Loading...
Search for: test-systems
0.011 seconds
Total 100 records

    Impacts of service quality regulation on distribution automation investment

    , Article 2010 IEEE International Energy Conference and Exhibition, EnergyCon 2010, 18 December 2010 through 22 December 2010 ; December , 2010 , Pages 373-378 ; 9781424493807 (ISBN) Modarresi, M. S ; Fotuhi Firuzabad, M ; Mohammadnezhad Shourkaei, H ; Sharif University of Technology
    2010
    Abstract
    This paper investigates the effects of service quality regulation on investing in distribution automation. Among different regulatory instruments for quality regulation, the Reward-Penalty Scheme (RPS) has been selected to evaluate the effect of monetary incentive on behavior of Electric Distribution Utility (EDU) for service reliability. By implementing different automation strategies, the value of enhancing reliability indices and consequently the value of rewards and penalties are calculated for each strategy. For achieving to more realistic outcome, ten years horizon is considered. Furthermore, in the calculation of reliability indices, the time varying failure rate of components is... 

    Distributed generation placement for congestion management considering economic and financial issues

    , Article Electrical Engineering ; Volume 92, Issue 6 , November , 2010 , Pages 193-201 ; 09487921 (ISSN) Afkousi Paqaleh, M ; Abbaspour Tehrani Fard, A ; Rashidinejad, M ; Sharif University of Technology
    2010
    Abstract
    Congestion management is one of the most important functions of independent system operator (ISO) in the restructured power system. This paper presents two new methodologies for optimal sitting and sizing of distributed generations (DGs) in the restructured power systems for congestion management. The proposed methodologies are based upon locational marginal price (LMP) and congestion rent that forms a priority list of candidate buses to reduce the solution space. The proposed priority list facilitates the optimal placement as well as the level of output power of DGs. The proposed methods are implemented on the IEEE 14-bus and IEEE 57-bus test systems to illustrate their effectiveness. An... 

    UPFC for enhancing power system reliability

    , Article IEEE Transactions on Power Delivery ; Volume 25, Issue 4 , 2010 , Pages 2881-2890 ; 08858977 (ISSN) Rajabi Ghahnavieh, A ; Fotuhi Firuzabad, M ; Shahidehpour, M ; Feuillet, R ; Sharif University of Technology
    2010
    Abstract
    This paper discusses various aspects of unified power flow controller (UPFC) control modes and settings and evaluates their impacts on the power system reliability. UPFC is the most versatile flexible ac transmission system device ever applied to improve the power system operation and delivery. It can control various power system parameters, such as bus voltages and line flows. The impact of UPFC control modes and settings on the power system reliability has not been addressed sufficiently yet. A power injection model is used to represent UPFC and a comprehensive method is proposed to select the optimal UPFC control mode and settings. The proposed method applies the results of a contingency... 

    Reliability-constrained unit commitment using stochastic mixed-integer programming

    , Article 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2010, 14 June 2010 through 17 June 2010 ; June , 2010 , Pages 200-205 ; 9781424457236 (ISBN) Parvania, M ; Fotuhi Firuzabad, M ; Aminifar, F ; Abiri Jahromi, A ; Sharif University of Technology
    2010
    Abstract
    This paper proposes a stochastic mixed-integer programming (SMIP) model for the reliability-constrained unit commitment (RCUC) problem. The major objective of the paper is to examine both features of accuracy and efficiency of the proposed SMIP model of RCUC. The spinning reserve of generating units is considered as the only available reserve provision resource; however, the proposed formulation can be readily extended to comprise the other kind of reserve facilities. Expected load not served (ELNS) and loss of load probability (LOLP) are accommodated as the reliability constraints. Binding either or both reliability indices ensures the security of operation incorporating the stochastic... 

    Stochastic unit commitment of wind farms integrated in power system

    , Article Electric Power Systems Research ; Volume 80, Issue 9 , Jan , 2010 , Pages 1006-1017 ; 03787796 (ISSN) Siahkali, H ; Vakilian, M ; Sharif University of Technology
    2010
    Abstract
    Integration of wind power generation creates new concerns for operation engineers in a power system. Unlike conventional power generation sources, wind power generators supply intermittent power due to uncertainty in parameters of wind such as its velocity. This paper presents probabilistic model for load and wind power uncertainty which can be used in operation planning (with durations up to one or two years). A stochastic model is proposed to simulate the status of units that are directly affected by the load and wind power generation uncertainties. This paper develops a solution method for generation scheduling of power system, while taking into account the stochastic behavior of the load... 

