Asphaltene Onset Prediction Using CEOS, M.Sc. Thesis Sharif University of Technology ; Ghotbi, Cyrous (Supervisor) ; Jafari Behbahani, Taraneh (Supervisor)
Abstract
One of the main problems associated with the oil production is asphaltene precipitate in the reservoirs. In order to plan for the EOR methods, production scenario, and selection of completion technology, it is necessary to study the initiation of asphaltene precipitation called onset. Since the experimental methods is not only is so expensive and time consuming, the required materials are not available. Consequently, modeling approaches as new methods are proper substitutes for laboratory procedure. These methods need less costs and time and higher accuracy compared to the experimental investigations which are the advantages of these methods. Computational operations for onset determination...
Cataloging briefAsphaltene Onset Prediction Using CEOS, M.Sc. Thesis Sharif University of Technology ; Ghotbi, Cyrous (Supervisor) ; Jafari Behbahani, Taraneh (Supervisor)
Abstract
One of the main problems associated with the oil production is asphaltene precipitate in the reservoirs. In order to plan for the EOR methods, production scenario, and selection of completion technology, it is necessary to study the initiation of asphaltene precipitation called onset. Since the experimental methods is not only is so expensive and time consuming, the required materials are not available. Consequently, modeling approaches as new methods are proper substitutes for laboratory procedure. These methods need less costs and time and higher accuracy compared to the experimental investigations which are the advantages of these methods. Computational operations for onset determination...
Find in contentBookmark |
|