Loading...
Search for: nonlinear-programming
0.011 seconds
Total 161 records

    Optimal location-multi-allocation-routing in capacitated transportation networks under population-dependent travel times

    , Article International Journal of Computer Integrated Manufacturing ; Volume 29, Issue 6 , 2016 , Pages 652-676 ; 0951192X (ISSN) Shiripour, S ; Mahdavi Amiri, N ; Mahdavi, I ; Sharif University of Technology
    Taylor and Francis Ltd  2016
    Abstract
    A capacitated location-multi-allocation-routing model is presented for a transportation network with travel times between the nodes represented by links on the network. The concept of multi-allocation arises from the possibility of allocating the population in a demand node to more than one server node. In normal conditions, travel time between two nodes is a fixed value. However, since the flow of population in a link can affect the travel time, here the impact of the population flow on link time is considered to be simultaneous. This way, distribution of the population over the network has a direct influence on the travel link times. It is assumed that all links are two-way and capacities... 

    Optimal fuel core loading pattern design in PWR nuclear power reactors using genetic algorithms and fuzzy nonlinear programming

    , Article Journal of Intelligent and Fuzzy Systems ; Volume 14, Issue 2 , 2003 , Pages 85-93 ; 10641246 (ISSN) Boroushaki, M ; Ghofrani, M. B ; Lucas, C ; Sharif University of Technology
    2003
    Abstract
    In pressurized water reactors, the fuel reloading problem has significant meaning in terms of both safety and economics. An optimal loading pattern is defined as a pattern in which the local power peaking factor (Pq) is lower than a predetermined value during one cycle and the effective multiplication factor (keff) is maximized to extract the maximum energy. This article presents a specialized genetic algorithm for loading pattern design. The tests on well-researched cases have shown that the genetic algorithm is capable of finding better loading patterns than solutions found by direct search methods. However, most of the previous researchers have considered simple fitness (cost) functions;... 

    Optimal control of an assisted passive snake-like robot using feedback linearization

    , Article 31st Mechanisms and Robotics Conference, presented at - 2007 ASME International Design Engineering Technical Conferences and Computers and Information in Engineering Conference, IDETC/CIE2007, Las Vegas, NV, 4 September 2007 through 7 September 2007 ; Volume 8 PART B , 2008 , Pages 867-876 ; 0791848027 (ISBN); 9780791848029 (ISBN); 0791848094 (ISBN); 9780791848098 (ISBN) Mohammadi, S ; Pendar, H ; Heidari, Z ; Alasty, A ; Vossoughi, G ; Sharif University of Technology
    2008
    Abstract
    In this paper we follow two approaches in optimal nonlinear control of a snake-like robot. After deriving the dynamic equations of motion using Gibbs-Appell method, reducing these equations, and some assumptions, feedback-linearization method was used to linearize the nonlinear system. The obtained controller is used in simulations to control robot to track a desired line, with minimum required torques. Two goals are desired. First the robot's head is expected to track a distinct line with a given speed. And next, tracking the serpenoid curve is desired. The simulation results prove the controller efficiency. The robustness of the designed controller is shown by comparing the torques with... 

    Optimal apogee burn time for low thrust spinning satellite in low altitude

    , Article European Journal of Operational Research ; Volume 222, Issue 2 , 2012 , Pages 386-391 ; 03772217 (ISSN) Fakhri Noushabadi, M ; Assadian, N ; Sharif University of Technology
    2012
    Abstract
    In this study, the optimal burn time for low-thrust impulsive propulsion systems is investigated to raise the perigee altitude of a low-Earth orbit. The maneuver is done using spin-stabilized attitude control and impulsive thrusting system for a time interval centered about apogee point. On the one hand, the low value of the thrust level causes more burn time needed to accomplish the transfer. This, in turn, will cause more thrust loss due to the deviation between the thrust axis (spin axis) and the velocity vector of the satellite. On the other hand, for small thrust duration, the transfer needs more revolutions around the Earth and more travel in lower altitudes with dense atmosphere and... 

    Optimal allocation of distributed generation using a two-stage multi-objective mixed-integer-nonlinear programming

    , Article European Transactions on Electrical Power ; Volume 21, Issue 1 , 2011 , Pages 1072-1087 ; 1430144X (ISSN) Porkar, S ; Poure, P ; Abbaspour Tehrani Fard, A ; Saadate, S ; Sharif University of Technology
    Abstract
    Cost is one of the most essential factors that influence many decisions taken in the distribution system planning. In general, cost can be defined as everything that should be sacrificed to gain the desired results. This paper proposes a new two-stage methodology for distributed generation (DG) placement as an attractive option for distribution system planner. This method aims to minimize cost and maximize total system benefit (TSB). Optimal placement and size are obtained from total cost minimization mathematical problem which is solved in the first stage. For each DG cost characteristics and for each investment payback time, there is an optimal location and size. Then the optimal DG... 

