    Multi-Echelon Mixed-loop Supply Chain Network Design under Disruption Conditions

    , M.Sc. Thesis Sharif University of Technology Beheshti, Saeed (Author) ; Haji, Rasoul (Supervisor) ; Haji, Alireza (Supervisor)
    Abstract
    Fulfilling the demands of customers, used to be the main purpose of Supply Chain Network Designers. Soon after that, the environmental concerns created the concept of Reverse Logistic in order to prevent goods from being scattered in the environment after their disposal. Governmental regulations and people's concerns, forced the factories to gather the created pollutions of the environment. They gradualy confessed the positive impacts of these ruturns on their financials. The flow of forward and reverse logistics establishes a Closed-Loop in which the returning economical circumstances were transferd into original factories. Later, Open-Loops were created. In open-loops the returns have to... 

    Economic Batch Quantity (EBQ) for a Single-Stage Production System with Rework and Scrapping

    , M.Sc. Thesis Sharif University of Technology Rahmani, Vasim (Author) ; Haji, Rasoul (Supervisor)
    Abstract
    The classical economic batch quantity (EBQ) model assumes that all produced items have a perfect quality. But in real-life production systems, generation of defective items is inevitable. A portion of these defective items is considered to be scrap , while the other is assumed to be reworkable and reworking them can reduce costs and increase productivity. In this thesis we have studied the economic batch quantity for a single stage production system with rework and scrapping . We want to satisfy the customer demand and minimize total costs of the system like set up costs , production costs , rework costs , holding costs , shortage costs and scrapping costs . In the first chapter of this... 

    Systematic Planned (Preventive) Maintenance in Hospitals And Medical Centers of Iran

    , M.Sc. Thesis Sharif University of Technology Faghihi, Farshid (Author) ; Haji, Rasoul (Supervisor)
    Abstract
    Based on the latest statistical figures, more than 50 billion Rials worth of medical equipment exists in Iran’s medical centers. In spite of this, Breakdown maintenance is used in all hospitals, which means that the equipment is utilized as long as it is not out of order and only in such a situation, i.e. a breakdown, the necessary repair operation is conducted on the equipment. In fact, no maintenance is carried out to prevent a breakdown, while the “prevention from breakdown” concept has long been introduced in the majority of industries in many countries including Iran and its positive impacts are undisputable. This thesis aims at proposing a solution for the implementation of a “planned... 

    “Determination of Economic Order and Production Quantity in Inventory System Regarding the Quality of Items”

    , M.Sc. Thesis Sharif University of Technology Torabi, Hassan (Author) ; Haji, Rasoul (Supervisor)
    Abstract
    EOQ and EPQ models have been among the most important and commonly used techniques for about 100 and 60 years respectively .But, they are involved in some assumptions that sometimes prevent them from being implemented in real situation of industry and production. One of these unrealistic assumptions is that all of items received or produced are of perfect quality. In order to overcome this constraint and make the mentioned models closer to the real environmentsome researches have been done. To this end,following the previous attemptsin this project we assumed to have destructive inspections and existence of imperfect and rejected items after rework. In our models, considering 3 circumstances... 

    Transportation Problem of Hub Network with Direct Links

    , M.Sc. Thesis Sharif University of Technology Shakeri, Hamed (Author) ; Haji, Rasoul (Supervisor)
    Abstract
    Hub and Spoke networks come into play when considering direct link between all origins and destinations is either impossible or expensive in a transportation system. In this kind of problems, some nodes are chosen as hub from all origin and destination nodes to collect flows and then distribute them. Implementing hub network leads to minimizing transportation cost, sorting flows and conveying them in economies of scale. Otherwise, shipping flows directly may cause decreasing the travelling distance and the delivery time consequently. In this dissertation, combination of hub network and direct shipment is investigated. To obtain the optimal hub locations and direct links between non-hub nodes... 

