Loading...
Search for: thermal-generating-units
0.007 seconds

    Enhancing electricity market flexibility by deploying ancillary services for flexible ramping product procurement

    , Article Electric Power Systems Research ; Volume 191 , 2021 ; 03787796 (ISSN) Khoshjahan, M ; Fotuhi Firuzabad, M ; Moeini Aghtaie, M ; Dehghanian, P ; Sharif University of Technology
    Elsevier Ltd  2021
    Abstract
    The escalated penetration of wind energy in the electric industry has by large contributed to an intensified uncertainty and variability of the net-load, i.e., the difference between stochastic demand and intermittent supply. In response, some Independent System Operators (ISOs) have recently introduced the Flexible Ramping Product (FRP) to heighten the grid flexibility via effective hosting of the uncertain renewables. This paper suggests a novel framework for optimal FRP provision in real-time markets (RTM) in which the shortage in the RTM ramp capacity is compensated by optimal deployment of day-ahead procured spinning reserve. In the envisioned mechanism, the ISO can deploy specific... 

    Developing new participation model of thermal generating units in flexible ramping market

    , Article IET Generation, Transmission and Distribution ; Volume 13, Issue 11 , 2019 , Pages 2216-2225 ; 17518687 (ISSN) Khoshjahan, M ; Moeini Aghtaie, M ; Fotuhi Firuzabad, M ; Sharif University of Technology
    Institution of Engineering and Technology  2019
    Abstract
    Uncertainty and variability in the supply sector of renewable-penetrated power systems is becoming a new challenge for secure operation of these systems which if not responded properly may cause large amounts of load and supply curtailments. To meet this challenge, some ISOs recently have employed a new product named Flexible Ramping Product (FRP) into their markets which enhances the capability of the system to overcome such uncertainties by reserving additional ramp rates. In this regard, a new framework for implementing FRP in real-time market is proposed here. The proposed framework provides a proper opportunity for participation of thermal generating units in procuring FRP requirements.... 

    Optimized midterm preventive maintenance outage scheduling of thermal generating units

    , Article IEEE Transactions on Power Systems ; Vol. 27, issue. 3 , 2012 , p. 1354-1365 ; ISSN: 08858950 Abiri-Jahromi, A ; Fotuhi-Firuzabad, M ; Parvania, M ; Sharif University of Technology
    Abstract
    This paper addresses the midterm preventive maintenance outage scheduling problem of thermal generating units which is becoming increasingly important due to the aging of power generation fleet. In this context, a novel midterm preventive maintenance outage scheduler is proposed based on decision tree and mixed integer linear formation which explicitly considers the thermal units aging momentum in terms of failure rate. This allows the system operators to determine the thermal units' maintenance outage window based on the cost/benefit analysis of preventive maintenance tasks while optimizing the time interval between consecutive maintenance tasks. Additionally, the division of the year-long... 

    Optimized midterm preventive maintenance outage scheduling of thermal generating units

    , Article IEEE Transactions on Power Systems ; Volume 27, Issue 3 , 2012 , Pages 1354-1365 ; 08858950 (ISSN) Abiri Jahromi, A ; Fotuhi Firuzabad, M ; Parvania, M ; Sharif University of Technology
    2012
    Abstract
    This paper addresses the midterm preventive maintenance outage scheduling problem of thermal generating units which is becoming increasingly important due to the aging of power generation fleet. In this context, a novel midterm preventive maintenance outage scheduler is proposed based on decision tree and mixed integer linear formation which explicitly considers the thermal units aging momentum in terms of failure rate. This allows the system operators to determine the thermal units' maintenance outage window based on the cost/benefit analysis of preventive maintenance tasks while optimizing the time interval between consecutive maintenance tasks. Additionally, the division of the year-long... 

    Optimal transactive market operations with distribution system operators

    , Article IEEE Transactions on Smart Grid ; 2017 ; 19493053 (ISSN) Kabiri Renani, Y ; Ehsan, M ; Shahidehpour, M ; Sharif University of Technology
    Abstract
    Distribution system operator (DSO) has traditionally been responsible for the reliable operation of power distribution systems. The advent of distributed energy resources (DERs) and microgrids in distribution networks has required a new platform for DSOs. The new DSO, which is for the most part an independent agent, is responsible for aggregating a widely dispersed DERs (which include small thermal generation units, energy storage, and demand response) and flexible loads in electricity markets. DSO coordinates and balances the transactive dispatch of supply and demand at the distribution level and links wholesale and retail electricity markets. In this paper, a framework for the day-ahead... 

    Optimal transactive market operations with distribution system operators

    , Article IEEE Transactions on Smart Grid ; Volume 9, Issue 6 , 2018 , Pages 6692-6701 ; 19493053 (ISSN) Kabiri Renani, Y ; Ehsan, M ; Shahidehpour, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2018
    Abstract
    Distribution system operator (DSO) has traditionally been responsible for the reliable operation of power distribution systems. The advent of distributed energy resources (DERs) and microgrids in distribution networks has required a new platform for DSOs. The new DSO, which is for the most part an independent agent, is responsible for aggregating a widely dispersed DERs (which include small thermal generation units, energy storage, and demand response) and flexible loads in electricity markets. DSO coordinates and balances the transactive dispatch of supply and demand at the distribution level and links wholesale and retail electricity markets. In this paper, a framework for the day-ahead... 

    Electricity generation scheduling with large-scale wind farms using particle swarm optimization

    , Article Electric Power Systems Research ; Volume 79, Issue 5 , 2009 , Pages 826-836 ; 03787796 (ISSN) Siahkali, H ; Vakilian, M ; Sharif University of Technology
    2009
    Abstract
    Large-scale integration of wind power in the electricity system presents some planning and operational difficulties, which are mainly due to the intermittent and difficult nature of wind prediction process. Therefore it is considered as an unreliable energy source. This paper presents a new approach for solving the generation scheduling (GS) problem. It will consider the reserve requirement, load balance and wind power availability constraints. The particle swarm optimization (PSO) method is suggested to deal with the equality and inequality constraints in the GS problem. The proposed PSO is applied to a 12-unit test system (including 10 conventional thermal generating units and 2 wind...