    Optimal distributed static series compensator placement for enhancing power system loadability and reliability

    , Article IET Generation, Transmission and Distribution ; Volume 9, Issue 11 , 2015 , Pages 1043-1050 ; 17518687 (ISSN) Dorostkar Ghamsari, M ; Fotuhi Firuzabad, M ; Aminifar, F ; Safdarian, A ; Lehtonen, M ; Sharif University of Technology
    Institution of Engineering and Technology  2015
    Abstract
    Distributed static series compensator (DSSC) is a member of the family of distributed flexible AC transmission system devices that can be attached directly to conductors of transmission lines. DSSCs are able to compensate for and adjust the line reactance; thus, they could be widely used in stability-limited transmission systems. Owing to economic matters, the optimal placement of DSSCs is of a great interest from practical viewpoints. This study presents an approach to find the optimal locations of DSSCs to enhance the system loadability and reliability using the DC load flow model. The optimisation problem is solved using the mixed-integer linear programming. A compromise between improving... 

    A performance-based markov modeling for reliability evaluation of competitive electricity markets

    , Article Proceedings of the 10th IASTED International Conference on Power and Energy Systems, PES 2008, 16 April 2008 through 18 April 2008, Baltimore, MD ; 2008 , Pages 215-220 ; 9780889867383 (ISBN) Ehsani, A ; Ranjbar, A. M ; Fotuhi Firuzabad, M ; Sharif University of Technology
    2008
    Abstract
    In the new deregulated environment of electric power utility industry, new system reliability criteria and analytical tools are required. This paper proposes an analytical probabilistic model for reliability evaluation of competitive electricity markets. The market reliability is evaluated by using Markov state space diagram. Since the market is a continuously operated system, the concept of absorbing states is applied to it in order to evaluate the reliability. The market states are identified by using market performance indices and the transition rates are calculated by using historical data. To illustrate interesting feature of the proposed methodology, a case study is carried out over a... 

    Design and implementation of an online precise monitoring and performance analysis system for centrifugal pumps

    , Article IEEE Transactions on Industrial Electronics ; 2017 ; 02780046 (ISSN) Emami, S. A ; Emami, M. H ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2017
    Abstract
    Development of design and production technology of centrifugal pumps for achieving better performance and less energy consumption in these devices has increasingly been taken into consideration. This is due to the fact that centrifugal pumps have an important contribution in industrial applications and energy consumption around the world. Accordingly, the international standards of centrifugal pumps, urge more precise analysis systems for obtaining the performance curves of these pumps. For this reason, a complete, precise and real-time monitoring and performance analysis system for centrifugal pumps is introduced in this paper. The pump characteristics are measured by precise measuring... 

    Role of fiber arrangements in operation of a double-fiber opto-mechanical system

    , Article Journal of Applied Sciences ; Volume 11, Issue 16 , 2011 , Pages 3001-3007 ; 18125654 (ISSN) Entezari, E ; Golnabi, H ; Sharif University of Technology
    2011
    Abstract
    Determination of the surface structure using the light reflection is an important issue. The aim is to study such surface reflections using an opto-mechanical system. The effects of the fiber arrangements in the operation of an opto-pair probe system for surface profiling are described. The opto-mechanical testing system consists of a double-fiber optical probe design and an electro-mechanical scanning system. Reflection signals for the plane and cylindrical surfaces made with different curvatures and materials are investigated with both probes and the results are compared. The reflection signal for the plane surface is independent of the double-fiber orientation in probe but for the curves... 

    Novel approaches for online modal estimation of power systems using PMUs data contaminated with outliers

    , Article Electric Power Systems Research ; Volume 124 , July , 2015 , Pages 74-84 ; 03787796 (ISSN) Farrokhifard, M ; Hatami, M ; Parniani, M ; Sharif University of Technology
    Elsevier Ltd  2015
    Abstract
    One of the most important issues in modal estimation of power systems using PMUs data is the negative effect of outliers. Hence, in addition to the techniques of analyzing PMUs data, the necessity of implementing some kinds of approach to overcome these outliers is tangible. This paper aims to present different approaches to overcome outliers and also estimate the electromechanical modes of the system accurately when there is suspicion that the PMUs data may be contaminated by discordant measurements. Proposed approaches are generally categorized into two main classifications: the first category detects and modifies outliers in the pre-processing stage adaptively and then prepares the... 

