    Frequency Control During Power System Restoration

    , M.Sc. Thesis Sharif University of Technology Yari, Vahid (Author) ; Ranjbar, Ali Mohammad (Supervisor)
    Abstract
    The problem of restoring power systems after a complete or partial blackout is as old as the power industry itself. In recent years, due to economic competition and deregulation, power systems are operated closer and closer to their limits. At the same time, power systems have increased in size and complexity. Both factors increase the risk of major power outages. After a blackout, power needs to be restored as quickly and reliably as possible, and consequently, detailed restoration plants are necessary. This thesis concentrates on the initial stages of restoration where load pickup and frequency control problem is identified. The best sequence of load pickup for power plants during power... 

    Power System Restoration Using Wide Area Measurement System (WAMS)

    , Ph.D. Dissertation Sharif University of Technology Nourizadeh, Saber (Author) ; Ranjbar, Ali Mohammad (Supervisor)
    Abstract
    The introduction of Wide Area Measurement Systems (WAMS) made it possible to monitor the stability online. This thesis presents a method for the optimal restoration planning based on Wide Area Measurement System (WAMS). In fact, the practical use of WAMS at the early stages of restoration provides precise determination of generators loading steps. Moreover, unification of phase angle references at different islands and presentation of tie line energizing priority list are significant benefits of WAMS at the last stages of restoration. The presented method uses observability analysis and Power Transfer Distribution Factor (PTDF) concept. The PTDF concept is applied to decrease the... 

    A Sectionalizing Method in Power System Restoration Based on Wide Area Measurement Systems

    , M.Sc. Thesis Sharif University of Technology Nezam Sarmadi, Arash (Author) ; Ranjbar, Ali Mohammad (Supervisor)
    Abstract
    Power system restoration is the procedure of restoring generators, transmission lines and loads in a minimum time without damaging power system elements. There are different strategies to restore a power system after a blackout. The one that we will introduce here is the build-upward or parallel restoration strategy. In this method power system will be divided into some independent islands firstly and then the restoration process will begin in each island separately and at the same time. The islands then will be connected together to have a complete restored network. The significant advantage of this strategy is minimizing duration of restoration. On the other hand, the use of Wide Area... 

    Upgrading "Qaed Basir"Petrochemical Wastewater Treatment Plant

    , M.Sc. Thesis Sharif University of Technology Maqsudi, Matin (Author) ; Borghei, Mehdi (Supervisor) ; Shayegan Salek, Jalaledin (Supervisor)
    Abstract
    Golpayegan Qaed Basir Petrochemical Company is one of the lucrative and entrepreneurial companies in Iran. Every day in this complex, a large amount of wastewater is being generated and transferred to the evaporative lag after the primary and secondary purification outside the complex and it is not restored. Considering the growing importance of surface and underground water resources, reuse of wastewater is a valuable production. In this research, the optimization of the sewage treatment system of the complex was evaluated by replacing the chemicals in the primary purification unit and also by using chloride-ferric and trickling filter for tertiary purification(treating) of the... 

    Seismic Performance Assessment of Historical Structures and Presenting their Seismic Rehabilitation Plan ; a Case Study : Soltanieh Dome

    , M.Sc. Thesis Sharif University of Technology Asgari, Pouya (Author) ; Bakhshi, Ali (Supervisor)
    Abstract
    Preservation of historical monuments is a very important issue for future generations. The importance of this issue is doubled when we know that most of these buildings are traditionally built and do not have a single structure to withstand seismic loads. One of such buildings in our country is Bam Citadel, which was completely destroyed as the oldest brick building in the world during the 2003 Bam earthquake.In this project, we will try to find a model that can determine the structural behavior of the historical dome of Soltanieh for engineers in a case study. This building is a brick dome with a height of 48.5 meters and a diameter of 24.4 meters from the seventh century , which is unique... 