    Locating and parameters setting of unified power flow controller for congestion management and improving the voltage profile

    , Article Asia-Pacific Power and Energy Engineering Conference, APPEEC, 28 March 2010 through 31 March 2010 ; March , 2010 ; 21574839 (ISSN) ; 9781424448135 (ISBN) Hashemzadeh, H ; Ehsan, M ; Sharif University of Technology
    2010
    Abstract
    This paper propose a particle swarm optimization based algorithm for locating Unified power flow controller (UPFC), as well as set its parameters, with static point of view in deregulated electricity markets in order to reduce generation cost, voltage violation and manage congestion. The modeling of UPFC has been adapted based on power injection method. In order to verify and validate the effectiveness of the proposed method, it was applied to 24-bus Reliability Test System (RTS) and the results have been discussed  

    Transmission congestion management using distributed generation considering load uncertainty

    , Article Asia-Pacific Power and Energy Engineering Conference, APPEEC, 28 March 2010 through 31 March 2010 ; March , 2010 ; 21574839 (ISSN) ; 9781424448135 (ISBN) Afkousi Paqaleh, M ; Noory, A. R ; Abbaspour T. F., A ; Rashidinejad, M ; Sharif University of Technology
    2010
    Abstract
    This Paper presents a model for optimal locating and sizing of Distributed Generation (DG) for congestion management in deregulated electricity market. For reducing the solution space a priority list of candidate buses is formed and then optimal placement and sizing of DG in potential buses is discussed. In order to incorporate stochastic nature of power system in this study, Monte-Carlo method is used to simulate the effect of uncertainty of loads and system on the optimal location and size of the DGs in the network. The proposed method is applied to IEEE Reliability Test System (RTS). The impacts of load uncertainty on optimum DG size and location are studied  

    Demand response scheduling by stochastic SCUC

    , Article IEEE Transactions on Smart Grid ; Volume 1, Issue 1 , May , 2010 , Pages 89-98 ; 19493053 (ISSN) Parvania, M ; Fotuhi Firuzabad, M ; Sharif University of Technology
    2010
    Abstract
    Considerable developments in the real-time telemetry of demand-side systems allow independent system operators (ISOs) to use reserves provided by demand response (DR) in ancillary service markets. Currently, many ISOs have designed programs to utilize the reserve provided by DR in electricity markets. This paper presents a stochastic model to schedule reserves provided by DR in the wholesale electricity markets. Demand-side reserve is supplied by demand response providers (DRPs), which have the responsibility of aggregating and managing customer responses. A mixed-integer representation of reserve provided by DRPs and its associated cost function are used in the proposed stochastic model.... 

    Transmission constrained energy and reserve dispatch by harmony search algorithm

    , Article 2009 IEEE Power and Energy Society General Meeting, PES '09, 26 July 2009 through 30 July 2009, Calgary, AB ; 2009 ; 9781424442416 (ISBN) Afkousi Paqaleh, M ; Hosseini, S. H ; Sharif University of Technology
    IEEE  2009
    Abstract
    Spinning reserve (SR) is one of the most important ancillary services which are needed for satisfying reliability requirements, including the desired level of security in power systems. By definition, spinning reserve is the unloaded section of synchronized generation that is able to respond immediately to serve load. This paper proposes a hybrid DCOPF and harmony search (HS) optimization method as a novel heuristic approach to the joint dispatch of energy and reserve considering the bottling of reserve due to transmission limits. The effectiveness of the proposed method is examined by applying it to the IEEE 30-bus test system. The results obtained using the proposed method are presented... 

    A multi-objective framework for transmission expansion planning in deregulated environments

    , Article IEEE Transactions on Power Systems ; Volume 24, Issue 2 , 2009 , Pages 1051-1061 ; 08858950 (ISSN) Maghouli, P ; Hosseini, H ; Oloomi Buygi, M ; Shahidehpour, M ; Sharif University of Technology
    2009
    Abstract
    Deregulation of power system has introduced new objectives and requirements for transmission expansion problem. In this paper, a static transmission expansion methodology is presented using a multi-objective optimization framework. Investment cost, reliability (both adequacy and security), and congestion cost are considered in the optimization as three objectives. To overcome the difficulties in solving the nonconvex and mixed integer nature of the optimization problems, the genetic based NSGA II algorithm is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system to show the... 

