    Designing a MapReduce performance model in distributed heterogeneous platforms based on benchmarking approach

    , Article Journal of Supercomputing ; Volume 76, Issue 9 , 2020 , Pages 7177-7203 Gandomi, A ; Movaghar, A ; Reshadi, M ; Khademzadeh, A ; Sharif University of Technology
    Springer  2020
    Abstract
    MapReduce framework is an effective method for big data parallel processing. Enhancing the performance of MapReduce clusters, along with reducing their job execution time, is a fundamental challenge to this approach. In fact, one is faced with two challenges here: how to maximize the execution overlap between jobs and how to create an optimum job scheduling. Accordingly, one of the most critical challenges to achieving these goals is developing a precise model to estimate the job execution time due to the large number and high volume of the submitted jobs, limited consumable resources, and the need for proper Hadoop configuration. This paper presents a model based on MapReduce phases for... 

    Application of scheduling models for utility management of process plants and its extension to DG networks

    , Article 2008 1st International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future, INFRA 2008, Rotterdam, 10 November 2008 through 12 November 2008 ; 2008 ; 9781424468874 (ISBN) Behdani, B ; Pishvaie, M. R ; Sharif University of Technology
    2008
    Abstract
    Scheduling models are one of the main parts of computer-aided process design research in recent years. One of the novel applications of scheduling models is their usage for in-site utility management of a process plant. It is very common for huge process plants to provide their utility by themselves; therefore, they shall make decision on utility supply and demand simultaneously. This approach can be extended to other similar systems such as distributed generation networks. In fact, it is possible to consider a DG unit as an autonomous system which is responsible for its energy (heat and power) supply and demand. Of course, for achieving its reliability and dispatchability goals, it would... 

    Robust energy management of residential energy hubs integrated with power-to-x technology

    , Article 2021 IEEE Texas Power and Energy Conference, TPEC 2021, 2 February 2021 through 5 February 2021 ; 2021 ; 9781728186122 (ISBN) Habibifar, R ; Khoshjahan, M ; Saravi, V. S ; Kalantar, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2021
    Abstract
    Growing interest in the intermittent renewable energy sources may jeopardize the flexibility of power systems. In order to improve the flexibility of modern power systems, the surplus electricity generated by renewable sources can be deployed into several carriers, such as natural gas and heating energy via power-to-gas (PtG) and power-to-heat (PtH) technologies. This paper proposes an optimal daily energy management model of residential energy hubs integrated with power-to-X technologies. The proposed energy hub is incorporated with PtG, PtH, combined heat and power (CHP) facilities, and thermal storage to meet the required electrical, gas, and heating demands. In order to capture the... 

    An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem

    , Article Advances in Engineering Software ; Volume 41, Issue 7-8 , July–August , 2010 , Pages 1023-1030 ; 09659978 (ISSN) Shahsavar, M ; Akhavan Niaki, S. T ; Najafi, A. A ; Sharif University of Technology
    2010
    Abstract
    In order to develop a more realistic resource-constrained project-scheduling model that is applicable to real-world projects, in this paper, the resource investment problem with discounted cash flows and generalized precedence relations is investigated under inflation factor such that a bonus-penalty structure at the deadline of the project is imposed to force the project not to be finished beyond the deadline. The goal is to find activity schedules and resource requirement levels that maximize the net present value of the project cash flows. The problem is first mathematically modeled. Then, a genetic algorithm (GA) is designed using a new three-stage process that utilizes design of...