    Developing Inventory Control Policies with No Ordering Costs in Two-Echelon Supply Chains

    , Ph.D. Dissertation Sharif University of Technology Tayebi, Hamed (Author) ; Haji, Rasoul (Supervisor)
    Abstract
    This dissertation attempts to develop four inventory control models for two-echelon supply chains. For the all models, the retailers face Poisson demand and lost sales during a stockout. There is also a time-dependent holding cost and a cost per unit of lost sales. However, there is no (or negligible) cost associated with placing an order.
    For the first model, we consider a two-echelon inventory system with one central warehouse and a number of retailers. The central warehouse applies (R, Q) policy and retailers apply base stock policy. In this model, we approximate the arrival process of the central warehouse and obtain the total cost of the system, as well as the optimal solution.... 

    Multi-Objective Production Planning and Job Shop Scheduling

    , M.Sc. Thesis Sharif University of Technology Rabiee, Marzie (Author) ; Haji, Rasoul (Supervisor)
    Abstract
    Production scheduling is such a key issue that directly influences on the performance of the machines and efficiency of production line. This category of problems is to find simultaneously the lot sizes and their sequence over a finite set of planning periods.
    In this Thesis a multi objective production planning and job shop scheduling problem is investigated. The objectives are minimization of the production cost and minimization of production time smoothness in consecutive periods. As the problem is shown to be NP-hard, two multi-objectives genetic algorithms with two approaches in selection of parents and crowding distance index are proposed to solve this problem. In these two meta... 

    Optimum Ordering Policy in Vendor Managed Inventory (VMI) with Discrete Demand and Backorder

    , M.Sc. Thesis Sharif University of Technology Mofidi, Shahab (Author) ; Haji, Rasoul (Supervisor)
    Abstract
    This research deals with a supply chain consisting of one vendor and several retailers. Every retailer orders a fixed discrete quantity in fixed discrete time intervals. Order quantity and order cycle of each retailer could be different from the others. The vendor orders the required quantity to a supplier to fulfill the received demands. Also the vendor orders a discrete quantity, which will be immediately received at the vendor’s warehouse. In this supply chain system, the lead-time is assumed to be zero and shortage is allowed for vendor. The aim is to find minimum vendor’s inventory cost. We proposed a backward Dynamic Programming algorithm for the model. The algorithm creates vendor’s... 

    Inventory Control Dynamic Models in Decentralized Supply Chain with Coordination

    , Ph.D. Dissertation Sharif University of Technology Afzalabadi, Maryam (Author) ; Haji, Alireza (Supervisor) ; Haji, Rasoul (Co-Advisor)
    Abstract
    Although inventory control under discrete demand in dynamic quantities and time intervals are very common in reality, existing literature has largely ignored them. In this thesis, we investigate the inventory control decisions in a two echelon supply chain. The vendor supplies a product to several retailers, buying discrete quantities in pre-determined time intervals. The order quantity and order cycles for each retailer can be different from others. We have developed a new efficient algorithm to find the optimal ordering policy involves the scheduling and the order quantity of vendor to his supplier to minimize his cost function in infinite time horizon. Moreover, we have designed a revenue... 

    Analysis of a Two-Echelon Inventory Model with Lost Sales and Stochastic Demand using Continuous-Time Markov Chain

    , M.Sc. Thesis Sharif University of Technology Vasheghani Farahani, Iman (Author) ; Haji, Rasoul (Supervisor)
    Abstract
    In this paper, we studied a two-echelon inventory system which consists of one central warehouse and one retailer. All installations follow base stock inventory management policy. The customers arrive at retailer according to Poisson distribution. The demand is satisfied when both central warehouse and retailer have positive on-hand inventory. Otherwise, the demand is lost. The lead time of central warehouse and the time needed to replenish orders of retailer are assumed to be exponentially distributed. The purpose of this study is to minimize the expected long-run total cost of the system per unit time. Total cost of the system includes holding costs of central warehouse and retailer, cost... 