    Operation of networked multi-carrier microgrid considering demand response

    , Article COMPEL - The International Journal for Computation and Mathematics in Electrical and Electronic Engineering ; Volume 38, Issue 2 , 2019 , Pages 724-744 ; 03321649 (ISSN) Amir, V ; Jadid, S ; Ehsan, M ; Sharif University of Technology
    Emerald Group Publishing Ltd  2019
    Abstract
    Purpose: Microgrids are inclined to use renewable energy resources within the availability limits. In conventional studies, energy interchange among microgrids was not considered because of one-directional power flows. Hence, this paper aims to study the optimal day-ahead energy scheduling of a centralized networked multi-carrier microgrid (NMCMG). The energy scheduling faces new challenges by inclusion of responsive loads, integration of renewable sources (wind and solar) and interaction of multi-carrier microgrids (MCMGs). Design/methodology/approach: The optimization model is formulated as a mixed integer nonlinear programing and is solved using GAMS software. Numerical simulations are... 

    Nonlinear aeroelastic response of slender wings based on Wagner function

    , Article Thin-Walled Structures ; Volume 46, Issue 11 , 2008 , Pages 1192-1203 ; 02638231 (ISSN) Shams, Sh ; Sadr Lahidjani, M. H ; Haddadpour, H ; Sharif University of Technology
    2008
    Abstract
    This paper presents a method for nonlinear aeroelastic analysis of Human Powered Aircraft (HPA) wings. In this type of aircraft there is a long, highly flexible wing. Wing flexibility, coupled with long wing span can lead to large deflections during normal flight operation; therefore, a wing in vertical and torsional motion using the second-order form of nonlinear general flexible Euler-Bernoulli beam equations is used for structural modeling. Unsteady linear aerodynamic theory based on Wagner function is used for determination of aerodynamic loading on the wing. Combining these two types of formulations yields the nonlinear integro-differentials aeroelastic equations. Using the Galerkin's... 

    Multistage expansion co-planning of integrated natural gas and electricity distribution systems

    , Article Energies ; Volume 12, Issue 6 , 2019 ; 19961073 (ISSN) Jooshaki, M ; Abbaspour, A ; Fotuhi Firuzabad, M ; Moeini Aghtaie, M ; Lehtonen, M ; Sharif University of Technology
    MDPI AG  2019
    Abstract
    This paper focuses on expansion co-planning studies of natural gas and electricity distribution systems. The aim is to develop a mixed-integer linear programming (MILP) model for such problems to guarantee the finite convergence to optimality. To this end, at first the interconnection of electricity and natural gas networks at demand nodes is modelled by the concept of energy hub (EH). Then, mathematical model of expansion studies associated with the natural gas, electricity and EHs are extracted. The optimization models of these three expansion studies incorporate investment and operation costs. Based on these separate planning problems, which are all in the form of mixed-integer nonlinear... 

    Multistage expansion co-planning of integrated natural gas and electricity distribution systems

    , Article Energies ; Volume 12, Issue 6 , 2019 ; 19961073 (ISSN) Jooshaki, M ; Abbaspour, A ; Fotuhi Firuzabad, M ; Moeini Aghtaie, M ; Lehtonen, M ; Sharif University of Technology
    MDPI AG  2019
    Abstract
    This paper focuses on expansion co-planning studies of natural gas and electricity distribution systems. The aim is to develop a mixed-integer linear programming (MILP) model for such problems to guarantee the finite convergence to optimality. To this end, at first the interconnection of electricity and natural gas networks at demand nodes is modelled by the concept of energy hub (EH). Then, mathematical model of expansion studies associated with the natural gas, electricity and EHs are extracted. The optimization models of these three expansion studies incorporate investment and operation costs. Based on these separate planning problems, which are all in the form of mixed-integer nonlinear... 

    Multiproduct multiple-buyer single-vendor supply chain problem with stochastic demand, variable lead-time, and multi-chance constraint

    , Article Expert Systems with Applications ; Volume 39, Issue 5 , 2012 , Pages 5338-5348 ; 09574174 (ISSN) Taleizadeh, A. A ; Niaki, S. T. A ; Makui, A ; Sharif University of Technology
    2012
    Abstract
    In this paper, a multi-product multi-chance constraint joint single-vendor multi-buyers inventory problem is considered in which the demand follows a uniform distribution, the lead-time is assumed to vary linearly with respect to the lot size, and the shortage in combination of backorder and lost-sale is assumed. Furthermore, the orders are placed in multiple of packets, there is a limited space available for the vendor, there are chance constraints on the vendor service rate to supply the products, and there is a limited budget for each buyer to purchase the products. While the elements of the buyers' cost function are holding, shortage, order and transportation costs, the set up and... 