    Reliability-based maintenance scheduling of generating units in restructured power systems

    , Article Turkish Journal of Electrical Engineering and Computer Sciences ; Vol. 22, issue. 5 , 2014 , p. 1147-1158 ; ISSN: 13000632 Fotuhi-Firuzabad, M ; Aminifar, F ; Shahzadeh, A ; Sharif University of Technology
    Abstract
    Maintenance scheduling of generating units in restructured power systems is a collaborative and interactive process between independent system operators (ISOs) and generating companies (GENCOs). The ISO should comply with GENCO maintenance preferences subject to targeted system reliability levels. This process might be multistage since the admission of all initial unit outage requests may threaten system reliability. Hence, the ISO accepts some proposals and determines alternatives for the remaining units. The GENCOs are then allowed to confirm the alternatives or revise them. In this paper the ISO problem of generating unit maintenance scheduling is tackled. The objective function is to... 

    Reliability-based selection of wind turbines for large-scale wind farms

    , Article World Academy of Science, Engineering and Technology ; Volume 37 , 2009 , Pages 734-740 ; 2010376X (ISSN) Fotuhi Firuzabad, M ; Salehi Dobakhshari, A ; Sharif University of Technology
    2009
    Abstract
    This paper presents a reliability-based approach to select appropriate wind turbine types for a wind farm considering site-specific wind speed patterns. An actual wind farm in the northern region of Iran with the wind speed registration of one year is studied in this paper. An analytic approach based on total probability theorem is utilized in this paper to model the probabilistic behavior of both turbines' availability and wind speed. Well-known probabilistic reliability indices such as loss of load expectation (LOLE), expected energy not supplied (EENS) and incremental peak load carrying capability (IPLCC) for wind power integration in the Roy Billinton Test System (RBTS) are examined. The... 

    A novel detection algorithm to identify false data injection attacks on power system state estimation

    , Article Energies ; Volume 12, Issue 11 , 2019 ; 19961073 (ISSN) Ganjkhani, M ; Fallah, S. N ; Badakhshan, S ; Shamshirband, S ; Chau, K. W ; Sharif University of Technology
    MDPI AG  2019
    Abstract
    This paper provides a novel bad data detection processor to identify false data injection attacks (FDIAs) on the power system state estimation. The attackers are able to alter the result of the state estimation virtually intending to change the result of the state estimation without being detected by the bad data processors. However, using a specific configuration of an artificial neural network (ANN), named nonlinear autoregressive exogenous (NARX), can help to identify the injected bad data in state estimation. Considering the high correlation between power system measurements as well as state variables, the proposed neural network-based approach is feasible to detect any potential FDIAs.... 

    A new multiattribute decision making support tool for identifying critical components in power transmission systems

    , Article IEEE Systems Journal ; Volume 12, Issue 1 , 2018 , Pages 316-327 ; 19328184 (ISSN) Gharakheili, M. A ; Fotuhi Firuzabad, M ; Dehghanian, P ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2018
    Abstract
    The present context of the electric industry, characterized by competitive markets, privatization, and regulatory of technical requirements forces the power utilities to optimize their asset management practices and develop the requisite decision plans techno-economically. Practically approaching, this paper devises a new support tool based on a multiattribute decision making (MADM) framework in combination with analytical hierarchical process (AHP) to determine the most critical components of power transmission systems. Measure of system-wide reliability performance, outage cost, marginal clearing prices demonstrative of market fairness, and network losses are among the attributes... 

    Planning in microgrids with conservation of voltage reduction

    , Article IEEE Systems Journal ; Volume 12, Issue 3 , 2018 , Pages 2782-2790 ; 19328184 (ISSN) Gheydi, M ; Nouri, A ; Ghadimi, N ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2018
    Abstract
    The main focus of this paper is to find an upgrade plan for a microgrid. This plan includes system lines' upgrades, the place, and size of the new capacitors and DERs. As usual, the planning process is begun with the load forecasting. The main objectives include minimization of system upgrade cost, loss cost, loss cost in peak load, and finally demand cost. The last objective is realized here using the tap changer of the main station transformer and reactive power support of the sources available or planned for the future of the grid. This is always referred to as the conservation of voltage reduction. In order to consider the effects of bus voltages on the system demand, the ZIP model for... 

