Loading...
Search for:
haji-bagheri--majid
0.163 seconds
Total 1101 records
Synthesis and Characterization of Graphene/Tin (IV) Sulfide (SnS₂) Hybrid Nanostructures as Anode Material for Ionic Batteries
, M.Sc. Thesis Sharif University of Technology ; Esfandiar, Ali (Supervisor)
Abstract
In the current century, an energy storage is one of the critical and important factors affecting on human life. Rechargeable batteries, specially Lithium ion batteries (LIBs), can be considered as ideal energy storage devices including various advantages e.g. high energy and power densities. In this work, Tin IV sulfide (SnS2) and its composites, making by conductive materials e.g. Reduced Graphene Oxide (SnS2@rGO), are prepared during two different synthesis methods consisting of Hydrothermal and Hot-bath, and their properties are investigated as anode material in LIB. The structural and electrochemical analyses demonstrated that the composite sample prepared by hot-bath method exhibited...
Mechanical Behavior of Recycled Polyethylene Terephthalate/Polycarbonate/Glass Fiber Composites
, M.Sc. Thesis Sharif University of Technology ; Bagheri, Reza (Supervisor)
Abstract
Nowadays, with the increasing number of polyethylene terephthalate wastes, the issue of its recycling has become very important. Among the problems of polyethylene terephthalate recycling are its loss of crystallinity and mechanical properties. Recycled polyethylene terephthalate does not have the properties of new polyethylene terephthalate and using its mixture with other materials is an effective way to remove its waste from nature and return it to the production cycle. The aim of this study is to produce a mixture of recycled polyethylene terephthalate with polycarbonate and glass fibers with mechanical properties such as good impact strength, which ultimately leads to the production of...
Waste Water Purification of the Isfahan Zirconium Production Plant (ZPP) by Membrane Process
, M.Sc. Thesis Sharif University of Technology ; Samad Fam, Mohammad (Supervisor) ; Yavari, Ramin (Supervisor) ; Haji Hosseini, Majid (Co-Supervisor)
Abstract
Isfahan Zirconium Production Plant (ZPP) is one of the most important plants in the nuclear industry of Islamic Republic of Iran. The wastewater of this plant contains high values of Sodium, Chloride, Nitrate and low values of Calcium, Magnesium, Zinc and Zirconium ions. Its release has been banned by international and national law because of the dangers and toxicity of its ions for the environment and living organisms. Therefore, its refinement as a compensation of Iran’s water resources in agriculture and drinking water has received a major consideration. Among the common methods to removal of these ions, membrane process method is selected due to it's major benefits such as not producing...
Study on Effects of Short Wood Fibers on Physical and Mechanical Properties of Biodegradable Composite Based on Thermoplastic Starch
, M.Sc. Thesis Sharif University of Technology ; Bagheri, Reza (Supervisor) ; Sayyed Reihani, Morteza (Supervisor)
Abstract
Due to the negative effects of conventional plastics on the enviroment, especially in the packaging sector, extensive efforts have been put to replace these polymers with biodegradable polymers. Starch is one of the biodegradable polymers which has attracted a lot of attentions because of low cost and good processability. Native starch has the form of granule and can be processed to a continuous phase after gelatinization in the presence of a plasticizer. The resulting material is a biodegradable plastic-like material called thermoplastic starch (TPS) which is processed using conventional technologies, but suffers from low mechanical properties and high hydrophilicity. Addition of natural...
Optimal Batch Production for a Single Machine System with Rework
, M.Sc. Thesis Sharif University of Technology ; Haji, Ali Reza (Supervisor)
Abstract
This research attempts to develop the optimal solution for an inventory problem consisting of a single machine which produces items some of which may be defective. We assume that no shortages are allowed and all defective items are to be reworked. Setup cost for rework and waiting time of defectives are considered. This research consists of two different parts. In the first part we consider two different policies where in the first policy in each cycle after the regular production the machine is setup for the rework of defectives of the same cycle. In the second policy several cycles constitute a period. All the defectives produced in the period are reworked in the last cycle of that period....
