    Reliability evaluation of an HVDC transmission system tapped by a VSC station

    , Article IEEE Transactions on Power Delivery ; Vol. 25, issue. 3 , 2010 , p. 1962-1970 ; ISSN: 8858977 Zadkhast, S ; Fotuhi-Firuzabad, M ; Aminifar, F ; Billinton, R ; Faried, S. O ; Edris, A. -A ; Sharif University of Technology
    Abstract
    Reliability evaluation of multiterminal HVDC systems has received very little attention in the past. This paper presents reliability modeling and analysis of an HVDC transmission system incorporating a voltage-sourced converter (VSC) tapping station. The use of VSC tapping stations enables the supply of power along the route to areas with comparatively little consumption. In this paper, a comprehensive detailed reliability model is developed and then converted to a manageable and computationally efficient model. Using this equivalent reliability model, various reliability indices are calculated at the load point of the system and the impacts of the VSC tapping station on these indices are... 

    Reliability evaluation of an HVDC transmission system tapped by a VSC station

    , Article IEEE Transactions on Power Delivery ; Volume 25, Issue 3 , April , 2010 , Pages 1962-1970 ; 08858977 (ISSN) Zadkhast, S ; Fotuhi Firuzabad, M ; Aminifar, F ; Billinton, R ; Faried, S. O ; Edris, A. A ; Sharif University of Technology
    2010
    Abstract
    Reliability evaluation of multiterminal HVDC systems has received very little attention in the past. This paper presents reliability modeling and analysis of an HVDC transmission system incorporating a voltage-sourced converter (VSC) tapping station. The use of VSC tapping stations enables the supply of power along the route to areas with comparatively little consumption. In this paper, a comprehensive detailed reliability model is developed and then converted to a manageable and computationally efficient model. Using this equivalent reliability model, various reliability indices are calculated at the load point of the system and the impacts of the VSC tapping station on these indices are... 

    Inverse reliability evaluation in power distribution systems

    , Article IEEE Transactions on Power Systems ; Volume 35, Issue 1 , 2020 , Pages 818-820 Sharifinia, S ; Rastegar, M ; Allahbakhshi, M ; Fotuhi Firuzabad, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2020
    Abstract
    In power distribution systems, sometimes, system reliability indices are available, where some components' reliability parameters are unknown. This letter presents the inverse reliability evaluation (IRE) problem in radial distribution systems to find unknown components' parameters from the known system reliability indices. To this end, a nonlinear system of equations is presented and solved. The solutions are analyzed in the RBTS bus 2 to verify the applicability of the proposed approach and to show the importance of the IRE problem. © 1969-2012 IEEE  

    A reliability model of large wind farms for power system adequacy studies

    , Article IEEE Transactions on Energy Conversion ; Volume 24, Issue 3 , 2009 , Pages 792-801 ; 08858969 (ISSN) Salehi Dobakhshari, A ; Fotuhi Firuzabad, M ; Sharif University of Technology
    2009
    Abstract
    In this paper, an analytical approach for the reliability modeling of large wind farms is presented. A systematic method based on frequency and duration approach is utilized to model a wind farm like a multistate conventional unit, where the probability, frequency of occurrence, and departure rate of each state can be obtained using the regional wind regime of wind farm and wind turbine characteristics. The proposed method is capable of finding both annual frequency and average time of load curtailment analytically in the presence of wind power. A wind farm in the northern region of Iran with the wind speed registration of one year is studied in this paper. To accommodate time-varying... 

    Post Optimal Analysis application on the reliability evaluation of the Iran power grid

    , Article 2012 11th International Conference on Environment and Electrical Engineering, EEEIC 2012 - Conference Proceedings ; 2012 , p. 873-878 ; ISBN: 9781460000000 Safdarian, A ; Fotuhi-Firuzabad, M ; Sharif University of Technology
    Abstract
    Access to a computational tractable method for representing the system more realistically has always been an important issue in power system reliability assessment. The Post Optimal Analysis (POA), as a well recognized technique to attack a set of similar optimization problems, has been successfully used to assess the reliability of composite systems. This method exploits the similarity of the system states to speed up the contingency evaluation procedure without sacrificing the accuracy of the results. In this paper, the performance and practical feasibility of the POA technique for power system reliability evaluation is tested using the Iran power grid. The POA based approach is applicable... 

