Evaluation of the Behaviorof Earth and Rockfill Dams during Construction and First Impounding using Instrumentation data and Numerical Modeling (Case Study: Dam Gavoshan), M.Sc. Thesis Sharif University of Technology ; Haeri, Mohsen (Supervisor)
Abstract
Monitoring is of particular importance after impounding and during dam operation. In all large dams, by installation of the required instruments the pore pressure, soil mass pressure and displacement during construction, first impounding and operation are measured, then the performance of dam will be analyzed and evaluated. The aim of this study is to evaluate the performance of the "Gavoshan" dam, which has an important role on agriculture development and drinking water supply at west part of Country. To reach this, the values resulting from instruments have been implemented by FLAC software, using "Back Analysis" method. However, this assessment is complete when "back analysis" method is...
Cataloging briefEvaluation of the Behaviorof Earth and Rockfill Dams during Construction and First Impounding using Instrumentation data and Numerical Modeling (Case Study: Dam Gavoshan), M.Sc. Thesis Sharif University of Technology ; Haeri, Mohsen (Supervisor)
Abstract
Monitoring is of particular importance after impounding and during dam operation. In all large dams, by installation of the required instruments the pore pressure, soil mass pressure and displacement during construction, first impounding and operation are measured, then the performance of dam will be analyzed and evaluated. The aim of this study is to evaluate the performance of the "Gavoshan" dam, which has an important role on agriculture development and drinking water supply at west part of Country. To reach this, the values resulting from instruments have been implemented by FLAC software, using "Back Analysis" method. However, this assessment is complete when "back analysis" method is...
Find in contentBookmark |
|