    A branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penalties

    , Article Applied Mathematical Modelling ; 2015 ; 0307904X (ISSN) Keshavarz, T ; Savelsbergh, M ; Salmasi, N ; Sharif University of Technology
    2015
    Abstract
    The NP-hard single machine sequence-dependent group scheduling problem with minimization of total weighted earliness and tardiness is investigated. An arc-time-indexed formulation is presented and a Lagrangian-based branch-and-bound algorithm is proposed. The Lagrangian relaxation of the arc-time-indexed formulation is solved as a shortest path problem. The results of an extensive computational study demonstrate the efficacy of the proposed algorithm and establish characteristics of some hard to solve instances  

    A branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penalties

    , Article Applied Mathematical Modelling ; Volume 39, Issue 20 , October , 2015 , Pages 6410–6424 ; 0307904X (ISSN) Keshavarz, T ; Savelsbergh, M ; Salmasi, N ; Sharif University of Technology
    2015
    Abstract
    The NP-hard single machine sequence-dependent group scheduling problem with minimization of total weighted earliness and tardiness is investigated. An arc-time-indexed formulation is presented and a Lagrangian-based branch-and-bound algorithm is proposed. The Lagrangian relaxation of the arc-time-indexed formulation is solved as a shortest path problem. The results of an extensive computational study demonstrate the efficacy of the proposed algorithm and establish characteristics of some hard to solve instances  

    Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times

    , Article International Journal of Advanced Manufacturing Technology ; Volume 40, Issue 11-12 , 2009 , Pages 1216-1226 ; 02683768 (ISSN) Mansouri, S. A ; Hendizadeh, S. H ; Salmasi, N ; Sharif University of Technology
    2009
    Abstract
    A two-machine flowshop scheduling problem is addressed to minimize setups and makespan where each job is characterized by a pair of attributes that entail setups on each machine. The setup times are sequence-dependent on both machines. It is shown that these objectives conflict, so the Pareto optimization approach is considered. The scheduling problems considering either of these objectives are N p - hard, so exact optimization techniques are impractical for large-sized problems. We propose two multi-objective metaheurisctics based on genetic algorithms (MOGA) and simulated annealing (MOSA) to find approximations of Pareto-optimal sets. The performances of these approaches are compared with... 

    Bicriteria two-machine flowshop scheduling using metaheuristics

    , Article 9th Annual Genetic and Evolutionary Computation Conference, GECCO 2007, London, 7 July 2007 through 11 July 2007 ; 2007 , Pages 909- ; 9781595936974 (ISBN) Mansouri, S. A ; Hendizadeh, S. H ; Salmasi, N ; Sharif University of Technology
    2007
    Abstract
    A bicriteria two-machine flowshop scheduling problem is addressed to minimize the number of setups and makespan. The jobs have sequence dependent setup times. Scheduling problems considering either of these objectives are NP-hard. Two multi-objective metaheurisctics based on genetic algorithms (MOGA) and simulated annealing (MOSA) are proposed to find approximations of Pareto-optimal frontiers. The performances of these approaches are compared with lower bounds for small problems. In larger problems, their performance is compared with each other. Experimentations revealed that both algorithms perform very similar on small problems and that MOGA outperforms MOSA in terms of the quality of... 

    Classification and properties of acyclic discrete phase-type distributions based on geometric and shifted geometric distributions

    , Article Journal of Industrial Engineering International ; Volume 15, Issue 4 , 2019 , Pages 651-665 ; 17355702 (ISSN) Varmazyar, M ; Akhavan Tabatabaei, R ; Salmasi, N ; Modarres, M ; Sharif University of Technology
    SpringerOpen  2019
    Abstract
    Acyclic phase-type distributions form a versatile model, serving as approximations to many probability distributions in various circumstances. They exhibit special properties and characteristics that usually make their applications attractive. Compared to acyclic continuous phase-type (ACPH) distributions, acyclic discrete phase-type (ADPH) distributions and their subclasses (ADPH family) have received less attention in the literature. In this paper, we present the definition, properties, characteristics and PH representations of ADPH distributions and their subclasses with finite state space. Based on the definitions of geometric and shifted geometric distributions, we propose a distinct... 