    Post Optimal Analysis application on the reliability evaluation of the Iran power grid

    , Article EEEIC 2012, Venice, 18 May 2012 through 25 May 2012 ference on Environment and Electrical Engineering, EE ; 2012 , Pages 873-878 ; 9781457718281 (ISBN) Safdarian, A ; Fotuhi-Firuzabad, M ; Sharif University of Technology
    IEEE  2012
    Abstract
    Access to a computational tractable method for representing the system more realistically has always been an important issue in power system reliability assessment. The Post Optimal Analysis (POA), as a well recognized technique to attack a set of similar optimization problems, has been successfully used to assess the reliability of composite systems. This method exploits the similarity of the system states to speed up the contingency evaluation procedure without sacrificing the accuracy of the results. In this paper, the performance and practical feasibility of the POA technique for power system reliability evaluation is tested using the Iran power grid. The POA based approach is applicable... 

    Hybrid AC/DC microgrids flexible reliability index by using the axiomatic design concept

    , Article IET Generation, Transmission and Distribution ; Volume 14, Issue 23 , 2020 , Pages 5456-5462 Sabouhi, H ; Doroudi, A ; Fotuhi Firuzabad, M ; Bashiri, M ; Sharif University of Technology
    Institution of Engineering and Technology  2020
    Abstract
    With the capacity increase of large-scale DC renewable energy and DC loads, the reliability issues of hybrid AC/DC networks become increasingly prominent. On the other hand, a modern distribution network should also deliver power to individual customers based on their priority levels and the traditional reliability indices are not suitable for modern networks. Flexible reliability (FR) is a new concept that considers the loads' importance in the reliability evaluation of distribution grids. In this study, a novel comprehensive FR index is introduced for hybrid AC/DC networks. To determine the proposed index, power networks are modelled as a topological combination of edges and nodes. An... 

    A probabilistic approach for remote terminal unit placement in power distribution systems

    , Article INTELEC, International Telecommunications Energy Conference (Proceedings) ; 2011 ; 02750473 (ISSN) ; 9781457712494 (ISBN) Razi Kazemi, A. A ; Dehghanian, P ; Karami, G ; Sharif University of Technology
    Abstract
    This paper investigates a reliability-centered approach for the placement procedure of remote terminal units (RTUs) in power distribution systems. Entire attempt is contributed to incorporate the practical aspects interrelated with the problem, e.g. the accessibility to the candidate substations, the load point criticality, as well as the load probabilistic behavior and consequently the inevitable variation in the electricity price. The placement process is done through an optimization problem wherein the common reliability indices, as the decisive factors in the placement process, are going to be minimized. The approach is successfully applied to a real power distribution feeder of Iran's... 

    Reliability-constrained unit commitment using stochastic mixed-integer programming

    , Article 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2010 ; 2010 , p. 200-205 ; ISBN: 9781420000000 Parvania, M ; Fotuhi-Firuzabad, M ; Aminifar, F ; Abiri-Jahromi, A ; Sharif University of Technology
    Abstract
    This paper proposes a stochastic mixed-integer programming (SMIP) model for the reliability-constrained unit commitment (RCUC) problem. The major objective of the paper is to examine both features of accuracy and efficiency of the proposed SMIP model of RCUC. The spinning reserve of generating units is considered as the only available reserve provision resource; however, the proposed formulation can be readily extended to comprise the other kind of reserve facilities. Expected load not served (ELNS) and loss of load probability (LOLP) are accommodated as the reliability constraints. Binding either or both reliability indices ensures the security of operation incorporating the stochastic... 

    Reliability-constrained unit commitment using stochastic mixed-integer programming

    , Article 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2010, 14 June 2010 through 17 June 2010 ; June , 2010 , Pages 200-205 ; 9781424457236 (ISBN) Parvania, M ; Fotuhi Firuzabad, M ; Aminifar, F ; Abiri Jahromi, A ; Sharif University of Technology
    2010
    Abstract
    This paper proposes a stochastic mixed-integer programming (SMIP) model for the reliability-constrained unit commitment (RCUC) problem. The major objective of the paper is to examine both features of accuracy and efficiency of the proposed SMIP model of RCUC. The spinning reserve of generating units is considered as the only available reserve provision resource; however, the proposed formulation can be readily extended to comprise the other kind of reserve facilities. Expected load not served (ELNS) and loss of load probability (LOLP) are accommodated as the reliability constraints. Binding either or both reliability indices ensures the security of operation incorporating the stochastic... 

