Loading...
Search for: interruption-costs
0.004 seconds
Total 26 records

    Impact of distributed generation resources on customer interruption cost

    , Article 2004 International Conference on Power System Technology, POWERCON 2004, 21 November 2004 through 24 November 2004 ; Volume 1 , 2004 , Pages 856-861 ; 0780386108 (ISBN) Rajabi Ghahnavie, A ; Fotuhi Firuzabad, M ; Parniani, M ; Sharif University of Technology
    2004
    Abstract
    The electric power industry around the world is presently undergoing considerable changes with respect to structure, operation and regulation. Distributed generation is expected to play a major role in this new environment One the main benefits of DG is to enhance system reliability as it can restore power to the separated or bottle-necked part of distribution system in case of a contingency occurs. This paper presents an approach to examine and evaluates the applicability and customer interruption cost analysis in DG-connected distribution system in a specified planning horizon. The impacts on customer interruption cost reduction of different load growth rate, DG location and different... 

    Optimal reliable operation of hydrothermal power systems with random unit outages

    , Article IEEE Transactions on Power Systems ; Volume 18, Issue 1 , 2003 , Pages 279-287 ; 08858950 (ISSN) Amjady, N ; Farrokhzad, D ; Modarres, M ; Sharif University of Technology
    2003
    Abstract
    A new model for long-term operation of hydrothermal power systems is introduced and a method for obtaining an optimal solution is also developed. We assume that reservoir inflows and energy demand are stochastic and all units are exposed to random outages. The objective is to minimize the total cost of the system as well as the expected interruption cost of energy (EIC) during a given planning horizon. This goal is reached through determination of hydroplant discharges, thermal units energy output, and the system reliability level simultaneously. In fact, we integrate long-term hydrothermal system operation planning and system reliability determination in a unified model. Since the resulting... 

    Optimal Reliable Operation of Hydrothermal Power Systems with Random Unit Outages

    , Article IEEE Power Engineering Review ; Volume 22, Issue 11 , 2002 , Pages 59- ; 02721724 (ISSN) Amjady, N ; Farrokhzad, D ; Modarres, M ; Sharif University of Technology
    2002
    Abstract
    A new model for long-term operation of hydrothermal power systems is introduced, and a method for obtaining an optimal solution is developed. We assume both reservoir inflows and energy demand are stochastic and all units are exposed to random outages. The objective is to minimize the total cost of the system as well as the expected interruption cost of energy (EIC) during a given planning horizon. This goal is reached through simultaneous determination of hydro plant discharges, thermal units energy output, and the system reliability level. Long-term hydrothermal system operation planning and system reliability determination are integrated in a unified model. Since the resulting model is a... 

    Prioritizing demand response programs from reliability aspect

    , Article 2012 11th International Conference on Environment and Electrical Engineering, EEEIC 2012 - Conference Proceedings ; 2012 , Pages 229-234 ; 9781457718281 (ISBN) Nikzad, M ; Bashirvand, M ; Mozafari, B ; Ranjbar, A. M ; Sharif University of Technology
    IEEE  2012
    Abstract
    In this paper, the impact of demand response programs (DRPs) on reliability improvement of the restructured power systems is quantified. In this regard, the demand response (DR) model which treats consistently the main characteristics of the demand curve is developed for modeling. In proposed model, some penalties for customers in case of no responding to load reduction and incentives for customers who respond to reducing their loads are considered. In order to make analytical evaluation of the reliability, a mixed integer DCOPF is proposed by which load curtailments and generation re-dispatches for each contingency state are determined. Both transmission and generation failures are... 

    Optimal placement of sectionalizing switch considering switch malfunction probability

    , Article IEEE Transactions on Smart Grid ; 2017 ; 19493053 (ISSN) Farajollahi, M ; Fotuhi Firuzabad, M ; Safdarian, A ; Sharif University of Technology
    Abstract
    Sectionalizing switches (SSs) are often presumed to function fully reliable. However, SSs are exposed to have some malfunctions, whereby undermining their ability to improve service reliability. This study presents a model to integrate SS malfunction probability into SS placement problem. The model aims to minimize the total SSs costs as well as customers interruption cost. The proposed model is formulated in mixed integer programing (MIP), which can be easily solved via several available solvers and gain global optimal solution. The proposed model indicates the extent to which the placement problem is affected by uncertainty associated with SSs functionality, and how not considering SSs... 

