    Transmission congestion management using distributed generation considering load uncertainty

    , Article Asia-Pacific Power and Energy Engineering Conference, APPEEC, 28 March 2010 through 31 March 2010 ; March , 2010 ; 21574839 (ISSN) ; 9781424448135 (ISBN) Afkousi Paqaleh, M ; Noory, A. R ; Abbaspour T. F., A ; Rashidinejad, M ; Sharif University of Technology
    2010
    Abstract
    This Paper presents a model for optimal locating and sizing of Distributed Generation (DG) for congestion management in deregulated electricity market. For reducing the solution space a priority list of candidate buses is formed and then optimal placement and sizing of DG in potential buses is discussed. In order to incorporate stochastic nature of power system in this study, Monte-Carlo method is used to simulate the effect of uncertainty of loads and system on the optimal location and size of the DGs in the network. The proposed method is applied to IEEE Reliability Test System (RTS). The impacts of load uncertainty on optimum DG size and location are studied  

    Data-driven joint TEP-BESS co-planning scheme to relieve transmission lines congestion: A min-max regret method

    , Article Sustainable Energy Technologies and Assessments ; Volume 53 , 2022 ; 22131388 (ISSN) Mazaheri, H ; Moeini Aghtaie, M ; Sharif University of Technology
    Elsevier Ltd  2022
    Abstract
    Transmission lines congestion has recently been a vital challenge in power systems operation due to the intermittent outputs of renewable energy sources (RES). Therefore, an efficient transmission congestion management (TCM) method should be defined to deal with the congestion issue. This paper aims to propose a simultaneous linearized two-stage TEP-BESS co-planning optimization model to relieve transmission lines congestion. In doing so, a novel TCM structure is suggested in a pool-based deregulated data-driven optimal power flows (D-OPF) by the computationally effective min-max regret method to consider future scenarios of generating units and demanded loads. To improve the efficiency of...