Loading...
Search for: power-generation-economics
0.006 seconds

    Developing new participation model of thermal generating units in flexible ramping market

    , Article IET Generation, Transmission and Distribution ; Volume 13, Issue 11 , 2019 , Pages 2216-2225 ; 17518687 (ISSN) Khoshjahan, M ; Moeini Aghtaie, M ; Fotuhi Firuzabad, M ; Sharif University of Technology
    Institution of Engineering and Technology  2019
    Abstract
    Uncertainty and variability in the supply sector of renewable-penetrated power systems is becoming a new challenge for secure operation of these systems which if not responded properly may cause large amounts of load and supply curtailments. To meet this challenge, some ISOs recently have employed a new product named Flexible Ramping Product (FRP) into their markets which enhances the capability of the system to overcome such uncertainties by reserving additional ramp rates. In this regard, a new framework for implementing FRP in real-time market is proposed here. The proposed framework provides a proper opportunity for participation of thermal generating units in procuring FRP requirements.... 

    Financial tools to manage dispatchable Distributed Generation economic risks

    , Article International Conference on Smart Energy Grid Engineering, SEGE 2015, 17 August 2015 through 19 August 2015 ; 2015 ; 9781467379328 (ISBN) Karimi, S. A ; Rajabi-Ghahnavieh, A ; Azad, H ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2015
    Abstract
    Distributed Generation (DG) has received increasing attention during the last decade. Advantage and constraints of DG application are well known to both DG owner and electric utility. Various technologies are available for DG units among them gas GenSet is, in particular, more attractive to the investors as the technology provides the control on DG generation. However, there are various financial risks associated with dispatchable DG units that prohibit wide private investment in such technologies. This paper examines the use of financial tools to manage dispatchable DG economic risks. A comprehensive framework has been proposed to consider various economic risks to DG owner. Suitable models... 

    Stochastic network constrained payment minimisation in electricity markets

    , Article IET Generation, Transmission and Distribution ; Volume 13, Issue 11 , 2019 , Pages 2268-2279 ; 17518687 (ISSN) Nouri, A ; Hosseini, S. H ; Keane, A ; Sharif University of Technology
    Institution of Engineering and Technology  2019
    Abstract
    This study presents a novel framework to incorporate the uncertainties associated with load fluctuations and components' availability in a day-ahead joint energy-reserve payment cost minimisation (PCM). The payments are calculated based on locational marginal prices (LMPs). Considering these uncertainties, appropriate definitions are not available for energy and reserve LMPs (RLMPs) that suit the probabilistic PCM formulation and reflect the market characteristics. A tri-level optimisation framework is proposed. The optimisation variables in the first-level optimisation include commitment status. In the second-level optimisation, the production schedule and allocated reserves are the... 

    Optimal energy management of a campus microgrid considering financial and economic analysis with demand response strategies

    , Article Energies ; Volume 14, Issue 24 , 2021 ; 19961073 (ISSN) Javed, H ; Muqeet, H. A ; Shehzad, M ; Jamil, M ; Khan, A. A ; Guerrero, J. M ; Sharif University of Technology
    MDPI  2021
    Abstract
    An energy management system (EMS) was proposed for a campus microgrid (μG) with the incorporation of renewable energy resources to reduce the operational expenses and costs. Many uncertainties have created problems for microgrids that limit the generation of photovoltaics, causing an upsurge in the energy market prices, where regulating the voltage or frequency is a challenging task among several microgrid systems, and in the present era, it is an extremely important research area. This type of difficulty may be mitigated in the distribution system by utilizing the optimal demand response (DR) planning strategy and a distributed generator (DG). The goal of this article was to present a...