    Mahaarloo Salt Lake Restoration Policy Study Using DPSIR Approach

    , M.Sc. Thesis Sharif University of Technology Shoorrahmati, Abdullah (Author) ; Abrishamchi, Ahmad (Supervisor)
    Abstract
    Lakes, marshes, and wetlands shrinkage and drying up due to natural and human driving forces is today one of the most important concerns in the world. Mahaarloo Salt Lake in southern part of Iran is (18 km far from south eastern of Shiraz ) drying-up and is faced with ecologic and environmental degradation. It recharges from western north by upstream basin of Shiraz and 3 rivers named Khoshk, Chenaarrahdaar, Soltaanabad and also from eastern south by Nazarabad river located in Sarvestan basin (Regional water org. of Fars 1382). In recent years, the shrinkage of Mahaarloo has been exacerbated by mismanagement of water resources, inappropriate land use, ignoring allocation of environmental... 

    Distance Relay Blocking in Power Restoration

    , M.Sc. Thesis Sharif University of Technology Sebt-Ahmadi, Mohammad (Author) ; Abbaspour Tehrani Fard, Ali (Supervisor) ; Ranjbar, Ali Mohammad (Supervisor)
    Abstract
    It is possible to unload a transmission line for a while. In line restoration voltage and current of the line will have some dynamic changes. So the apparent impedance of distance relay will have dynamic changes. These changes may cause some bad results including entrance of apparent impedance to the operational zones of distance relay and even relay tripping. Consequently if relay trips, the line restoration process will stop and may not be possible.
    So we want an algorithm to distinguish line restoration from short circuit condition and block the relay. This algorithm must be able to stop blocking if there is any fault in the operational zones of the relay.
    In this thesis an... 

    Design a Comprehensive Framework for Distribution System Restoration in the Presence of Distributed Generations and Energy Storage Systems

    , Ph.D. Dissertation Sharif University of Technology Riahinia, Shahin (Author) ; Abbaspour Tehrani Fard, Ali (Supervisor) ; Moeini Aghtaie, Moein (Co-Supervisor)
    Abstract
    This thesis presents a stochastic framework to properly involve the uncertainties associated with demand in distribution system restoration (DSR) problem. The restoration process returns the system back to normal operation after any combination of system components have been lost due to an outage. During restoration, the system operator executes a set of actions that progressively mitigate the outage. These actions aim at minimizing the impact of the outage on the final user without compromising the security and operability of the system. In this framework, dynamic programming (DP) is used to solve DSR problem for a distribution system that accommodates various technologies of DG units and... 

    Design of an Efficient High Bandwidth Supply Modulator

    , M.Sc. Thesis Sharif University of Technology Hamidizadeh, Ali (Author) ; Safarian, Amin Ghasem (Supervisor) ; Fotowat Ahmadi, Ali (Supervisor)
    Abstract
    Efficient radio frequency (RF) power amplifiers (PAs) are critical in portable battery-operated wireless communication systems because they can dominate the power consumption. Linear amplifiers are enough linear but suffer from poor efficiency. On the other hand, switching power amplifier are efficient but are nonlinear and just amplify constant envelope signals. Two conventional methods for increasing transmitter efficiency and linearity are envelope elimination and restoration (EER) and envelope tracking (ET). In both methods, supply modulator controls RF power amplifier supply based on the signal envelope. Efficiency and bandwidth are critical factors in supply modulator. Thus hybrid... 

    Power System Restoration Strategies Realizing the Switching Overvoltages

    , M.Sc. Thesis Sharif University of Technology Helmzadeh, Amin (Author) ; Vakilian, Mahdi (Supervisor)
    Abstract
    Since the power systems usually are being operated close to their nominal capacity due to economical reasons, the probability of wide blackouts in power grids have been increased. However by employing suitable strategies the probability of huge blackouts is still very small but if they occur may put the power system operators in trouble while restoring the system. Thus many studies have been conducted in recent years dealing with power system restoration planning to achieve fast and reliable restoration plans. The scope of this project is overvoltage assessment during system restoration. In this manner we can find the optimal strategy with the least overvoltage problems to prevent the... 