    Multi-product multi-constraint inventory control systems with stochastic replenishment and discount under fuzzy purchasing price and holding costs

    , Article American Journal of Applied Sciences ; Volume 6, Issue 1 , 2009 , Pages 1-12 ; 15469239 (ISSN) Taleizadeh, A. A ; Akhavan Niaki, S. T ; Aryaneznad, M. B ; Sharif University of Technology
    2009
    Abstract
    While in multi-periodic inventory control problems the usual assumption are that the orders are placed at the beginning of each period (periodic review) or depending on the inventory level they can happen at any time (continuous review), in this research, we relax these assumptions and assume that the periods between two replenishments of the products are independent and identically distributed random variables. Furthermore, assuming the purchasing price are triangular fuzzy variables, the quantities of the orders are of integer-type and that there are space, budget and service level constraints, incremental discount is considered to purchase products and a combination of back-order and... 

    Multi-product multi-chance-constraint stochastic inventory control problem with dynamic demand and partial back-ordering: A harmony search algorithm

    , Article Journal of Manufacturing Systems ; Volume 31, Issue 2 , 2012 , Pages 204-213 ; 02786125 (ISSN) Taleizadeh, A. A ; Niaki, S. T. A ; Seyedjavadi, S. M. H ; Sharif University of Technology
    Abstract
    In this paper, a multiproduct inventory control problem is considered in which the periods between two replenishments of the products are assumed independent random variables, and increasing and decreasing functions are assumed to model the dynamic demands of each product. Furthermore, the quantities of the orders are assumed integer-type, space and budget are constraints, the service-level is a chance-constraint, and that the partial back-ordering policy is taken into account for the shortages. The costs of the problem are holding, purchasing, and shortage. We show the model of this problem is an integer nonlinear programming type and to solve it, a harmony search approach is used. At the... 

    Multiple-buyer multiple-vendor multi-product multi-constraint supply chain problem with stochastic demand and variable lead-time: A harmony search algorithm

    , Article Applied Mathematics and Computation ; Volume 217, Issue 22 , July , 2011 , Pages 9234-9253 ; 00963003 (ISSN) Taleizadeh, A. A ; Niaki, S. T. A ; Barzinpour, F ; Sharif University of Technology
    2011
    Abstract
    In this paper, a multi-buyer multi-vendor supply chain problem is considered in which there are several products, each buyer has limited capacity to purchase products, and each vendor has warehouse limitation to store products. In this chain, the demand of each product is stochastic and follows a uniform distribution. The lead-time of receiving products from a vendor to a buyer is assumed to vary linearly with respect to the order quantity of the buyer and the production rate of the vendor. For each product, a fraction of the shortage is backordered and the rest are lost. The ordered product quantities are placed in multiple of pre-defined packets and there are service rate constraints for... 

    Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint

    , Article International Journal of Advanced Manufacturing Technology ; Vol. 70, Issue. 1-4 , January , 2014 , pp. 501-514 ; ISSN: 02683768 Nejati, M ; Mahdavi, I ; Hassanzadeh, R ; Mahdavi-Amiri, N ; Mojarad, M ; Sharif University of Technology
    Abstract
    Lot streaming means breaking a lot into sublots, where sublots may be transferred to a number of machines for the operations. Here, the multi-job lot streaming problem in a multistage hybrid flow shop having identical parallel machines at stages with work-in-process (WIP) jobs, work shifts constraint, and sequence-dependent setup times is studied. The aim is to minimize the sum of weighted completion times of jobs in each shift in order to furnish a better machine utilization for the following shifts. Our model in meeting the job demands appropriates job scheduling onmachines for processing, the sequence of operations on allocated machines, the size of the sublots in the work shifts, the... 

    Multi-facility location problems in the presence of a probabilistic line barrier: A mixed integer quadratic programming model

    , Article International Journal of Production Research ; Volume 50, Issue 15 , Jul , 2012 , Pages 3988-4008 ; 00207543 (ISSN) Shiripour, S ; Mahdavi, I ; Amiri Aref, M ; Mohammadnia Otaghsara, M ; Mahdavi Amiri, N ; Sharif University of Technology
    T&F  2012
    Abstract
    We consider a multi-facility location problem in the presence of a line barrier with the starting point of the barrier uniformly distributed. The objective is to locate n new facilities among m existing facilities minimising the summation of the weighted expected rectilinear barrier distances of the locations of new facilities and new and existing facilities. The proposed problem is designed as a mixed-integer nonlinear programming model, conveniently transformed into a mixed-integer quadratic programming model. The computational results show that the LINGO 9.0 software package is effective in solving problems with small sizes. For large problems, we propose two meta-heuristic algorithms,... 