Optimal batch production with rework and non-zero setup cost for rework
, Article 2009 International Conference on Computers and Industrial Engineering, 6 July 2009 through 9 July 2009 ; 2009 , Pages 857-862 ; 9781424441365 (ISBN) ; Haji, R ; Haji, A ; Sharif University of Technology
2009
Abstract
This paper attempts to develop the optimal solution for an inventoryproblem consisting of a single machine which produces items some of which may bedefective. We assume that no shortages are allowed and all defective items areto be reworked. Setup cost for rework and waiting time of defectives areconsidered. We consider two different policies where in the first policy in eachcycle after the regular production the machine is setup for the rework ofdefectives of the same cycle. In the second policy several cycles constitute aperiod. All the defectives produced in the period are reworked in the last cycleof that period. At the end of the rework cycle the whole process starts allover again. One...
One-for-one period policy in a two-echelon inventory system with commoncycle and poisson demand rate for retailers
, Article 2009 International Conference on Computers and Industrial Engineering, CIE 2009 ; 2009 , Pages 831-834 ; 9781424441365 (ISBN) ; Tayebi, H ; Haji, B ; Sharif University of Technology
2009
Abstract
This paper deals with a two-echelon inventory system consisting of onesupplier and N retailers. Each retailer faces an independent Poisson demand withthe same rate and applies a new ordering policy called one-for-one- periodordering policy for its inventory control. In this ordering policy the ordersize is equal to one and the time interval between any two consecutive ordersforms a common fixed cycle. Thus, the supplier faces a deterministic demand andadopts a deterministic inventory policy. At each cycle he orders a batch of sizeN to his own supplier. Upon receipt of each batch he sends 1 unit of theproduct to each retailer with a transportation cost. In this paper, for theabove system we...
Revenue sharing contract for a VMI with one for one period policy
, Article Cogent Engineering ; Volume 5, Issue 1 , 2018 , Pages 1-19 ; 23311916 (ISSN) ; Afzalabadi, M ; Haji, R ; Sharif University of Technology
Cogent OA
2018
Abstract
In this article, we design a revenue-sharing contract to coordinate inventory control decisions in a serial supply chain consisting of one supplier, one vendor, and one retailer. We assume that the retailer faces Poisson demand and his unsatisfied demands will be lost. The retailer applies one-for-one period policy in which he constantly places an order for one unit of product to the vendor in a predetermined time interval which results in a deterministic demand for the vendor. Vendor orders the required quantity from supplier which will be immediately received at the vendor’s warehouse. Solution procedures are developed to find the equilibrium in the vendor managed inventory program with a...
Pricing and inventory decisions in a vendor managed inventory system with revenue sharing contract
, Article Uncertain Supply Chain Management ; Volume 6, Issue 3 , 2018 , Pages 299-320 ; 22916822 (ISSN) ; Afzalabadi, M ; Haji, R ; Sharif University of Technology
Growing Science
2018
Abstract
In this paper, we design a revenue sharing contract to coordinate pricing and inventory control decisions in a serial supply chain consisting of one supplier, one manufacturer and one retailer. We assume that the retailer faces Poisson demand and his unsatisfied demands will be lost. The retailer applies one-for-one period policy in which he constantly places an order for one unit of product to the manufacturer in a predetermined time interval which results in a deterministic demand for the manufacturer. Solution procedures are developed to find the equilibrium in the Vendor Managed Inventory (VMI) program with a revenue sharing contract, in which no party is willing to deviate from for the...
