Total 26 records

    A scatter search algorithm for RCPSP with discounted weighted earliness-tardiness costs

    , Article Life Science Journal ; Volume 8, Issue 2 , 2011 , Pages 634-640 ; 10978135 (ISSN) Khalilzadeh, M ; Kianfar, F ; Ranjbar, M ; Sharif University of Technology
    Abstract
    In this paper, we study a resource-constrained project scheduling problem in which a set of project activities have due dates. If the finish time of each one of these activities is not equal to its due date, an earliness or a tardiness cost exists for each tardy or early period. The objective is to minimize the sum of discounted weighted earliness-tardiness penalty costs of these activities. Scatter Search algorithm is used to deal with this extended form of resource-constrained project scheduling problem. Our implementation of Scatter Search integrates the advanced methods such as dynamic updating of the reference set and the use of frequency-based memory within the diversification... 

    Fuzzy project scheduling with discounted cash flows

    , Article Economic Computation and Economic Cybernetics Studies and Research ; Volume 5 , 2012 ; 0424267X (ISSN) Shavandi, H ; Najafi, A. A ; Moslehirad, A ; Sharif University of Technology
    Abstract
    Project scheduling to maximize the net present value of the cash flows has been a topic of recent research. These researches assume that the duration of activities is known either with certitude or at least with some probability. However, in many applications the structure of the duration of activities is imprecise. In this paper, the project scheduling problem with discounted cash flows under fuzzy environment is considered. The duration of activities are assumed triangular fuzzy numbers. The derived mathematical model is a multi-objective non-linear programming model and for solving it the Taylor expansion is used to transform the objective function to a linear form. To interpret the fuzzy... 

    A genetic algorithm for resource investment problem with discounted cash flows

    , Article Applied Mathematics and Computation ; Volume 183, Issue 2 , 2006 , Pages 1057-1070 ; 00963003 (ISSN) Najafi, A. A ; Akhavan Niaki, S. T ; Sharif University of Technology
    2006
    Abstract
    A resource investment problem with discounted cash flows is a project scheduling problem in which the availability levels of the resources are considered decision variables and the goal is to find a schedule and resource requirement levels such that the net present value of the project cash flows optimizes. In this paper, we present a genetic algorithm to solve this problem. We explain the elements of the algorithm such as chromosome structure, fitness function, crossover, mutation, and local improvement operations and solve more than 220 problems with known optimal solutions to evaluate the performance of the proposed algorithm. The results of the experimentation are quite satisfactory. ©... 

    Hydro-economical Method for the Optimal Capacity Design of Small Hydropower Plant (Case Study: Kohneh Lahijan Hydropower Plant)

    , M.Sc. Thesis Sharif University of Technology Mehrvand, Shahryar (Author) ; Shamsai, Abolfazl (Supervisor)
    Abstract
    In this thesis, we determine the optimal capacity of the power plants considering site specifications and Flow Duration Curve and evaluating economic parameters. Finally a design with more sufficient economical and hydrualical performance would be selected. The optimization algorithm used in this thesis is called "Charged System search" that is one of the newest meta-heuristic algorithms. This algorithm is inspired by the coulomb and gauss's laws of electrostatics in physics and utilizes a number of charged particles which influence each other based on their fitness values and their separation distances considering the governing law of coulomb.The proposed method in this thesis can be... 

    Design and Optimization of a 10 kW Dish/Stirling System

    , M.Sc. Thesis Sharif University of Technology Nazemi, Danial (Author) ; Boroushaki, Mehrdad (Supervisor) ; Rajabi Qahnuyeh, Abbas (Supervisor)
    Abstract
    Nowadays, electricity generation technology from renewable resources, especially solar energy has been very popular; specifically off-grid systems which have the ability of decentralized electricity generation. Dish/Stirling system is one of the most efficient technologies with capability of decentralized electricity generation from solar energy. The purpose of this study is design, optimization and analysis of a 10 KW Dish/Stirling system for different working location in Iran.
    A mathematical model is introduced to analyze all the heat losses in different system components including parabolic dish, cavity receiver and Stirling engine. All the calculations are done with MATLABTM... 