    Investigation of Steel Plate Shear Wall Behavior with Shape Memory Alloy Connection

    , M.Sc. Thesis Sharif University of Technology Haghi, Farzad (Author) ; Mofid, Masoud (Supervisor) ; Mohtasham Dolatshahi, Kiarash (Co-Advisor)
    Abstract
    In recent decades, restoring residual deformations and adding the capability of returning to initial deformed state was investigated by many researchers. Steel Plate Shear Wall (SPSW) is one of structural earthquake resisting system that have high ductility capacity and good energy absorption property. On of major issues in SPSW systems is intense nonlinear deformation in panel’s infill web plate and this panels vertical and horizontal boundary elements. By incorporating Shape Memory Alloy (SMA) connections we can add returning to first deformed condition (self-centering) and sustain high ductility capacity to many structures. In this research the addition of SMA connections to SPSW system... 

    Re-Creation of Lost Gas Layer on Superhydrophobic Surfaces with Micro/Nanostructures

    , M.Sc. Thesis Sharif University of Technology Jabari Farokhi, Salar (Author) ; Mosavi, Ali (Supervisor)
    Abstract
    Due to their unique characteristics, such as drag reduction, anti-fouling, and enhancing condensation, hydrophobic and superhydrophobic surfaces have attracted a lot of attention in the past decades. Since approximately 4% of the fossil fuel usage and 14-19% of the air pollution (including greenhouse gases, sulfur, and so forth) are attributed to naval activities, and the dominant form of drag on vessels is friction, drag reduction will not only reduce the cost and usage of fossil fuels, but it will also have numerous environmental benefits  

    Restoration of historical Al-Askari shrine. II: Vulnerability assessment by numerical simulation

    , Article Journal of Performance of Constructed Facilities ; Volume 30, Issue 3 , 2016 ; 08873828 (ISSN) Yekrangnia, M ; Aghababai Mobarake, A ; Sharif University of Technology
    American Society of Civil Engineers (ASCE) 
    Abstract
    This paper presents the results of a vulnerability assessment of the damaged Al-Askari shrine located in Samarra, Iraq by finite element analysis. Reliable material characteristics are derived using limited experimental data on this historical building in order to be utilized in the numerical models. It is concluded that the cracked piers are not vulnerable under the weight of the newly added dome. However, the cracks in the piers widen under design seismic loads, which results in unbalanced settlements in the piers and torsional cracks in the dome. The vulnerability of the minarets is more severe, necessitating heavy reinforcement at their bases and adequate anchorage to the masonry... 

    Restoration of historical Al-Askari shrine. I: Field observations, damage detection, and material properties

    , Article Journal of Performance of Constructed Facilities ; Volume 30, Issue 3 , 2016 ; 08873828 (ISSN) Yekrangnia, M ; Aghababai Mobarake, A ; Sharif University of Technology
    American Society of Civil Engineers (ASCE) 
    Abstract
    The Al-Askari shrine, located in Samarra, Iraq, is a remarkable example of a building with ancient Islamic architecture and construction that was heavily damaged by massive bombings. The bombings were carried out by two separate terrorist attacks in 2006 and 2007. This paper summarizes the important undertakings in the identification of shrine buildings in terms of structural and architectural background and characteristics, damage classification and monitoring, site conditions and material properties. Moreover, the shortcomings of a series of previously performed partial restorations are elaborated upon. The results and findings of this study can be utilized as database in other numerical... 

    Wide-area frequency control during power system restoration

    , Article EPEC 2010 - IEEE Electrical Power and Energy Conference: "Sustainable Energy for an Intelligent Grid", 25 August 2010 through 27 August 2010, Halifax, NS ; 2010 ; 9781424481880 (ISBN) Yari, V ; Nourizadeh, S ; Ranjbar, A. M ; Sharif University of Technology
    2010
    Abstract
    One of important subjects in power system restoration that already is not addressed is frequency control. Operators are often concerned with the size of load and generation, which can be safely increased. With the emphasis on higher utilization of power systems, monitoring of its dynamics is becoming increasingly important. This requires information with higher accuracy and update rates faster than those usually provided by traditional SCADA systems. In addition, it must be synchronized over a wider geographical area than that provided by traditional protection systems. Nowadays, the introduction of Phasor Measurement Units (PMU) and Wide Area Monitoring Systems (WAMS) as well as advances in... 