    Estimating the parameters of mixed shifted negative binomial distributions via an EM algorithm

    , Article Scientia Iranica ; Volume 26, Issue 1E , 2019 , Pages 571-586 ; 10263098 (ISSN) Varmazyar, M ; Akhavan Tabatabaei, R ; Salmasi, N ; Modarres, M ; Sharif University of Technology
    Sharif University of Technology  2019
    Abstract
    Discrete Phase-Type (DPH) distributions have one property that is not shared by Continuous Phase-Type (CPH) distributions, i.e., representing a deterministic value as a DPH random variable. This property distinguishes the application of DPH in stochastic modeling of real-life problems, such as stochastic scheduling, in which service time random variables should be compared with a deadline that is usually a constant value. In this paper, we consider a restricted class of DPH distributions, called Mixed Shifted Negative Binomial (MSNB), and show its flexibility in producing a wide range of variances as well as its adequacy in fitting fat-tailed distributions. These properties render MSNB... 

    Estimating the parameters of mixed shifted negative binomial distributions via an EM algorithm

    , Article Scientia Iranica ; Volume 26, Issue 1E , 2019 , Pages 571-586 ; 10263098 (ISSN) Varmazyar, M ; Akhavan Tabatabaei, R ; Salmasi, N ; Modarres, M ; Sharif University of Technology
    Sharif University of Technology  2019
    Abstract
    Discrete Phase-Type (DPH) distributions have one property that is not shared by Continuous Phase-Type (CPH) distributions, i.e., representing a deterministic value as a DPH random variable. This property distinguishes the application of DPH in stochastic modeling of real-life problems, such as stochastic scheduling, in which service time random variables should be compared with a deadline that is usually a constant value. In this paper, we consider a restricted class of DPH distributions, called Mixed Shifted Negative Binomial (MSNB), and show its flexibility in producing a wide range of variances as well as its adequacy in fitting fat-tailed distributions. These properties render MSNB... 

    Train Scheduling on a two-Way and Single Track Railway Line Considering the Train Stops for Prayer

    , M.Sc. Thesis Sharif University of Technology Tahernejad, Sahar (Author) ; Salmasi, Naser (Supervisor)
    Abstract
    Train scheduling is one of the most complicated stages of railway planning. In this stage, the arrival and departure times of trains at stations are determined. In this thesis, we studied train scheduling on a two-way and single track railway in order to minimize the total travel times of trains subject to a set of operational constraints and prayer time related constraints that determines the optimal station for prayer. In this project, we tried to simulate the real constraints exist in IRAN railway network and the objective function considers customer’s and railway management’s satisfaction, simultaneously. First, a mathematical programming is proposed for this problem. After demonstrating... 

    Developing Mathematical Model and a Meta-Heuristic Algorithm for Nurse Scheduling Problem

    , M.Sc. Thesis Sharif University of Technology Jafari, Hamed (Author) ; Salmasi, Naser (Supervisor)
    Abstract
    Nurse scheduling problem has received a great amount of attention during recent years. In this problem number of needed nurses from different skill levels is given for each Location-shift during planning horizon, and the goal is to allocate each nurse to shifts, such that the demand of each location-shift is satisfied. Many researches have been done with the aim of minimizing the number of needed nurses to satisfy the demand of locationshifts or maximizing nurses preferences to work in desired shifts. In this research an integer programming model is proposed to minimize the number of needed nurses and maximize nurses preferences simultaneously. The proposed mathematical model is appropriate... 

    Investment Management under Risk Constraints in Oil Industries

    , M.Sc. Thesis Sharif University of Technology Imanlou, Mohammad (Author) ; Salmasi, Naser (Supervisor)
    Abstract
    In this research the risk of oil price for Iran and Opec basket is studied. Several methods in order to estimate Value at Risk (VaR) such as Standard Historical Simulation, Historical Simulation with Autoregressive Forecast, Historical Simulation with moving average forecast, and ARMA are examined. The experiment is performed based on daily oil prices, from January 2005 to December 2009. The data is divided into two smaller time periods. The first, from 2005 to 2008, was used to estimate the model coefficients. The second part of data, i.e., the data gathered in 2009, was used for forecasting purposes. The result of experiment show that Historical Simulation with Autoregressive Forecasts... 