    A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations

    , Article Computers and Operations Research ; Volume 36, Issue 11 , 2009 , Pages 2994-3001 ; 03050548 (ISSN) Najafi, A. A ; Akhavan Niaki, T ; Shahsavar, M ; Sharif University of Technology
    2009
    Abstract
    A resource investment problem with discounted cash flows (RIPDCF) is a project-scheduling problem in which (a) the availability levels of the resources are considered decision variables and (b) the goal is to find a schedule such that the net present value of the project cash flows optimizes. In this paper, the RIPDCF in which the activities are subject to generalized precedence relations is first modeled. Then, a genetic algorithm (GA) is proposed to solve this model. In addition, design of experiments and response surface methodology are employed to both tune the GA parameters and to evaluate the performance of the proposed method in 240 test problems. The results of the performance... 

    An algorithm for the weighted earliness-tardiness unconstrained project scheduling problem

    , Article Journal of Applied Sciences ; Volume 8, Issue 9 , 2008 , Pages 1651-1659 ; 18125654 (ISSN) Afshar Nadjafi, B ; Shadrokh, S ; Sharif University of Technology
    2008
    Abstract
    This research considers a project scheduling problem with the object of minimizing weighted earliness-tardiness penalty costs, taking into account a deadline for the project and precedence relations among the activities. An exact recursive method has been proposed for solving the basic form of this problem. We present a new depth-first branch and bound algorithm for extended form of the problem, which time value of money is taken into account by discounting the cash flows. The algorithm is extended with two bounding rules in order to reduce the size of the branch and bound tree. Finally, some test problems are solved and computational results are reported. © 2008 Asian Network for Scientific... 

    Resource investment problem with discounted cash flows

    , Article International Journal of Engineering, Transactions B: Applications ; Volume 18, Issue 1 , 2005 , Pages 53-64 ; 1728-144X (ISSN) Najafi, A. A ; Akhavan Niaki, S. T ; Sharif University of Technology
    Materials and Energy Research Center  2005
    Abstract
    A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered as decision variables and the goal is to find a schedule, and resource requirement levels, such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash flows. We call this problem as Resource Investment Problem with Discounted Cash Flows (RIPDCF) and we develop a heuristic method to solve it. Results of several numerical examples show that the proposed method performs relatively well  

    Effective Optimization of Oil Production by Waterflooding

    , Ph.D. Dissertation Sharif University of Technology Yasari, Elham (Author) ; Pishvaie, Mahmoud Reza (Supervisor) ; Khorasheh, Farhad (Supervisor) ; Salahshour, Karim (Supervisor) ; Kharrat, Riyaz (Supervisor)
    Abstract
    Reservoir lifetime optimization is an important issue. The policies that are used for maximum production using optimization methods become challenging in the presence of uncertainty. Robust Optimization (RO) method is a technique to deal with uncertainty. Because of insufficient data, uncertainty is an inherent characteristic of reservoir model. This leads to inexact solutions of an optimization problem. Also, design based on uncertainty in economic parameters, especially uncertain oil price is a challenging issue. Taking the uncertainty explicitly is a solution when there is no measurement available. To take into account uncertainty several possible values (realizations) for the uncertainty... 

    Evaluation of Methanol Value Chain

    , M.Sc. Thesis Sharif University of Technology Soleimani, Ali (Author) ; Maleki, Abbas (Supervisor) ; Hosseini, Ali (Supervisor)
    Abstract
    In this research, a general model is proposed aiming at establishment of optimized application of Methane gas with maximum added value. That is, maximum added value of methane for different applications of methane including consumption as fuel, export and injection-to-wells are calculated and compared. Accordingly, results of this study are used for decision making regarding Iran’s most important gas reservoirs. In this study, maximum present net value of investment concerning comparison of petrochemical industry input and export to a number of selected countries in addition to injection in 20 years is calculated based on a specific discount rate. It is noteworthy that the scope of this... 