    Impact of reliability considerations on network topology optimization

    , Article 26th Iranian Conference on Electrical Engineering, ICEE 2018, 8 May 2018 through 10 May 2018 ; 2018 , Pages 1215-1220 ; 9781538649169 (ISBN) Zargar Rezaee, A ; Fotuhi Firuzabad, M ; Farzin, H ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2018
    Abstract
    Optimal transmission switching (OTS) along with optimal bus-bar switching, also known as network topology optimization (NTO), has been previously proposed and utilized as a powerful tool to reduce operational costs. However, operational constraints and reliability considerations of NTO problem have not been addressed properly. In this paper, operational constraints are integrated in NTO problem and the effect of transmission network switching on expected interruption cost (EIC) is investigated. Moreover, a novel approach based on pool of solutions approach is presented, which can generate various switching scenarios. In doing so, the decision maker would be able to analyze and choose the... 

    Optimal placement of sectionalizing switch considering switch malfunction probability

    , Article IEEE Transactions on Smart Grid ; Volume 10, Issue 1 , 2019 , Pages 403-413 ; 19493053 (ISSN) Farajollahi, M ; Fotuhi Firuzabad, M ; Safdarian, A ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2019
    Abstract
    Sectionalizing switches (SSs) are often presumed to function fully reliable. However, SSs are exposed to have some malfunctions, whereby undermining their ability to improve service reliability. This paper presents a model to integrate SS malfunction probability into SS placement problem. The model aims to minimize the total SSs costs as well as customers interruption cost. The proposed model is formulated in mixed integer programing, which can be easily solved via several available solvers and gain global optimal solution. The proposed model indicates the extent to which the placement problem is affected by uncertainty associated with SSs functionality, and how not considering SSs... 

    Optimal placement of sectionalizing switch considering switch malfunction probability

    , Article IEEE Transactions on Smart Grid ; Volume 10, Issue 1 , 2019 , Pages 403-413 ; 19493053 (ISSN) Farajollahi, M ; Fotuhi Firuzabad, M ; Safdarian, A ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2019
    Abstract
    Sectionalizing switches (SSs) are often presumed to function fully reliable. However, SSs are exposed to have some malfunctions, whereby undermining their ability to improve service reliability. This paper presents a model to integrate SS malfunction probability into SS placement problem. The model aims to minimize the total SSs costs as well as customers interruption cost. The proposed model is formulated in mixed integer programing, which can be easily solved via several available solvers and gain global optimal solution. The proposed model indicates the extent to which the placement problem is affected by uncertainty associated with SSs functionality, and how not considering SSs... 

    Customer interruption cost in smart grids

    , Article IEEE Transactions on Power Systems ; Vol. 29, issue. 2 , 2014 , p. 994-995 ; ISSN: 8858950 Safdarian, A ; Lehtonen, M ; Fotuhi-Firuzabad, M ; Billinton, R ; Sharif University of Technology
    Abstract
    Customers participating in demand response programs known as active customers provide significant flexibility in demand, thereby causing a meaningful reduction in customer interruption cost (CIC) during critical periods. This letter illustrates the impact on the amount of CIC of active customers' flexible demand realized by smart grid technologies. The focus of this letter is on residential electricity use. The study is applied to actual data from Kainuu, Finland  

    Distribution network reliability improvements in presence of demand response

    , Article IET Generation, Transmission and Distribution ; Vol. 8, issue. 12 , 2014 , p. 2027-2035 ; ISSN: 17518687 Safdarian, A ; Degefa, M.Z ; Lehtonen, M ; Fotuhi-Firuzabad, M ; Sharif University of Technology
    Abstract
    Demand response (DR) as a key integral part of the future smart grid is gaining a great and still growing focus of attention in nowadays electric power industries. However, many potential benefits of DR, although they have been envisioned to be significant, have not been yet thoroughly and quantitatively investigated. DR provides network operators with the opportunity to mitigate operational limit violations by load modification in place of load shedding when network reliability is jeopardised. This paper aims to comprehensively assess the potential impacts of DR on major attributes of service reliability in a residential distribution network. For doing so, firstly, load profiles for major... 