    A study of the reliability of various types of the electric vehicles

    , Article 2012 IEEE International Electric Vehicle Conference, IEVC 2012 ; 2012 ; 9781467315623 (ISBN) Negarestani, S ; Ghahnavieh, A. R ; Mobarakeh, A. S
    2012
    Abstract
    The reliability Studies are done in order to determine the probability of functioning or availability of different engineering systems. These studies can also provide a basis for comparing different structures of a system and can be used as a tool to improve the system design. Also, reliability is an important consideration in the planning, design and operation of transit system. Since the issue of the reliability of electric vehicles has not been sufficiently and seriously evaluated yet, so in this paper, the reliability of the various types of these kinds of vehicles will be discussed and then the reliability indices of them will be compared with each other and with the conventional cars  

    Integration of clustering analysis and reward/penalty mechanisms for regulating service reliability in distribution systems

    , Article IET Generation, Transmission and Distribution ; Vol. 5, issue. 11 , 2011 , p. 1192-1200 ; ISSN: 17518687 Mohammadnezhad-Shourkaei, H ; Fotuhi-Firuzabad, M ; Billinton, R ; Sharif University of Technology
    Abstract
    This study proposes an approach for improving service reliability in the distribution network based on establishing competition among electric distribution utilities. The idea behind this approach is to categorise the utilities and compare the performance of utilities located in one cluster with the other members of the same cluster. The reward/penalty mechanism (RPM) as a quality regulating instrument is designed for each cluster and used to penalise the utilities with a performance worse than the benchmark and to reward them for providing a performance better than the benchmark. Based on the RPM, utilities located in one cluster compete to make more profit by serving customers in better... 

    Impact of penalty-reward mechanism on the performance of electric distribution systems and regulator budget

    , Article IET Generation, Transmission and Distribution ; Vol. 4, issue. 7 , 2010 , p. 770-779 ; ISSN: 17518687 Mohammadnezhad-Shourkaei, H ; Fotuhi-Firuzabad, M ; Sharif University of Technology
    Abstract
    As a part of the ongoing debate about competition in the electricity industry, regulators are increasingly considering performance-based regulation (PBR) as an alternative to improve the service quality. The fundamental principle behind PBR is that good performance should lead to higher profits, and poor performance should result in lower profits. A penalty-reward structure (PRS) in a PBR mechanism can enhance utility performance to align utility interests with customer's interests. During the implementation of PBR, regulators should spend or receive money to reward good performed utilities or penalised poor performed utilities, respectively. A technique is proposed, in this study, to not... 

    Integration of clustering analysis and reward/penalty mechanisms for regulating service reliability in distribution systems

    , Article IET Generation, Transmission and Distribution ; Volume 5, Issue 11 , 2011 , Pages 1192-1200 ; 17518687 (ISSN) Mohammadnezhad Shourkaei, H ; Fotuhi Firuzabad, M ; Billinton, R ; Sharif University of Technology
    Abstract
    This study proposes an approach for improving service reliability in the distribution network based on establishing competition among electric distribution utilities. The idea behind this approach is to categorise the utilities and compare the performance of utilities located in one cluster with the other members of the same cluster. The reward/penalty mechanism (RPM) as a quality regulating instrument is designed for each cluster and used to penalise the utilities with a performance worse than the benchmark and to reward them for providing a performance better than the benchmark. Based on the RPM, utilities located in one cluster compete to make more profit by serving customers in better... 

    Impact of penalty-reward mechanism on the performance of electric distribution systems and regulator budget

    , Article IET Generation, Transmission and Distribution ; Volume 4, Issue 7 , 2010 , Pages 770-779 ; 17518687 (ISSN) Mohammadnezhad Shourkaei, H ; Fotuhi Firuzabad, M ; Sharif University of Technology
    2010
    Abstract
    As a part of the ongoing debate about competition in the electricity industry, regulators are increasingly considering performance-based regulation (PBR) as an alternative to improve the service quality. The fundamental principle behind PBR is that good performance should lead to higher profits, and poor performance should result in lower profits. A penalty-reward structure (PRS) in a PBR mechanism can enhance utility performance to align utility interests with customer's interests. During the implementation of PBR, regulators should spend or receive money to reward good performed utilities or penalised poor performed utilities, respectively. A technique is proposed, in this study, to not... 