    Experimental Investigation of Polymer Flooding for more Heavy Oil Recovery; Comparing to the Thermal EOR Method

    , M.Sc. Thesis Sharif University of Technology Ashoorian, Sefatallah (Author) ; Ayatollahi, Sahab (Supervisor) ; Masihi, Mohsen (Supervisor)
    Abstract
    Heavy oil reservoirs are becoming more important as the oil price increase and more light oil reservoirs are being depleted. Thermal oil recovery, especially steam flooding is considered as the most efficient EOR technique for heavy oil reservoirs that stays on the top of the recent EOR field experiences. However this method is not applicable in some reservoir conditions like deep reservoirs or reservoirs with thin pay zones.
    Due to sever viscous fingering during water flooding heavy oil reservoirs, a large amount of oil would remain untouched in the reservoir. Polymer flooding could be a potential method for enhanced oil recovery by improving sweep efficiency. However there haven’t been... 

    Well placement optimization using a particle swarm optimization algorithm, a novel approach

    , Article Petroleum Science and Technology ; Vol. 32, issue. 2 , 2014 , pp. 170-179 ; ISSN: 10916466 Afshari, S ; Pishvaie, M. R ; Aminshahidy, B ; Sharif University of Technology
    Abstract
    Optimal well placement is a crucial step in reservoir development process. The key points in such an optimization process are using a fast function evaluation tool and development of an efficient optimization algorithm. This study presents an approach that uses particle swarm optimization algorithm in conjunction with streamline simulation to determine the optimum well locations within a reservoir, regarding a modified net present value as the objective. Performance of this algorithm was investigated through several different examples, and compared to that of genetic algorithm (GA) and simulated annealing (SA) methods. It was observed that particle swarm optimization algorithm outperformed... 

    Effect of financial and technical uncertainty on distribution network reconstruction project selection

    , Article IET Conference Publications ; Volume 2013, Issue 615 CP , 2013 ; 9781849197328 (ISBN) Mostafavi, M ; Eini, B. J ; Mehrabi, A ; Naghdi, M ; Sharif University of Technology
    2013
    Abstract
    Distribution companies are pressurized into investing in many projects for ensuring customer satisfaction and increasing their profitability. There are a lot of feasible projects that may help companies to improve their services, but resources for accomplishing them are limited. Therefore, financial subjects are crucially important for related decision making and budget allocation is a bone of contention between different departments of companies. Project net present value (NPV), which depends on investment, expected annual profit, interest rate and inflation rate, is realistic criterion of project economic value. Interest rate and inflation rate are not predefined coefficients.... 

    Bi-objective resource constrained project scheduling problem with makespan and net present value criteria: Two meta-heuristic algorithms

    , Article International Journal of Advanced Manufacturing Technology ; Volume 69, Issue 1-4 , 2013 , Pages 617-626 ; 02683768 (ISSN) Khalili, S ; Najafi, A. A ; Niaki, S.T. A ; Sharif University of Technology
    2013
    Abstract
    Traditionally, the model of a resource-constrained project-scheduling problem (RCPSP) contains a single objective function of either minimizing project makespan or maximizing project net present value (NPV). In order to be more realistic, in this paper, two multi-objective meta-heuristic algorithms of multi-population and two-phase sub-population genetic algorithms are proposed to find Pareto front solutions that minimize the project makespan and maximize the project NPV of a RCPSP, simultaneously. Based on standard test problems constructed by the RanGen project generator, a comprehensive computational experiment is performed, where response surface methodology is employed to tune the... 

    Optimizing multi-item multi-period inventory control system with discounted cash flow and inflation: Two calibrated meta-heuristic algorithms

    , Article Applied Mathematical Modelling ; Volume 37, Issue 4 , 2013 , Pages 2241-2256 ; 0307904X (ISSN) Mousavi, S. M ; Hajipour, V ; Niaki, S. T. A ; Alikar, N ; Sharif University of Technology
    2013
    Abstract
    A mixed binary integer mathematical programming model is developed in this paper for ordering items in multi-item multi-period inventory control systems, in which unit and incremental quantity discounts as well as interest and inflation factors are considered. Although the demand rates are assumed deterministic, they may vary in different periods. The situation considered for the problem at hand is similar to a seasonal inventory control model in which orders and sales happen in a given season. To make the model more realistic, three types of constraints including storage space, budget, and order quantity are simultaneously considered. The goal is to find optimal order quantities of the... 