    Reliability evaluation in power distribution system planning studies

    , Article 2016 International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2016 - Proceedings, 16 October 2016 through 20 October 2016 ; 2016 ; 9781509019700 (ISBN) Heidari, S ; Fotuhi Firuzabad, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2016
    Abstract
    In distribution system planning studies, reliability evaluation is performed during optimization procedure to calculate the interruption cost, DISCO's income and to check the viability of constraints related to reliability indices. In each iteration of the optimization algorithm a special plan is evaluated that is different from other plans. So the configuration and specification of the network which is one of the input information for reliability evaluation is changing continuously that makes difficulties for this evaluation. To solve these difficulties, this paper presents a systematic method for reliability evaluation in distribution planning studies. The proposed approach can be... 

    Incorporating Customer Reliability Cost in PEV Charge Scheduling Schemes Considering Vehicle-to-Home Capability

    , Article IEEE Transactions on Vehicular Technology ; Volume 64, Issue 7 , 2015 , Pages 2783-2791 ; 00189545 (ISSN) Alahyari, A ; Fotuhi Firuzabad, M ; Rastegar, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2015
    Abstract
    As the number of plug-in electric vehicles (PEVs) increases, so might their issues and impacts on the power system performance. Toward eliminating the negative impacts of PEVs on the power system, installation of a charging controller at customers' homes, which addresses such issues and brings convenience for customers, is fundamentally required in the smart grid era. This paper develops a novel in-home PEV charge/discharge scheduling method that employs vehicle-to-home (V2H) capability to schedule level of charging/discharging at each time slot. In doing so, a household controller minimizes customer payment cost and reliability cost. The proposed charging algorithm not only responds to... 

    Outage management in residential demand response programs

    , Article IEEE Transactions on Smart Grid ; Volume 6, Issue 3 , August , 2015 , Pages 1453-1462 ; 19493053 (ISSN) Rastegar, M ; Fotuhi Firuzabad, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2015
    Abstract
    This paper proposes a novel optimization based home load control (HLC) to manage the operation periods of responsive electrical appliances, determine several recommended operation periods for nonresponsive appliances, and schedule the charge/discharge cycling of plug-in hybrid electric vehicle (PHEV) considering various customer preferences. The customer preferences are in the format of payment cost, interruption cost, and different operational constraints. The projected algorithm is online, in which household appliances are initially scheduled based on the payment cost, and when the home load is interrupted, the scheduling will be updated to minimize customer interruption cost. Due to... 

    A multistage MILP-based model for integration of remote control switch into distribution networks

    , Article 2016 International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2016 - Proceedings, 16 October 2016 through 20 October 2016 ; 2016 ; 9781509019700 (ISBN) Izadi, M ; Farajollahi, M ; Safdarian, A ; Fotuhi Firuzabad, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2016
    Abstract
    In the past decades, remote control switches have been broadly integrated into distribution systems to achieve a certain level of service reliability. To take utmost benefits of them, a cost-benefit analysis should be conducted. In this regard, the budget restriction plays a crucial role in remote control switch placement. This paper is aimed at proposing a model to determine the optimal number and location of remote control switches in a distribution system. As the main contribution of the paper, the model is developed in multistage planning format to address the issue of budget limitation. To this end, the model is formulated in mixed integer linear programming format, which tries to... 

    A novel approach for assessing the impacts of voltage sag events on customer operations

    , Article PQ 2012: 8th International Conference - 2012 Electric Power Quality and Supply Reliability, Conference Proceedings ; 2012 , p. 125-130 ; ISBN: 9781470000000 Yasir, M ; Kazemi, S ; Lehtonen, M ; Fotuhi-Firuzabad, M ; Sharif University of Technology
    Abstract
    The business activities of the majority of industrial and commercial customers are dependent on some critical equipments that are susceptible to voltage sag events. This paper aims to propose a novel approach to estimate the financial impacts of voltage sag events on customer operations. The proposed technique is based on the event tree method. Using this approach, it is possible to consider the impacts of operational failure of various sensitive equipments, involved in the customer operations, on the financial losses expected from voltage sag events. A quantitative case study is conducted in the paper to illustrate the applicability of the proposed approach  