    Impacts of service quality regulation on distribution automation investment

    , Article 2011 10th International Conference on Environment and Electrical Engineering, EEEIC.EU 2011 - Conference Proceedings ; 2011 ; ISBN: 9781420000000 Modarresi, M. S ; Fotuhi-Firuzabad, M ; Mohammadnezhad-Shourkaei, H ; Sharif University of Technology
    Abstract
    This paper investigates the effects of service quality regulation on investing in distribution automation. Among different regulatory instruments for quality regulation, the Reward-Penalty Scheme (RPS) has been selected to evaluate the effect of monetary incentive on behavior of Electric Distribution Utility (EDU) for service reliability. By implementing different automation strategies, the value of enhancing reliability indices and consequently the value of rewards and penalties are calculated for each strategy. For achieving to more realistic outcome, ten years horizon is considered. Furthermore, in the calculation of reliability indices, the time varying failure rate of components is... 

    Impacts of service quality regulation on distribution automation investment

    , Article 2010 IEEE International Energy Conference and Exhibition, EnergyCon 2010 ; 2010 , p. 373-378 ; ISBN: 9781420000000 Modarresi, M. S ; Fotuhi-Firuzabad, M ; Mohammadnezhad-Shourkaei, H ; Sharif University of Technology
    Abstract
    This paper investigates the effects of service quality regulation on investing in distribution automation. Among different regulatory instruments for quality regulation, the Reward-Penalty Scheme (RPS) has been selected to evaluate the effect of monetary incentive on behavior of Electric Distribution Utility (EDU) for service reliability. By implementing different automation strategies, the value of enhancing reliability indices and consequently the value of rewards and penalties are calculated for each strategy. For achieving to more realistic outcome, ten years horizon is considered. Furthermore, in the calculation of reliability indices, the time varying failure rate of components is... 

    Impacts of service quality regulation on distribution automation investment

    , Article 2011 10th International Conference on Environment and Electrical Engineering, EEEIC.EU 2011 - Conference Proceedings, 8 May 2011 through 11 May 2011 ; May , 2011 , Page(s): 1 - 4 ; 9781424487820 (ISBN) Modarresi, M. S ; Fotuhi Firuzabad, M ; Mohammadnezhad Shourkaei, H ; Sharif University of Technology
    2011
    Abstract
    This paper investigates the effects of service quality regulation on investing in distribution automation. Among different regulatory instruments for quality regulation, the Reward-Penalty Scheme (RPS) has been selected to evaluate the effect of monetary incentive on behavior of Electric Distribution Utility (EDU) for service reliability. By implementing different automation strategies, the value of enhancing reliability indices and consequently the value of rewards and penalties are calculated for each strategy. For achieving to more realistic outcome, ten years horizon is considered. Furthermore, in the calculation of reliability indices, the time varying failure rate of components is... 

    Impacts of service quality regulation on distribution automation investment

    , Article 2010 IEEE International Energy Conference and Exhibition, EnergyCon 2010, 18 December 2010 through 22 December 2010 ; December , 2010 , Pages 373-378 ; 9781424493807 (ISBN) Modarresi, M. S ; Fotuhi Firuzabad, M ; Mohammadnezhad Shourkaei, H ; Sharif University of Technology
    2010
    Abstract
    This paper investigates the effects of service quality regulation on investing in distribution automation. Among different regulatory instruments for quality regulation, the Reward-Penalty Scheme (RPS) has been selected to evaluate the effect of monetary incentive on behavior of Electric Distribution Utility (EDU) for service reliability. By implementing different automation strategies, the value of enhancing reliability indices and consequently the value of rewards and penalties are calculated for each strategy. For achieving to more realistic outcome, ten years horizon is considered. Furthermore, in the calculation of reliability indices, the time varying failure rate of components is... 

    Reliability worth assessment of an automatic loop restoration scheme for urban distribution networks

    , Article IEEE PES Innovative Smart Grid Technologies Conference Europe, ISGT Europe ; 2010 Kazemi, S ; Lehtonen, M ; Fotuhi-Firuzabad, M ; Sharif University of Technology
    Abstract
    Distribution automation (DA) application for fault management in the electricity distribution networks is one of the main potential remedial actions to reduce customers' outage times and hence improve service reliability. As a result, various automation schemes have been developed and introduced in different countries and by different venders. The impacts of implementing a specific automation scheme on reliability indices of a given distribution system can be different from other available automation schemes. For this reason, when comparing the available automation schemes with each other or with the other reliability improvement measures, it is necessary to perform a course of reliability...