Loading...
Search for: release-time
0.01 seconds

    News labeling as early as possible: Real or fake?

    , Article 11th IEEE/ACM International Conference on Advances in Social Networks Analysis and Mining, ASONAM 2019, 27 August 2019 through 30 August 2019 ; 2019 , Pages 536-537 ; 9781450368681 (ISBN) Ramezani, M ; Rafiei, M ; Omranpour, S ; Rabiee, H. R ; Sharif University of Technology
    Association for Computing Machinery, Inc  2019
    Abstract
    Differentiating between real and fake news propagation through online social networks is an important issue in many applications. The time gap between the news release time and detection of its label is a significant step towards broadcasting the real information and avoiding the fake. Therefore, one of the challenging tasks in this area is to identify fake and real news in early stages of propagation. However, there is a tradeoff between minimizing the time gap and maximizing accuracy. Despite recent efforts in detection of fake news, there has been no significant work that explicitly incorporates early detection in its model. The proposed method utilizes recurrent neural networks with a... 

    A two-criteria objective function flexible flowshop scheduling problem with machine eligibility constraint

    , Article International Journal of Advanced Manufacturing Technology ; Volume 64, Issue 5-8 , April , 2013 , Pages 1001-1015 ; 02683768 (ISSN) Tadayon, B ; Salmasi, N ; Sharif University of Technology
    2013
    Abstract
    This research deals with a flexible flowshop scheduling problem with the arrival and delivery of jobs in groups and processing them individually. Each group of jobs has a specific release time. Due to the special characteristics of each job, only a specific group of machines in each stage are eligible to process that job. All jobs in a group should be delivered at the same time after processing. The objectives of the problem are the minimization of the sum of the completion time of groups on one hand and the minimization of sum of the differences between the completion time of jobs and the delivery time of the group containing that job (waiting period) on the other hand. The problem can be...