    A global Particle Swarm-Based-Simulated Annealing Optimization technique for under-voltage load shedding problem

    , Article Applied Soft Computing Journal ; Volume 9, Issue 2 , 2009 , Pages 652-657 ; 15684946 (ISSN) Sadati, N ; Amraee, T ; Ranjbar, A. M ; Sharif University of Technology
    2009
    Abstract
    In this paper, a new approach based on hybrid Particle Swarm-Based-Simulated Annealing Optimization technique (PSO-B-SA) is proposed for solving under-voltage load shedding (UVLS) problem. Under-voltage load shedding (UVLS) is one of the most important tools for avoiding voltage instability. In this paper, the UVLS problem is formulated based on the concept of the static voltage stability margin and its sensitivity at the maximum loading point or the collapse point. The voltage stability criterion is modeled directly into the load-shedding scheme. In any UVLS scheme finding the global point is very important for having cost effective economy. The proposed PSO-B-SA methodology is implemented... 

    Reliability-based selection of wind turbines for large-scale wind farms

    , Article World Academy of Science, Engineering and Technology ; Volume 37 , 2009 , Pages 734-740 ; 2010376X (ISSN) Fotuhi Firuzabad, M ; Salehi Dobakhshari, A ; Sharif University of Technology
    2009
    Abstract
    This paper presents a reliability-based approach to select appropriate wind turbine types for a wind farm considering site-specific wind speed patterns. An actual wind farm in the northern region of Iran with the wind speed registration of one year is studied in this paper. An analytic approach based on total probability theorem is utilized in this paper to model the probabilistic behavior of both turbines' availability and wind speed. Well-known probabilistic reliability indices such as loss of load expectation (LOLE), expected energy not supplied (EENS) and incremental peak load carrying capability (IPLCC) for wind power integration in the Roy Billinton Test System (RBTS) are examined. The... 

    Optimal DG placement in distribution systems using cost/worth analysis

    , Article World Academy of Science, Engineering and Technology ; Volume 37 , 2009 , Pages 746-753 ; 2010376X (ISSN) Ahmadigorji, M ; Abbaspour, A ; Rajabi Ghahnavieh, A ; Fotuhi Firuzabad, M ; Sharif University of Technology
    2009
    Abstract
    DG application has received increasing attention during recent years. The impact of DG on various aspects of distribution system operation, such as reliability and energy loss, depend highly on DG location in distribution feeder. Optimal DG placement is an important subject which has not been fully discussed yet. This paper presents an optimization method to determine optimal DG placement, based on a cost/worth analysis approach. This method considers technical and economical factors such as energy loss, load point reliability indices and DG costs, and particularly, portability of DG. The proposed method is applied to a test system and the impacts of different parameters such as load growth... 

    A low-cost on-line monitoring mechanism for the flexray communication protocol

    , Article Proceedings - 2009 4th Latin-American Symposium on Dependable Computing, LADC 2009, 1 September 2009 through 4 September 2009, Joao Pessoa ; 2009 , Pages 111-118 ; 9780769537603 (ISBN) Sedaghat, Y ; Miremadi, G ; Sharif University of Technology
    2009
    Abstract
    Nowadays, communication protocols are used in safety-critical automotive applications. In these applications, fault tolerance is a main requirement and the existence of single points of failure is a serious threat to system failures. Among the communication protocols, FlexRay is expected to become the communication backbone for future automotive systems. In this paper, we identify single points of failure in the FlexRay protocol by injecting a total of 135,600 single-bit transient faults into all accessible registers of the FlexRay communication controller. The results showed that about 1.2% of all injected faults caused the controller to freeze immediately. Based on these results and... 

    An efficient mixed-integer linear formulation for long-term overhead lines maintenance scheduling in power distribution systems

    , Article IEEE Transactions on Power Delivery ; Volume 24, Issue 4 , 2009 , Pages 2043-2053 ; 08858977 (ISSN) Abiri Jahromi, A ; Fotuhi Firuzabad, M ; Abbasi, E ; Sharif University of Technology
    2009
    Abstract
    This paper presents an efficient mixed-integer linear formulation for long term maintenance schedule of overhead lines. The proposed formulation is based on risk management approach and utilizes the model of decoupled risk factors. The proposed methodology yields a significant computational saving comparing to the previously reported dynamic programming. Risk management approach enables the asset managers to consider the actual condition of electrical equipment and expected consequence of their failures. Furthermore, the decoupled risk strategy in conjunction with the mixed-integer linear programming formulation establishes a precise description of time-dependent deterioration failure rate... 

