This study, with integrated approach to the POM problem, has developed a linear mutual MILP model with the hybrid MTS / MTO operational approach on the OAS problem in industry 4.0 environment for the Shahin Plastic Manufacturing Company. This enabled an integrated PM with the production in the scheduling model. The model objective function has minimized costs and maximized the company profits. It also maximized customer satisfaction by minimizing the tardiness and earliness time in producing orders. To implement this model in the factory decision-making system, measures and modifications have been made to the MIS structure of the corporate departments. Measures include the creation of cloud...
This study, with integrated approach to the POM problem, has developed a linear mutual MILP model with the hybrid MTS / MTO operational approach on the OAS problem in industry 4.0 environment for the Shahin Plastic Manufacturing Company. This enabled an integrated PM with the production in the scheduling model. The model objective function has minimized costs and maximized the company profits. It also maximized customer satisfaction by minimizing the tardiness and earliness time in producing orders. To implement this model in the factory decision-making system, measures and modifications have been made to the MIS structure of the corporate departments. Measures include the creation of cloud...