Optimizing Long-Term Coordinated Operation of Hydro-Thermal Power Systems using Noisy GA & NSGA-II

Abdolhoseini Roozbahani, Mohammad Ali | 2009

1152 Viewed
  1. Type of Document: M.Sc. Thesis
  2. Language: Farsi
  3. Document No: 39332 (09)
  4. University: Sharif University of Technology
  5. Department: Civil Engineering
  6. Advisor(s): Ardakanian, Reza
  7. Abstract:
  8. Long-term coordinated operation of hydro-thermal power systems has important rule in energy generation planning and management. Therefore a new approach for optimization and long-term planning of hydro-thermal power system is developed. In this research main parameters of the system like inflows and energy are considered as uncertain and so scenario optimization technique is applied. The advantage of this research compare to similar approaches is about applying two objective functions which minimize cost of energy generation and flood control.The Noisy GA and NSGA-II algorithms are used to run the model solving the khouzistan hydro-thermal power system in Iran.The results of this model is compared with the HTCOM-III method for the same case study
  9. Keywords:
  10. Hydro-Thermal Power Plant ; Nonlinear Programming ; Genetic Algorithm ; Optimization ; Noise Genetic Algorithm