    Dynamic optimization of water flood reservoirs with the variational approach

    , Article Petroleum Science and Technology ; Vol. 32, issue. 3 , Dec , 2013 , p. 289-296 ; ISSN: 10916466 Kashkooli ,S. B ; Masihi, M ; Pishvaei, M. R ; Sharif University of Technology
    Abstract
    Optimization of any production operation is a tool for increasing production rates and reducing production costs. Water flooding is one of the techniques that frequently be used to increase oil recovery after primary depletion. A methodology for optimizing the production by using the net present value of a heterogeneous reservoir under water flooding has been presented, which is based on controlling the bottomhole pressures of the production wells, using smart well technology. For this purpose, a numerical flow simulator is coupled with an optimization program. The technique was implemented on a synthetic two dimensional oil reservoir with heterogeneous permeability. This optimization... 

    Recovery improvement using water and gas injection scenarios

    , Article Petroleum Science and Technology ; Vol. 29, issue. 3 , Sep , 2009 , p. 290-300 ; ISSN: 10916466 Tafty, M. F ; Masihi, M ; Momeni, A ; Sharif University of Technology
    Abstract
    Water and miscible gas injection scenarios are considered in an Iranian oil reservoir for the purpose of recovery improvement. Firstly reservoir fluid modeling and modeling of a slim tube test were performed. Then, water alternating gas (WAG) injection was evaluated by optimizing the WAG half cycle and WAG ratio. Alternatively, hybrid WAG and separate injection of water and gas in the top and bottom of the reservoir were also investigated. The numerical simulation results showed that the optimum WAG, with half cycle of 1.5 years and WAG ratio of one, gave the highest recovery factor. Moreover, economic evaluation of these scenarios indicated that WAG had the highest net present value and was... 

    Recovery improvement using water and gas injection scenarios

    , Article Petroleum Science and Technology ; Volume 29, Issue 3 , 2011 , Pages 290-300 ; 10916466 (ISSN) Tafty, M. F ; Masihi, M ; Momeni, A ; Sharif University of Technology
    Abstract
    Water and miscible gas injection scenarios are considered in an Iranian oil reservoir for the purpose of recovery improvement. Firstly reservoir fluid modeling and modeling of a slim tube test were performed. Then, water alternating gas (WAG) injection was evaluated by optimizing the WAG half cycle and WAG ratio. Alternatively, hybrid WAG and separate injection of water and gas in the top and bottom of the reservoir were also investigated. The numerical simulation results showed that the optimum WAG, with half cycle of 1.5 years and WAG ratio of one, gave the highest recovery factor. Moreover, economic evaluation of these scenarios indicated that WAG had the highest net present value and was... 

    An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem

    , Article Advances in Engineering Software ; Volume 41, Issue 7-8 , July–August , 2010 , Pages 1023-1030 ; 09659978 (ISSN) Shahsavar, M ; Akhavan Niaki, S. T ; Najafi, A. A ; Sharif University of Technology
    2010
    Abstract
    In order to develop a more realistic resource-constrained project-scheduling model that is applicable to real-world projects, in this paper, the resource investment problem with discounted cash flows and generalized precedence relations is investigated under inflation factor such that a bonus-penalty structure at the deadline of the project is imposed to force the project not to be finished beyond the deadline. The goal is to find activity schedules and resource requirement levels that maximize the net present value of the project cash flows. The problem is first mathematically modeled. Then, a genetic algorithm (GA) is designed using a new three-stage process that utilizes design of... 

    Financially embedded facility location decisions on designing a supply chain structure: A case study

    , Article Systems Engineering ; Volume 21, Issue 6 , 2018 , Pages 520-533 ; 10981241 (ISSN) Nobil, A. H ; Jalali, S ; Akhavan Niaki, S. T ; Sharif University of Technology
    John Wiley and Sons Inc  2018
    Abstract
    The facility location problem and its related financial issues have a significant impact on the configuration of a supply chain structure (SCS). Although affording the setup cost of facilities requires a huge financial investment, a meticulous planning to recoup it has been neglected by an overwhelming majority of previous studies. To fill this gap, an economical investment plan of facilities is determined by striking a trade-off between the contribution of the stockholders’ capital and the loan arrangement. In the context of a multiperiod three-echelon SCS, the model also determines the optimum location of plants and the best supply and distribution patterns. The model maximizes the fill...