Loading...

Economic production quantity with accumulated rework

Haji, R ; Sharif University of Technology | 2006

353 Viewed
  1. Type of Document: Article
  2. Publisher: 2006
  3. Abstract:
  4. This paper deals with the issue of economic batch quantity (EBQ) in a single machine system in which defective items are produced in each cycle of production. The defective items produced in the first N cycles are accumulated at the end of the Nth cycle and are all reworked in a separate cycle called the rework cycle which has the same length as the other cycles and begins just at the end of the Nth cycle. At the end of the rework cycle the whole process will start all over again. For this system, assuming no shortages are permitted we obtain the economic batch quantity which minimizes the total cost
  5. Keywords:
  6. Defective items ; Economic batch quantity ; Economic production quantity ; Imperfect production ; N cycles ; Rework ; Single- machines ; Whole process ; Engineering ; Industry ; Industrial engineering
  7. Source: 36th International Conference on Computers and Industrial Engineering, ICC and IE 2006, Taipei, 20 June 2006 through 23 June 2006 ; 2006 , Pages 4196-4203
  8. URL: https://www.researchgate.net/publication/290800126_Economic_production_quantity_with_accumulated_rework