Maintenance Planning at Generation by GENCO & ISO in Restructured Power System, M.Sc. Thesis Sharif University of Technology ; Ehsan , Mehdi (Supervisor)
Abstract
In a centralized power system, the system operator, derives a maintenance scheduling plan that maximizing reliability of system and minimizing operating cost. But in a restructured power system the goals of GENCOs and independent system operator (ISO) are separate and each of them optimize its own goal. The goal of each GENCO is to maximize its annual benefits and the goal of ISO is to maximize the reliability of system throughout the year. Therefore there are two objective functions for finding an optimum maintenance schedule in restructured power system. This thesis proposes a new method for maintenance scheduling of generation units in a restructured power system. Firstly each GENCO...
Cataloging briefMaintenance Planning at Generation by GENCO & ISO in Restructured Power System, M.Sc. Thesis Sharif University of Technology ; Ehsan , Mehdi (Supervisor)
Abstract
In a centralized power system, the system operator, derives a maintenance scheduling plan that maximizing reliability of system and minimizing operating cost. But in a restructured power system the goals of GENCOs and independent system operator (ISO) are separate and each of them optimize its own goal. The goal of each GENCO is to maximize its annual benefits and the goal of ISO is to maximize the reliability of system throughout the year. Therefore there are two objective functions for finding an optimum maintenance schedule in restructured power system. This thesis proposes a new method for maintenance scheduling of generation units in a restructured power system. Firstly each GENCO...
Find in contentBookmark |
|