    Identifying critical components for reliability centred maintenance management of deregulated power systems

    , Article IET Generation, Transmission and Distribution ; Volume 9, Issue 9 , 2015 , Pages 828-837 ; 17518687 (ISSN) Ghorani, R ; Fotuhi Firuzabad, M ; Dehghanian, P ; Li, W ; Sharif University of Technology
    Abstract
    Competition in the electric power industry urges utilities to not only reduce the investment costs, but also to reasonably cut the operation and maintenance expenses as much as possible, while keeping both power quality and reliability requirements met. Reliability-centred maintenance (RCM) has been proven to be in response to this dilemma in power systems and has been yet successfully applied in various engineering contexts. This study introduces a novel approach, as of the first steps of RCM implementation in composite power generation and transmission systems, to identify the critical components for the main sake of a more focused maintenance management. Criticality evaluation is, here,... 

    Economically based distributed battery energy storage systems planning in microgrids

    , Article 26th Iranian Conference on Electrical Engineering, ICEE 2018, 8 May 2018 through 10 May 2018 ; 2018 , Pages 1257-1263 ; 9781538649169 (ISBN) Habibifar, R ; Karimi, M. R ; Ranjbar, H ; Ehsan, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2018
    Abstract
    Nowadays, the energy storage systems (ESSs) are widely used in different level of power systems for dealing with the challenges caused by the integration of renewable energy sources (RESs). Among the ESSs, batteries are more suitable for being used in microgrids (MGs) at distribution level due to their special features. Therefore, this paper presents a novel approach for planning of distributed battery energy storage systems (BESSs) to enhance MGs operation, economically. The model is formulated as a mixed integer nonlinear programming problem (MINLP) and considers various types of BESSs. In order to verify the effectiveness of the proposed approach, it is applied to the IEEE 33-bus network... 

    Assessing operational flexibility of microgrids considering electrical and thermal energy resources

    , Article 2019 Smart Gird Conference, SGC 2019, 18 December 2019 through 19 December 2019 ; 2019 ; 9781728158945 (ISBN) Hadi, M. B ; Moeini Aghtaie, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2019
    Abstract
    With high growth rate of demand for energy in different societies, the need for energy resources has been increased significantly. This has resulted in introduction of new energy resources, i. e. renewable energy resources in generation sector of energy systems. However, the intrinsic features of these energy resources call for higher flexibility in different sectors of energy systems. Flexibility in a comprehensive sense tries to cover the amount of imbalance between production and demand in energy systems. This paper has attempted to introduce the concept of operational flexibility in microgrids and it also has presented a step-by-step algorithm to assess this operational index based on a... 

    Combined model of mass-transfer coefficients for clean and contaminated liquid-liquid systems

    , Article Industrial and Engineering Chemistry Research ; Volume 50, Issue 8 , 2011 , Pages 4608-4617 ; 08885885 (ISSN) Haghdoost, A ; Dehkordi, A. M ; Darbandi, M ; Shahalami, M ; Saien, J ; Sharif University of Technology
    Abstract
    Mass-transfer rates to and from drops in liquid-liquid extraction processes are often reduced by the presence of contaminants. To design an industrial extractor, it is essential to consider this contamination effect in a quantitative manner. To achieve this goal, an experimental investigation was conducted on the mass transfer into single drops for n-butanol-succinic acid-water, as the recommended test system by the European Federation of Chemical Engineering (EFCE). The effects of anionic (sodium dodecyl sulfate, SDS), cationic (dodecyl trimethyl ammonium chloride, DTMAC), and nonionic (octylphenol decaethylene glycol ether, Triton X-100) surfactants on the hydrodynamic and mass-transfer... 

    Optimal placement of PMUs to maintain network observability using a modified BPSO algorithm

    , Article International Journal of Electrical Power and Energy Systems ; Volume 33, Issue 1 , January , 2011 , Pages 28-34 ; 01420615 (ISSN) Hajian, M ; Ranjbar, A. M ; Amraee, T ; Mozafari, B ; Sharif University of Technology
    2011
    Abstract
    This paper presents a novel approach to optimal placement of Phasor Measurement Units (PMUs) for state estimation. At first, an optimal measurement set is determined to achieve full network observability during normal conditions, i.e. no PMU failure or transmission line outage. Then, in order to consider contingency conditions, the derived scheme in normal conditions is modified to maintain network observability after any PMU loss or a single transmission line outage. Observability analysis is carried out using topological observability rules. A new rule is added that can decrease the number of required PMUs for complete system observability. A modified Binary Particle Swarm Optimization... 

