Loading...

Economic batch quantity for a production system with rework an D varying scrap

Haji, R ; Sharif University of Technology | 2006

260 Viewed
  1. Type of Document: Article
  2. Publisher: 2006
  3. Abstract:
  4. This paper considers an imperfect production system in which defective items are produced in. each cycle of production. We assume that the defectives produced within each cycle will be reworked immediately after each production run is completed. We also assume some scrap is produced and detected during the rework period. Further, we assume that the number of scrapped items produced during the rework period is a random variable. For this system, using some theorem from the renewal theory, the expected total cost function per unit time is derived and the optimal batch quantity is obtained
  5. Keywords:
  6. Batch data processing ; Cost functions ; Industrial economics ; Optimal control systems ; Imperfect production ; Renewal theory ; Production engineering
  7. Source: 2006 IIE Annual Conference and Exposition, Orlando, FL, 20 May 2006 through 24 May 2006 ; 2006
  8. URL: https://www.proquest.com/docview/192455130