Developing a partial backlogging deteriorating inventory model with selling price dependant demand rate and cycle length dependant selling price
, Article 2008 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2008, Singapore, 8 December 2008 through 11 December 2008 ; January , 2008 , Pages 198-202 ; 9781424426300 (ISBN) ; Sabahno, H ; Haji, R ; Sharif University of Technology
2008
Abstract
In this paper, we develop an inventory model with price dependant demand rate, under time value of money and inflation, finite time horizon, exponential backlogging rate and exponential deterioration rate with the objective of maximizing the present worth of the total system profit. Using a dynamic programming based solution algorithm, we are able to find the optimal sequence of the cycles and also to obtain different optimal selling prices and optimal order quantities for the cycles with unequal lengths, which have never been done before for our model. We also use a proper numerical example to show accuracy of the solution procedure. © 2008 IEEE
One-for-one period policy and a series of suppliers
, Article 2009 International Conference on Computers and Industrial Engineering, CIE 2009, 6 July 2009 through 9 July 2009, Troyes ; 2009 , Pages 902-906 ; 9781424441365 (ISBN) ; Pirayesh Neghab, M ; Haji, A ; Sharif University of Technology
2009
Abstract
The purpose of this paper is to adopt and analyze a new ordering policycalled one-for-one-period policy in a multi-echelon supply chain consisting ofone retailer and a series of TV suppliers. The main advantage of adopting theone-for-one-period (7,7) ordering policy for retailers is the elimination ofuncertainty for supplier which leads to total elimination of the safety stocksat all suppliers. This in turn leads to the reduction of the total system costsand in case any supplier's ordering cost is negligible it can even eliminate theneed for him to carry any inventory. In addition to this advantage, thenumerical results show that the application of this new policy for the retailerleads to...
Optimal batch production with minimum rework cycles and constraint on accumulated defective units
, Article 2009 IEEE/INFORMS International Conference on Service Operations, Logistics and Informatics, SOLI 2009, Chicago, IL, 22 July 2009 through 24 July 2009 ; 2009 , Pages 633-638 ; 9781424435418 (ISBN) ; Haji, A. R ; Haji, R ; Sharif University of Technology
2009
Abstract
This paper deals with the issue of economic batch quantity (EBQ) in a single machine system in which defective items are produced in each cycle of production. The accumulated defective items produced in a period, consisting of several equal cycles, are all reworked in the last cycle of this period called the rework cycle. At the end of each period the whole process will start all over again. We assume that there is a limitation on the total defective items. We also do not adopt the restriction that the rework process rate be equal to the normal production rate. In addition we assume that there is a set up time for rework process. Further we assume that the number of rework cycles be as small...
Economic production quantity with accumulated rework
, Article 36th International Conference on Computers and Industrial Engineering, ICC and IE 2006, Taipei, 20 June 2006 through 23 June 2006 ; 2006 , Pages 4196-4203 ; Tavakol, A. R ; Haji, B ; Sharif University of Technology
2006
Abstract
This paper deals with the issue of economic batch quantity (EBQ) in a single machine system in which defective items are produced in each cycle of production. The defective items produced in the first N cycles are accumulated at the end of the Nth cycle and are all reworked in a separate cycle called the rework cycle which has the same length as the other cycles and begins just at the end of the Nth cycle. At the end of the rework cycle the whole process will start all over again. For this system, assuming no shortages are permitted we obtain the economic batch quantity which minimizes the total cost
Multi-Echelon Mixed-loop Supply Chain Network Design under Disruption Conditions
, M.Sc. Thesis Sharif University of Technology ; Haji, Rasoul (Supervisor) ; Haji, Alireza (Supervisor)
Abstract
Fulfilling the demands of customers, used to be the main purpose of Supply Chain Network Designers. Soon after that, the environmental concerns created the concept of Reverse Logistic in order to prevent goods from being scattered in the environment after their disposal. Governmental regulations and people's concerns, forced the factories to gather the created pollutions of the environment. They gradualy confessed the positive impacts of these ruturns on their financials. The flow of forward and reverse logistics establishes a Closed-Loop in which the returning economical circumstances were transferd into original factories. Later, Open-Loops were created. In open-loops the returns have to...
