Loading...
Search for: max-min-method
0.003 seconds

    Probabilistic dynamic multi-objective model for renewable and non-renewable distributed generation planning

    , Article IET Generation, Transmission and Distribution ; Volume 5, Issue 11 , 2011 , Pages 1173-1182 ; 17518687 (ISSN) Soroudi, A ; Caire, R ; Hadjsaid, N ; Ehsan, M ; Sharif University of Technology
    2011
    Abstract
    This study proposes a probabilistic dynamic model for multi-objective distributed generation (DG) planning, which also considers network reinforcement at presence of uncertainties associated with the load values, generated power of wind turbines and electricity market price. Monte Carlo simulation is used to deal with the mentioned uncertainties. The planning process is considered as a two-objective problem. The first objective is the minimisation of total cost including investment and operating cost of DG units, the cost paid to purchase energy from main grid and the network reinforcement costs. The second objective is defined as the minimisation of technical risk, including the probability...