Optimal installation capacity of medium hydro-power plants considering technical, economic and reliability indices
, Article International Journal of Power and Energy Systems ; Volume 28, Issue 1 , 2008 , Pages 15-22 ; 10783466 (ISSN) ; Forouzbakhsh, F ; Fotuhi Firuzabad, M ; Sharif University of Technology
Acta Press
2008
Abstract
One of the most important issues in planning the reservoir type of Medium Hydro-Power Plants (MHPP) is to determine the optimal installation capacity of the MHPP and estimate its optimal annual energy value. In this paper, a method is presented to calculate the annual energy. A computer program has been developed to analyse energy calculation and estimation of the most important economic indices of an MHPP using the sensitivity analysis method. Another program, developed by Matlab software, calculates the reliability indices for a number of units of an MHPP with a specified load duration curve using the Monte Carlo method. Ultimately, comparing the technical, economic and reliability indices...
Determination of installation capacity in reservoir hydro-power plants considering technical, economical and reliability indices
, Article International Journal of Electrical Power and Energy Systems ; Volume 30, Issue 6-7 , 2008 , Pages 393-402 ; 01420615 (ISSN) ; Forouzbakhsh, F ; Fotouhi, M ; Vakilian, M ; Sharif University of Technology
2008
Abstract
One of the most important issues in planning the "reservoir" type of hydro-power plants (HPP) is to determine the installation capacity of the HPPs and estimate its annual energy value. In this paper, a method is presented. A computer program has been developed to analyze energy calculation and estimation of the most important economic indices of an HPP using the sensitivity analysis method. Another program, developed by Matlab software, calculates the reliability indices for a number of units of an HPP with a specified load duration curve using the Monte Carlo method. Ultimately, comparing the technical, economic and reliability indices will determine the installation capacity of an HPP. By...
Developing a stochastic framework to determine the static reserve requirements of high-wind penetrated power systems
, Article Journal of Intelligent and Fuzzy Systems ; Volume 29, Issue 5 , 2015 , Pages 2039-2046 ; 10641246 (ISSN) ; Abbaspour, A ; Fotuhi Firuzabad, M ; Moeini Aghtaie, M ; Sharif University of Technology
IOS Press
2015
Abstract
Operational and planning studies of high-wind penetrated power systems have well come to the light as a major concern of future energy systems. This paper focuses on the procedure of determining required static reserve of the high-wind penetrated power systems which has not been well accompanied by comprehensive analysis and proper modeling tools. To reach this goal, first, a probabilistic algorithm has been proposed to effectively model the variations in output generation of wind turbines. In this algorithm, the fuzzy c-means clustering method (FCM) is exploited as an efficient as well as robust clustering method to find the multi-state model of wind turbines output generation. Based on...
Possibilistic evaluation of distributed generations impacts on distribution networks
, Article IEEE Transactions on Power Systems ; Volume 26, Issue 4 , 2011 , Pages 2293-2301 ; 08858950 (ISSN) ; Ehsan, M ; Caire, R ; Hadjsaid, N ; Sharif University of Technology
Abstract
In deregulated power systems, the distribution network operator (DNO) is not responsible for investment in distributed generation (DG) units, and they are just concerned about the best architecture ensuring a good service quality to their customers. The investment and operating decisions related to DG units are then taken by entities other than DNO which are exposed to uncertainty. The DNO should be able to evaluate the technical effects of these uncertain decisions. This paper proposes a fuzzy evaluation tool for analyzing the effect of investment and operation of DG units on active losses and the ability of distribution network in load supply at presence of uncertainties. The considered...