The Effects of Intentional Process Models on Goal Modeling and Process Conformance Checking
, M.Sc. Thesis Sharif University of Technology ; Rafiei, Majid (Supervisor) ; Khedmati, Majid (Supervisor)
Abstract
In recent years, requirement engineering and goal modeling have gained more attention among different organisations. Therefore, different methods have been designed to discover stakeholders’ requirements and translate them into process and organizational goals. Various goal models have been introduced to represent these goals and their relations towards each other. Still, these methods are manual representations of different process scenarios and do not relate to the actual behavior. In 2014, Map Miner Method (MMM) was introduced to discover intentional process models from event logs. MMM uses Hidden Markov Model (HMM) as a means to represent the process as a map model of strategies and...
Inventory Control Dynamic Models in Decentralized Supply Chain with Coordination
, Ph.D. Dissertation Sharif University of Technology ; Haji, Alireza (Supervisor) ; Haji, Rasoul (Co-Advisor)
Abstract
Although inventory control under discrete demand in dynamic quantities and time intervals are very common in reality, existing literature has largely ignored them. In this thesis, we investigate the inventory control decisions in a two echelon supply chain. The vendor supplies a product to several retailers, buying discrete quantities in pre-determined time intervals. The order quantity and order cycles for each retailer can be different from others. We have developed a new efficient algorithm to find the optimal ordering policy involves the scheduling and the order quantity of vendor to his supplier to minimize his cost function in infinite time horizon. Moreover, we have designed a revenue...
A Trajectory Recommendation System for Efficient Finding of Passengers
, M.Sc. Thesis Sharif University of Technology ; Khedmati, Majid (Supervisor) ; Rafiee, Majid (Supervisor)
Abstract
Recommending routes to city taxis in order to improve their performance in finding passengers can reduce traffic, pollution and waiting time for passengers, as well as this, increasing the efficiency of taxis can increase their income. In this study, by analyzing trajectory data obtained from 536 taxis in San Francisco over a period of one month, we generated networks of cells, each of which has time-dependent characteristics such as the probability of finding a passenger, the capacity of each cell, or the amount of demand exists is in the cell and the average speed of passing through that cell. also, the connections between these cells in order to make more use of the experiences of taxi...
Improving Artificial Neural Network Predictive Performance Using Panel Data
, M.Sc. Thesis Sharif University of Technology ; Khedmati, Majid (Supervisor) ; Rafiee, Majid (Supervisor)
Abstract
The purpose of the present study is to develop neural network estimation method for hybrid or panel data which have a combination of two cross-sectional and time series structures and because of the features of both structures, their use in different sciences offers many advantages; and the analytical methods for this data structure are also different from other one-dimensional structures, so different and specific regression models are presented for this data structure. However, in the artificial neural network method, modeling the development for this data structure is neglected, so in the present study, using the concepts of panel regression methods and their application to the...
Prediction of Financial Markets Using Combination of Artificial Intelligence and Technical Analysis
, M.Sc. Thesis Sharif University of Technology ; Haji, Alireza (Supervisor)
Abstract
Generally, nowadays, machine learning methods are used in many different areas for their superiority over other methods of prediction. Although being a tough task, stock market prediction with machine learning approaches is being spread due to satisfying results published ever yday. Machine learning methods usually use varied kinds of data ,including structured data such as market data, technical indicators and some fundamental data as well as unstructured one entailing text and graph data in order to enhance their predictability capacity. In this thesis we aimed to find out more about the importance and the contribution of structured data in prediction and we tried to attain a framework...
Introducing a new ordering policy in a two-echelon inventory system with Poisson demand
, Article International Journal of Production Economics ; Volume 117, Issue 1 , 2009 , Pages 212-218 ; 09255273 (ISSN) ; Neghab, M. P ; Baboli, A
Elsevier
2009
Abstract
In this paper we introduce a new ordering policy for inventory control in a two-echelon inventory system consisting of one central warehouse and a number of non-identical retailers. The warehouse uses a modified one-for-one policy, but the retailers apply a new policy which is different from the traditional inventory policies described in the literature of inventory and production control systems. In this system, each retailer constantly places an order for one unit of product to the central warehouse in a pre-determined time interval; i.e., the time interval between any two consecutive orders from each retailer is a fixed number and the quantity of each order is one. We then show how the...