yet. The introduction of wide area measurement systems (WAMS), however, made it possible to monitor the stability online. This study technically presents a detailed analysis of stability during restoration using WAMS. The power system build-up strategy is used as the restoration approach, based on which the early and the last stages of restoration are to divide the power system into islands and interconnect them, respectively. In fact, the practical use of WAMS at the early stages of restoration provides precise determination of generators loading steps. Moreover, unification of phase angle references... 

    Simultanous emergency demand response programming and unit commitment programming in comparison with interruptible load contracts

    , Article IET Generation, Transmission and Distribution ; Volume 6, Issue 7 , 2012 , Pages 605-611 ; 17518687 (ISSN) Sahebi, M. M ; Duki, E. A ; Kia, M ; Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2012
    Abstract
    Different reasons such as power system restructuring, electricity price variation in some hours of a day and growth in the fuel price, have led to more attention to demand response (DR) programmes for consumers. Two important issues in DR programmes are emergency demand response programming (EDRP) and Interruptible/Curtail able (I/C) programme that is utilised as interruptible load contracts (ILC). The EDDR is utilised to decrease the consumption in peak load or critical hours of the day. This occurs by means of customer's behaviour in response to the incentives. However, the curtailment of voluntarily loads in the critical hours considering the consumer requirements is an action that can be... 

    A sectionalizing method in power system restoration based on wide area measurement systems

    , Article EPEC 2010 - IEEE Electrical Power and Energy Conference: "Sustainable Energy for an Intelligent Grid", 25 August 2010 through 27 August 2010 ; August , 2010 ; 9781424481880 (ISBN) Nezam Sarmadi, S. A ; Salehi Dobakhshari, A ; Azizi, S ; Ranjbar, A. M ; Nouri Zadeh, S ; Sharif University of Technology
    Abstract
    This paper presents a novel sectionalizing method for the build-up strategy in power system restoration. Power system restoration is the procedure of restoring power system elements after a partial or a complete blackout. Because of its economic and political importance, different strategies have been developed for power system restoration. One of the most practical and economical is the build-up strategy that includes the process of restoring separated parts (islands) in the power system and interconnecting them afterwards. This paper intends to develop a systematic algorithm for sectionalizing a power system considering various constraints such as black-start capability of generators,...