Loading...
Search for: aditya--parida
0.044 seconds

    Performance Measurement (PM)for Maintenance Process of Iranian Passenger Railway System

    , M.Sc. Thesis Sharif University of Technology Ali-Solaymani, Alireza (Author) ; Parida, Aditya (Supervisor)
    Abstract
    Performance measurement and its information enable managers for better control and management of their processes. Since, rolling stock maintenance process is a dominant supporting process, which plays a key role in the reliability, safety and quality of service delivery in railway passenger transportation, this thesis is aimed to study the performance measurement of rolling stock maintenance process. The scope of this research work is to study the concept and state-of-the-art of measuring performance with specific reference to maintenance; to study and discuss relevant issues and challenges; to study and analyze current practices in maintenance process of Iranian passenger railway system... 

    Computerized Maintenance Management System for Cement Plants (CMMS)

    , M.Sc. Thesis Sharif University of Technology Marvasti, Ehsan; Pourhosseinali, Mohammad (Author) ; Aditya, Parida (Supervisor)
    Abstract
    This project is providing appropriate software which could manage maintenance activities in a plant. All sections of the software have been designed in a way that can ease the management of maintenance activities. There are about 100 forms in the software that have been designed according to the forms which are being used in some Iranian cement plants and other maintenance software and also what we recognized important to be added or designed. One of the most important aspect of this software is the analytical section of the software where the user can get analytical reports from the software and based on the reports judge about the status of the plant and make new decisions in order to... 

    Implementaion of 5S in Zarin Iran Porcelain Industries

    , M.Sc. Thesis Sharif University of Technology Farrokhi, Mohammadreza; Ghassai, Ali (Author) ; Parida, Aditiya (Supervisor)
    Abstract
    This project shows the flow of implementing a 5s Program into a factory. From it’s first step by studying current situation until the last step implementing and monitoring the results. Manufacturing companies have a growing, market-driven need to adopt World Class operating technologies, including lean manufacturing 5S principles. Understanding the program's importance and knowing how to get started are the most important steps. In Iranian economic environment it is always hard to convince any top management to invest on methodologies like TPM. The reason behind this is that there are very few examples of companies with successful implementation of these methodologies. Since management...