Loading...
Search for: well-integrity-management-system
0.006 seconds

    Assessment of Well Tubing with Ovality in Cross Section by Numerical Modeling from the Perspective of Integrity Management

    , M.Sc. Thesis Sharif University of Technology Tarami, Behrad (Author) ; Raie, Mohammad (Supervisor)
    Abstract
    This study investigates the ovality on the burst pressure of the pipe inside the well. In the last decade, the use of natural offshore oil and gas resources has increased, and as a result, the importance of well integration as a major part of offshore platforms is clear. At the same time, accidents at oil and gas wells have economic and environmental consequences that underscore the importance of ensuring safe operation. Integrity management of fluid pressure wells has been developed to ensure the safe operation of wells. The functional area of integrity management begins with planning, then inspects and then evaluates, and eventually leads to corrective action, and this loop is repeated on... 

    Performance Analysis and Design of Spectral Noise Logging Tool

    , M.Sc. Thesis Sharif University of Technology Vahdanizadeh, Farhad (Author) ; Movahedian, Hamid (Supervisor)
    Abstract
    Today, one of the most important concerns of oil and gas wells is to increase the efficiency of wells. To increase efficiency, well integrity must be monitored. One of the factors that destroy the integrity of the well is the creation of hydraulic fractures inside the oil and gas wells, which is one of the main factors that reduce the efficiency of the well. Hydraulic fractures cause water, gas and other materials to leak into the well or oil and gas to leak out of the fracture, which in both cases reduces the efficiency of the well. One of the most important technologies for identifying hydraulic fractures is the use of SNL tools from oil and gas wells. The oil and gas well SNL tool listens... 

    Cement Quality Investigation and Determination Using Automatic Interpretation of Cement Quality Logs

    , M.Sc. Thesis Sharif University of Technology Keikha, Ali (Author) ; Jamshidi, Saeed (Supervisor)
    Abstract
    The main responsibility of a primary cement job is to provide hydraulic isolation between various zones. Cement-sheath evaluation is concerned with the question of whether zonal isolation exists. Cement Evaluation Logs are used to evaluate the quality of cement sheath behind the casing or liner after cement job. these logs are a part of well integrity logs. Cement Evaluation Log results are complex and can be misunderstood, and it can lead to bad decisions that could have severe consequences. Cement evaluation logs must therefore be interpreted by experienced professionals. To help these interpreters, we propose a system for automatically interpreting cement evaluation logs, which they can...