    Deriving the Cost Function and Optimal Boundaries for a Two-level Inventory System with Information Sharing and Identical Retailers

    , M.Sc. Thesis Sharif University of Technology Afshar Sedigh, Amir Hosein (Author) ; Haji, Rasoul (Supervisor)
    Abstract
    In this study we consider a two-level supply chain, with a supplier and a number of identical retailers, demand process is Poisson with random rate. All retailers apply (R,Q) policy with backorder case for their inventory control supplier fulfills the orders of retailers according to FIFO discipline. At any point of time the supplier has online information about inventory position of all retailers.
    Whenever the inventory position of a retailer reaches to a fixed value (s) above its reorder point, the supplier orders a batch of size Q to an outside source with infinite capacity. Lead-time of each retailer is equal to the sum of a constant transportation time and a delay time which is... 

    Agent Based Modeling of Housing Market

    , M.Sc. Thesis Sharif University of Technology Mazhari Kadijani, Nahid (Author) ; Ramezanian, Rasoul (Supervisor) ; Haji Mirsadeghi, Mir Omid (Co-Advisor)
    Abstract
    Housing is one of the important staple goods. The main different between housing market and the other markets is limitation of stock at short term. So it is very important to regularize housing market for apropos accountability and according to society consumption demand. This document introduce the result of an agent based modeling of housing market. There are agents that find out the maximum utility for choosing one of following house related conditions: purchase, sale and lease agreement. In fact in this model people have two phases. The effect of land value taxation for regularization of housing market will analyses with this model. Its seems that by implementation of mentioned tax, the... 

    Optimal Batch Production for a Single Machine System with Rework

    , M.Sc. Thesis Sharif University of Technology Haji, Babak (Author) ; Haji, Ali Reza (Supervisor)
    Abstract
    This research attempts to develop the optimal solution for an inventory problem consisting of a single machine which produces items some of which may be defective. We assume that no shortages are allowed and all defective items are to be reworked. Setup cost for rework and waiting time of defectives are considered. This research consists of two different parts. In the first part we consider two different policies where in the first policy in each cycle after the regular production the machine is setup for the rework of defectives of the same cycle. In the second policy several cycles constitute a period. All the defectives produced in the period are reworked in the last cycle of that period.... 

    Optimal batch production with rework and non-zero setup cost for rework

    , Article 2009 International Conference on Computers and Industrial Engineering, 6 July 2009 through 9 July 2009 ; 2009 , Pages 857-862 ; 9781424441365 (ISBN) Haji, B ; Haji, R ; Haji, A ; Sharif University of Technology
    2009
    Abstract
    This paper attempts to develop the optimal solution for an inventoryproblem consisting of a single machine which produces items some of which may bedefective. We assume that no shortages are allowed and all defective items areto be reworked. Setup cost for rework and waiting time of defectives areconsidered. We consider two different policies where in the first policy in eachcycle after the regular production the machine is setup for the rework ofdefectives of the same cycle. In the second policy several cycles constitute aperiod. All the defectives produced in the period are reworked in the last cycleof that period. At the end of the rework cycle the whole process starts allover again. One... 

    One-for-one period policy in a two-echelon inventory system with commoncycle and poisson demand rate for retailers

    , Article 2009 International Conference on Computers and Industrial Engineering, CIE 2009 ; 2009 , Pages 831-834 ; 9781424441365 (ISBN) Haji, R ; Tayebi, H ; Haji, B ; Sharif University of Technology
    2009
    Abstract
    This paper deals with a two-echelon inventory system consisting of onesupplier and N retailers. Each retailer faces an independent Poisson demand withthe same rate and applies a new ordering policy called one-for-one- periodordering policy for its inventory control. In this ordering policy the ordersize is equal to one and the time interval between any two consecutive ordersforms a common fixed cycle. Thus, the supplier faces a deterministic demand andadopts a deterministic inventory policy. At each cycle he orders a batch of sizeN to his own supplier. Upon receipt of each batch he sends 1 unit of theproduct to each retailer with a transportation cost. In this paper, for theabove system we... 