    Impacts of automatic control systems of loop restoration scheme on the distribution system reliability

    , Article IET Generation, Transmission and Distribution ; Volume 3, Issue 10 , 2009 , Pages 891-902 ; 17518687 (ISSN) Kazemi, S ; Fotuhi Firuzabad, M ; Sanaye Pasand, M ; Lehtonen, M ; Sharif University of Technology
    2009
    Abstract
    Loop restoration scheme (LRS) is a special feeder automation (FA) scheme, which is used by utilities to improve distribution system reliability. The LRS is controlled and managed by its automatic control system (ACS). The impacts on distribution system reliability indices of implementing LRS mainly depend on the type of its ACS. Two common types of ACS of LRS are presented and used in this study. Successful operation of ACS is dependent on the protection and automatic control functions of switching devices of LRS. Different failure modes of these switching devices can therefore affect the procedure of ACS in fault detecting, isolating and service restoration. The impacts of failure of... 

    Electricity generation scheduling with large-scale wind farms using particle swarm optimization

    , Article Electric Power Systems Research ; Volume 79, Issue 5 , 2009 , Pages 826-836 ; 03787796 (ISSN) Siahkali, H ; Vakilian, M ; Sharif University of Technology
    2009
    Abstract
    Large-scale integration of wind power in the electricity system presents some planning and operational difficulties, which are mainly due to the intermittent and difficult nature of wind prediction process. Therefore it is considered as an unreliable energy source. This paper presents a new approach for solving the generation scheduling (GS) problem. It will consider the reserve requirement, load balance and wind power availability constraints. The particle swarm optimization (PSO) method is suggested to deal with the equality and inequality constraints in the GS problem. The proposed PSO is applied to a 12-unit test system (including 10 conventional thermal generating units and 2 wind... 

    A simple three-phase model for distributed static series compensator (DSSC) in Newton power flow

    , Article 2009 Asia-Pacific Power and Energy Engineering Conference, APPEEC 2009, Wuhan, 27 March 2009 through 31 March 2009 ; 2009 ; 21574839 (ISSN); 9781424424870 (ISBN) Jalayer, R ; Mokhtari, H ; Wuhan University; IEEE Power and Energy Society; Chinese Society for Electrical Engineering; Scientific Research Publishing ; Sharif University of Technology
    2009
    Abstract
    Load flow problems have always been an important issue in power system analysis and require proper modeling of system components. In this regard Flexible AC Transmission System (FACTS) controllers are modern devices that their modeling specially the series type is a challenging topic. This paper describes a three-phase model for Distributed Static Series Compensator (DSSC) based on extending the Static Synchronous Series Compensator (SSSC) model in Newton power flow. To extend the SSSC model the following two differences must be considered; three completely independent phases and the existence of several modules in a DSSC system. Simulation results on the IEEE 30-bus system and a five bus... 

    Evaluation of UPFC impacts on power system reliability

    , Article Transmission and Distribution Exposition Conference: 2008 IEEE PES Powering Toward the Future, PIMS 2008, Chicago, IL, 21 April 2008 through 24 April 2008 ; May , 2008 ; 9781424419036 (ISBN) Rajabi Ghahnavieh, A ; Fotuhi Firuzabad, M ; Feuillet, R ; Sharif University of Technology
    2008
    Abstract
    This paper evaluates the reliability impact of UPFC application in power system. The paper proposes a new reliability model for the UPFC which is capable of considering different operating states of UPFC. The model is then applied to a test system to study the reliability impacts of UPFC. The impacts of operating points of different states of the model on the system reliability are analyzed. The role of model parameters in reliability impacts of UPFC is analyzed through the sensitivity analysis. A comparative study is finally conducted to illustrate the applicability of the proposed model compare to that of existing UPFC reliability models. The abilities and deficiencies of the proposed... 

    Optimal power flow solution by a modified particle swarm optimization algorithm

    , Article Proceedings of the Universities Power Engineering Conference, 1 September 2008 through 4 September 2008, Padova ; 2008 ; 9788889884096 (ISBN) Hajian Hoseinabadi, H ; Hosseini, H ; Hajian, M ; Sharif University of Technology
    2008
    Abstract
    This paper presents a modified particle swarm optimization (MPSO) algorithm for solving the optimal power flow (OPF) problems. The main distinction of this approach is in using particle's worth experience in stead of the best previous experience. The proposed approach is evaluated on the IEEE 30-bus test system which minimizes the total fuel cost considering operational constraints such as power flow equations, transmission flow limits, bus voltages and reactive power of generators. The results obtained using the proposed approach are compared with results of other optimization methods