    Optimal placement of phasor measurement units: Particle swarm optimization approach

    , Article 2007 International Conference on Intelligent Systems Applications to Power Systems, ISAP ; 2007 ; 9860130868 (ISBN); 9789860130867 (ISBN) Hajian, M ; Ranjbar, A. M ; Amraee, T ; Shirani, A. R ; Sharif University of Technology
    2007
    Abstract
    This paper is concerned about the optimal placement of phasor measurement units (PMUs) so as to make a system completely observable. Observability assessment is done by the aid of the topological observability rules. Moreover a new rule is added which can decrease the number of required PMUs for complete system observability. A modified binary particle swarm is used as an optimization tool for obtaining the minimal number of PMUs and corresponding configuration. In order to improve the speed of convergence, an initial PMU placement is provided by graph-theoretic procedure. The simulation results of proposed approach are presented for several IEEE test systems  

    Optimal power flow solution by a modified particle swarm optimization algorithm

    , Article Proceedings of the Universities Power Engineering Conference, 1 September 2008 through 4 September 2008, Padova ; 2008 ; 9788889884096 (ISBN) Hajian Hoseinabadi, H ; Hosseini, H ; Hajian, M ; Sharif University of Technology
    2008
    Abstract
    This paper presents a modified particle swarm optimization (MPSO) algorithm for solving the optimal power flow (OPF) problems. The main distinction of this approach is in using particle's worth experience in stead of the best previous experience. The proposed approach is evaluated on the IEEE 30-bus test system which minimizes the total fuel cost considering operational constraints such as power flow equations, transmission flow limits, bus voltages and reactive power of generators. The results obtained using the proposed approach are compared with results of other optimization methods  

    Optimal allocation of spinning reserve in a restructured power system using particle swarm optimization

    , Article IEEE Canadian Conference on Electrical and Computer Engineering, CCECE 2008, Niagara Falls, ON, 4 May 2008 through 7 May 2008 ; 2008 , Pages 535-540 ; 08407789 (ISSN) ; 9781424416431 (ISBN) Hajian Hoseinabadi, H ; Fotubi Firuzabad, M ; Hajian, M ; Sharif University of Technology
    2008
    Abstract
    A reasonable amount of spinning reserve is essential to satisfy system security constraints when the power system encounters a contingency. Most ofthe methods previously developed for spinning reserve assessment ignore the probabilistic aspects of system components. This paper presents the design of a market for energy and spinning reserve services. This dispatching method has been developed to minimize the cost associated with theses services while maintaining the system security. Particle swarm optimization (PSO) is used for determining the global optimal solution for this dispatch problem. The effectiveness of the proposed approach is examined by application to the IEEE Reliability Test... 

    Locating and parameters setting of unified power flow controller for congestion management and improving the voltage profile

    , Article Asia-Pacific Power and Energy Engineering Conference, APPEEC, 28 March 2010 through 31 March 2010 ; March , 2010 ; 21574839 (ISSN) ; 9781424448135 (ISBN) Hashemzadeh, H ; Ehsan, M ; Sharif University of Technology
    2010
    Abstract
    This paper propose a particle swarm optimization based algorithm for locating Unified power flow controller (UPFC), as well as set its parameters, with static point of view in deregulated electricity markets in order to reduce generation cost, voltage violation and manage congestion. The modeling of UPFC has been adapted based on power injection method. In order to verify and validate the effectiveness of the proposed method, it was applied to 24-bus Reliability Test System (RTS) and the results have been discussed  

    Locating series FACTS devices using line outage sensitivity factors and particle swarm optimization for congestion management

    , Article 2009 IEEE Power and Energy Society General Meeting, PES '09, 26 July 2009 through 30 July 2009, Calgary, AB ; 2009 ; 9781424442416 (ISBN) Hashemzadeh, H ; Hosseini, S. H ; Sharif University of Technology
    Abstract
    This paper proposes a particle swarm optimization based algorithm for locating series FACTS devices in deregulated electricity markets in order to reduce and manage congestion. Line outage sensitivity factors are used to reduce the solution space and to pinpoint the lines which are more suitable for FACTS device placement. Total congestion cost and total generation cost are the two objective functions that are employed in the optimization process. In order to verify and validate the effectiveness of the proposed method, it was applied to IEEE 14-bus and IEEE 57-bus test systems. The results obtained by the proposed method were compared with those of congestion rent contribution method