    Revenue sharing contract for a VMI with one for one period policy

    , Article Cogent Engineering ; Volume 5, Issue 1 , 2018 , Pages 1-19 ; 23311916 (ISSN) Haji, A ; Afzalabadi, M ; Haji, R ; Sharif University of Technology
    Cogent OA  2018
    Abstract
    In this article, we design a revenue-sharing contract to coordinate inventory control decisions in a serial supply chain consisting of one supplier, one vendor, and one retailer. We assume that the retailer faces Poisson demand and his unsatisfied demands will be lost. The retailer applies one-for-one period policy in which he constantly places an order for one unit of product to the vendor in a predetermined time interval which results in a deterministic demand for the vendor. Vendor orders the required quantity from supplier which will be immediately received at the vendor’s warehouse. Solution procedures are developed to find the equilibrium in the vendor managed inventory program with a... 

    Pricing and inventory decisions in a vendor managed inventory system with revenue sharing contract

    , Article Uncertain Supply Chain Management ; Volume 6, Issue 3 , 2018 , Pages 299-320 ; 22916822 (ISSN) Haji, A ; Afzalabadi, M ; Haji, R ; Sharif University of Technology
    Growing Science  2018
    Abstract
    In this paper, we design a revenue sharing contract to coordinate pricing and inventory control decisions in a serial supply chain consisting of one supplier, one manufacturer and one retailer. We assume that the retailer faces Poisson demand and his unsatisfied demands will be lost. The retailer applies one-for-one period policy in which he constantly places an order for one unit of product to the manufacturer in a predetermined time interval which results in a deterministic demand for the manufacturer. Solution procedures are developed to find the equilibrium in the Vendor Managed Inventory (VMI) program with a revenue sharing contract, in which no party is willing to deviate from for the... 

    Developing a partial backlogging deteriorating inventory model with selling price dependant demand rate and cycle length dependant selling price

    , Article 2008 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2008, Singapore, 8 December 2008 through 11 December 2008 ; January , 2008 , Pages 198-202 ; 9781424426300 (ISBN) Haji, A ; Sabahno, H ; Haji, R ; Sharif University of Technology
    2008
    Abstract
    In this paper, we develop an inventory model with price dependant demand rate, under time value of money and inflation, finite time horizon, exponential backlogging rate and exponential deterioration rate with the objective of maximizing the present worth of the total system profit. Using a dynamic programming based solution algorithm, we are able to find the optimal sequence of the cycles and also to obtain different optimal selling prices and optimal order quantities for the cycles with unequal lengths, which have never been done before for our model. We also use a proper numerical example to show accuracy of the solution procedure. © 2008 IEEE  

    One-for-one period policy and a series of suppliers

    , Article 2009 International Conference on Computers and Industrial Engineering, CIE 2009, 6 July 2009 through 9 July 2009, Troyes ; 2009 , Pages 902-906 ; 9781424441365 (ISBN) Haji, R ; Pirayesh Neghab, M ; Haji, A ; Sharif University of Technology
    2009
    Abstract
    The purpose of this paper is to adopt and analyze a new ordering policycalled one-for-one-period policy in a multi-echelon supply chain consisting ofone retailer and a series of TV suppliers. The main advantage of adopting theone-for-one-period (7,7) ordering policy for retailers is the elimination ofuncertainty for supplier which leads to total elimination of the safety stocksat all suppliers. This in turn leads to the reduction of the total system costsand in case any supplier's ordering cost is negligible it can even eliminate theneed for him to carry any inventory. In addition to this advantage, thenumerical results show that the application of this new policy for the retailerleads to... 

    Optimal batch production with minimum rework cycles and constraint on accumulated defective units

    , Article 2009 IEEE/INFORMS International Conference on Service Operations, Logistics and Informatics, SOLI 2009, Chicago, IL, 22 July 2009 through 24 July 2009 ; 2009 , Pages 633-638 ; 9781424435418 (ISBN) Haji, B ; Haji, A. R ; Haji, R ; Sharif University of Technology
    2009
    Abstract
    This paper deals with the issue of economic batch quantity (EBQ) in a single machine system in which defective items are produced in each cycle of production. The accumulated defective items produced in a period, consisting of several equal cycles, are all reworked in the last cycle of this period called the rework cycle. At the end of each period the whole process will start all over again. We assume that there is a limitation on the total defective items. We also do not adopt the restriction that the rework process rate be equal to the normal production rate. In addition we assume that there is a set up time for rework process. Further we assume that the number of rework cycles be as small...