    Determining the best sequence of load pickup during power system restoration

    , Article 2010 9th Conference on Environment and Electrical Engineering, EEEIC 2010, 16 May 2010 through 19 May 2010 ; May , 2010 , Pages 1-4 ; 9781424453719 (ISBN) Yari, V ; Nourizadeh, S ; Ranjbar, A. M ; Sharif University of Technology
    2010
    Abstract
    The first control action in power system restoration concerns the generation restart. In the initial phase of restoration, operators are often concerned with load pickup problems. One of the important problems during load pickup is keeping frequency response in allowable range. The aim of this paper is to determine the best sequence of load pickup by hydro and steam units during power system restoration based on frequency response of prime movers. Hydro power plants and combustion turbine units have the capability of black start operation and can be used for early stages of power system restoration. This paper considers hydro power plants for evaluating the stability and frequency response... 

    Hierarchical Enhancement of Optical Coherence Tomography Images

    , Article 24th Iranian Conference on Biomedical Engineering and 2017 2nd International Iranian Conference on Biomedical Engineering, ICBME 2017, 30 November 2017 through 1 December 2017 ; 2018 ; 9781538636091 (ISBN) Turani, Z ; Fatemizadeh, E ; Nasiri Avanaki, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2018
    Abstract
    Optical coherence tomography (OCT) is a noninvasive imaging modality that provides cross-sectional images from microstructures of tissues. This optical imaging system works based on Michelson interferometry principle and has intermediate resolution and penetration depth which makes it appropriate for imaging thin tissues such as skin and eye. OCT images suffer from three main artifacts that make images difficult to be analyzed. The first one is small grainy structures called speckle which degrade image quality and decreases axial and lateral resolution. The second one is light intensity attenuation which is a function of depth. It happens because of absorbing and scattering nature of tissue... 

    A two-step watermarking attack using long-range correlation image restoration

    , Article Security and Communication Networks ; Volume 5, Issue 6 , AUG , 2012 , Pages 625-635 ; 19390122 (ISSN) Taherinia, A. H ; Jamzad, M ; Sharif University of Technology
    2012
    Abstract
    This paper presents an efficient scheme for blind watermark attacking using the concept of matching of the long-range data. The main idea of the proposed attack is to add plenty of noise to the watermarked image and then try to restore an unwatermarked copy of the noisy image. The aim is to destroy the watermark information without accessing the parameters used during the watermark embedding process. So, it allows our approach to be completely free from any pre-assumption on the watermarking algorithm or any other parameters that is used during the watermark embedding procedure. Experimental results show the proposed algorithm's superiority over several other traditional watermarking... 

    Tie-line planning for resilience enhancement in unbalanced distribution networks

    , Article IET Generation, Transmission and Distribution ; 2021 ; 17518687 (ISSN) Taheri, B ; Safdarian, A ; Sharif University of Technology
    John Wiley and Sons Inc  2021
    Abstract
    Over the past decades, there has been a dramatic increase in the frequency of natural disasters, which are the leading causes of large-scale power outages. This paper, therefore, assesses the significance and role of optimal tie-line construction in improving the service restoration performance of unbalanced power distribution systems in the aftermath of high-impact low-probability incidents. In doing so, a restoration process aware stochastic mixed-integer linear programming model is developed to find the optimal locations for new tie-line construction in unbalanced three-phase distribution systems. In particular, the restoration process of distribution systems, including the fault... 

    Tie-line planning for resilience enhancement in unbalanced distribution networks

    , Article IET Generation, Transmission and Distribution ; Volume 16, Issue 5 , 2022 , Pages 1030-1046 ; 17518687 (ISSN) Taheri, B ; Safdarian, A ; Sharif University of Technology
    John Wiley and Sons Inc  2022
    Abstract
    Over the past decades, there has been a dramatic increase in the frequency of natural disasters, which are the leading causes of large-scale power outages. This paper, therefore, assesses the significance and role of optimal tie-line construction in improving the service restoration performance of unbalanced power distribution systems in the aftermath of high-impact low-probability incidents. In doing so, a restoration process aware stochastic mixed-integer linear programming model is developed to find the optimal locations for new tie-line construction in unbalanced three-phase distribution systems. In particular, the restoration process of distribution systems, including the fault...