    Deployment of fault indicator in distribution networks: a MIP-based approach

    , Article IEEE Transactions on Smart Grid ; Volume 9, Issue 3 , May , 2018 , Pages 2259-2267 ; 19493053 (ISSN) Farajollahi, M ; Fotuhi Firuzabad, M ; Safdarian, A ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2018
    Abstract
    Fault indicator (FI) plays a crucial rule in enhancing service reliability in distribution systems. This device brings substantial benefits for fault management procedure by speeding up fault location procedure. This paper intends to develop a new optimization model to optimally deploy FI in distribution systems. The proposed model aims to consider a tradeoff between the total customer interruption cost and FI relevant costs, including capital investment, installation, and maintenance costs. As the main contribution of this paper, the problem is formulated in mixed integer programing, which guarantees global optimum solution achieved in an effective runtime. Moreover, the model takes... 

    Impacts of automatic control systems of loop restoration scheme on the distribution system reliability

    , Article IET Generation, Transmission and Distribution ; Volume 3, Issue 10 , 2009 , Pages 891-902 ; 17518687 (ISSN) Kazemi, S ; Fotuhi Firuzabad, M ; Sanaye Pasand, M ; Lehtonen, M ; Sharif University of Technology
    2009
    Abstract
    Loop restoration scheme (LRS) is a special feeder automation (FA) scheme, which is used by utilities to improve distribution system reliability. The LRS is controlled and managed by its automatic control system (ACS). The impacts on distribution system reliability indices of implementing LRS mainly depend on the type of its ACS. Two common types of ACS of LRS are presented and used in this study. Successful operation of ACS is dependent on the protection and automatic control functions of switching devices of LRS. Different failure modes of these switching devices can therefore affect the procedure of ACS in fault detecting, isolating and service restoration. The impacts of failure of... 

    Effect of sectionalizing switches malfunction probability on optimal switches placement in distribution networks

    , Article International Journal of Electrical Power and Energy Systems ; Volume 119 , July , 2020 Khani, M ; Safdarian, A ; Sharif University of Technology
    Elsevier Ltd  2020
    Abstract
    Sectionalizing switches (SSs) are installed in distribution networks to provide ring and maneuver points, thereby increasing service reliability. These switches are either manual switches (MSs) or remote controlled switches (RCSs). The switches are usually assumed to be fully reliable. However, in practice, their performance is not always ideal. Actually, the switches may sometimes experience malfunction, which reduces their ability to enhance system reliability. The present study proposes a model to consider the malfunction possibility of the switches in their optimal placement problem. The model helps to minimize the total costs of SSs as well as the interruption costs incurred by... 

    Fuzzy generating units dispatch considering the load interruption cost

    , Article 42nd International Conference on Large High Voltage Electric Systems 2008, CIGRE 2008, Paris, 24 August 2008 through 29 August 2008 ; 2008 Shafiezadeh, M. A ; Ahmadi Khatir, A ; Jamshidi, A ; Sharif University of Technology
    2008
    Abstract
    In the new environment of power system, generating units dispatch problem plays an important role inasmuch as it is used to clear power market transactions. That is, market operator solves an optimization problem in order to find the energy and capacity reserve quota of each generating units participating in the power market. There are different techniques for solving this problem which differ in many aspects, including the objective function, optimization algorithm, and feasibility, so using an efficient technique is vital. In the real competitive electricity market, the components of generating units dispatch problem are faced with the uncertainties; therefore, due to the presence of... 

    Integration of large-scale wind farm projects including system reliability analysis

    , Article IET Renewable Power Generation ; Vol. 5, issue. 1 , 2011 , p. 89-98 ; ISSN: 17521416 Salehi-Dobakhshari, A ; Fotuhi-Firuzabad, M ; Sharif University of Technology
    Abstract
    This study intends to develop a comprehensive procedure for evaluating locational value of a wind farm project incorporating reduction in transmission system losses, load delivery point interruption cost and operating cost of generating units. The energy extracted from the wind farm in normal operation condition is considered to replace the energy from fossil-fueled conventional units. In addition, composite system reliability analysis in the presence of wind power is carried out to evaluate total costs associated with curtailed energy at different load points as well as generation of generating units in contingency conditions. System reliability analysis related to large-scale wind farms,...