    Modeling and solving a capacitated stochastic location-allocation problem using sub-sources

    , Article Soft Computing ; Volume 20, Issue 6 , 2016 , Pages 2261-2280 ; 14327643 (ISSN) Alizadeh, M ; Mahdavi Amiri, N ; Shiripour, S ; Sharif University of Technology
    Springer Verlag 
    Abstract
    We study a capacitated multi-facility location-allocation problem in which the customers have stochastic demands based on Bernoulli distribution function. We consider the capacitated sub-sources of facilities to satisfy demands of customers. In the discrete stochastic problem, the goal is to find optimal locations of facilities among candidate locations and optimal allocations of existing customers to operating facilities so that the total sum of fixed costs of operating facilities, allocation cost of the customers, expected values of servicing and outsourcing costs is minimized. The model is formulated as a mixed-integer nonlinear programming problem. Since finding an optimal solution may... 

    MILP model for integrated expansion planning of multi-carrier active energy systems

    , Article IET Generation, Transmission and Distribution ; Volume 13, Issue 7 , 2019 , Pages 1177-1189 ; 17518687 (ISSN) Ghasemi, H ; Aghaei, J ; Gharehpetian, G. B ; Safdarian, A ; Sharif University of Technology
    Institution of Engineering and Technology  2019
    Abstract
    In growing economic energy systems, the interdependency of various energy infrastructures has led to a change in countries' policies in their expansion planning of energy networks. In this study, a mixed-integer non-linear programming (MINLP) model is proposed for expansion planning of the multi-carrier systems including electricity and gas distribution networks. The optimal planning determines the best location, time, and alternative for network assets in order to minimise investment costs and reduce losses. Also, as another distinctive feature of this study, given the integration of electricity and gas distribution networks and the complexity of the problem, a new MILP model using... 

    Median location problem with two probabilistic line barriers: Extending the hook and jeeves algorithm

    , Article Journal of Industrial and Management Optimization ; Volume 18, Issue 5 , 2022 , Pages 3613-3639 ; 15475816 (ISSN) Shiripour, S ; Mahdavi Amiri, N ; Sharif University of Technology
    American Institute of Mathematical Sciences  2022
    Abstract
    We consider a median location problem in the presence of two probabilistic line barriers on the plane under rectilinear distance. It is assumed that the two line barriers move on their corresponding horizontal routes uniformly. We first investigate different scenarios for the position of the line barriers on the plane and their corresponding routes, and then define the visibility and invisibility conditions along with their corresponding expected barrier distance functions. The proposed problem is formulated as a mixed-integer nonlinear programming model. Our aim is to locate a new facility on the plane so that the total weighted expected rectilinear barrier distance is minimized. We present... 

    Maintenance based distribution network expansion planning

    , Article 25th Iranian Conference on Electrical Engineering, ICEE 2017, 2 May 2017 through 4 May 2017 ; 2017 , Pages 1004-1009 ; 9781509059638 (ISBN) Gholami, M ; Moeini Aghtaie, M ; Safdarian, A ; Abbaspour Tehrani Fard, A ; Sharif University of Technology
    Abstract
    This paper develops a reliability-based model for distribution network expansion planning (DNEP) studies. It incorporates the effects of distribution line maintenance in the planning studies to be considered as an alternative for the installation of feeders. To that end, at first, some models are introduced to effectively estimate the effects of maintenance activities budget on distribution lines' failure and repair rates. Therefore, the reliability data of distribution lines are updated in the reliability evaluation studies of distribution networks. Then, these models are involved in the formulation of DNEP problem which is introduced as a multi-objective optimization model. The developed... 

    Lifetime oriented multi-objective cost optimization of structural maintenance considering the safety of the system

    , Article Proceedings, Annual Conference - Canadian Society for Civil Engineering, 28 May 2014 through 31 May 2014 ; Volume 1 , May , 2015 , Pages 656-663 ; 9781510818781 (ISBN) Piryonesi, S. M ; Nasserl, M ; Tavakolan, M ; Sharif University of Technology
    Canadian Society for Civil Engineering  2015
    Abstract
    Nowadays the maintenance of the deteriorating structures is an important subject in industry and research. Due to the limitations of the budget and time, the optimization algorithms have been used widely to determine the best maintenance strategies to provide the more economical structures. On the other side, the Less life-cycle cost will result in less safe structures. As safety is a vital criterion for the users of a structural system, there is a severe need to make a suitable trade-off between cost and safety. So, the optimal maintenance strategies are those that fulfill both the safety and the economical requirements. In this paper, the reliability of the structural system is selected to...