    Olympic Games Scheduling

    , M.Sc. Thesis Sharif University of Technology Ghorbanian, Nafiseh (Author) ; Salmasi, Nasser (Supervisor)
    Abstract
    In the present work, the problem of Olympic Games scheduling is investigated. Due to the high number of matches and limited number of resources, scheduling of the Olympic Games is a difficult and time consuming job. Also a balanced distribution of medals on the days of Olympic Games keep each day attractive for the people and prevent sudden changes in the medal ranking of countries. So, in regard to the limitations of the problem and to balance the distribution of medals, the Olympic Games are scheduled. In order to do that, at first, two mathematical models are presented. One of them is for obtaining the feasible and optimum solution in a specified period of time. The other model presents a... 

    Stochastic Scheduling in Single Machine and Flow Shop Environments

    , Ph.D. Dissertation Sharif University of Technology Elyasi, Ali (Author) ; Salmasi, Naser (Supervisor)
    Abstract
    Sequencing and scheduling of jobs are decision making processes that are used in many manufacturing and service industries. In the traditional scheduling models, it is assumed that the values for all the problem parameters are constant and known in advance. However, production environments in the real world are subject to many sources of uncertainty or randomness. This research investigates three different types of stochastic scheduling problems. In the first case, the problem is minimizing the number of tardy jobs in the class of static list policies, where the job processing times are random variables. For this case, the stochastic problems in single machine and flow shop environments are... 

    A Two Criteria Objective Function Flexible Flowshop Scheduling Problem With Machine Eligibility Constraint

    , M.Sc. Thesis Sharif University of Technology Tadayon, Bita (Author) ; Salmasi, Nasser (Supervisor)
    Abstract
    This study strives to minimize a two-criterion objective function of a flexible flow shop scheduling problem with receipt and delivery of jobs in groups and processing them individually. Every group of jobs has a release time, which means that all jobs are not available at the beginning of the planning horizon. Moreover, due to the special characteristics of every job in a group, only a subset of machines at each stage are eligible to process that job. This problem has many applications in production and service industries, such as restaurants and ceramic tile manufacturing companies. The objective function is determined based on the practical applications of the problem. It deals with... 

    Upper and Lower Bounding Methods for Flowshop and Flexible Flowshop Group Scheduling Problems

    , Ph.D. Dissertation Sharif University of Technology Keshavarz, Taha (Author) ; Salmasi, Nasser (Supervisor)
    Abstract
    In this research sequence-dependent flowshop and flexible flowshop group scheduling problems are investigated. Several upper and lower bounding methods are proposed for the research problems. Permutation flowshop sequence-dependent group scheduling problem with minimization of total completion time is considered. Since the problem is shown to be strongly NP-hard, a Memetic algorithm (MA) is proposed. A lower bounding method base on the Branch-and-Price algrithm is also proposed. A statistical comparison shows that both the proposed MA and the proposed lower bounding method have better performance than the other methods from the literature with an average 5.96% percentage gap. Flexible... 

    Minimizing the Number of Tardy Jobs in Flow Shop Sequence Dependent Setup Times Scheduling Problem

    , M.Sc. Thesis Sharif University of Technology Varmazyar, Mohsen (Author) ; Salmasi, Nasser (Supervisor)
    Abstract
    This research investigates permutation flow shop scheduling problems with sequence-dependent setup times with minimizing the number of tardy jobs as criterion (Fm|prmu, Sijk|ΣUj). A mixed integer linear programming model has been developed for the research problem. As the problem is shown to be NP-hard, several meta-heuristic algorithms based on tabu search (TS) and imperialist competitive algorithm are developed to heuristically solve the problem. In order to find the best meta-heuristic algorithm, random test problems, ranging in size from small, medium, to large are created and solved by the meta-heuristic algorithms. Then, a detailed statistical experiment, based on split-plot design is... 

    Application of Data Mining in Healtcare

    , M.Sc. Thesis Sharif University of Technology Oliyaei, Azadeh (Author) ; Salmasi, Nasser (Supervisor)
    Abstract
    Data mining is the one of top ten developing knowledge in the world. This study followed three fold objectives; Firstly, An efficient model based on data mining algorithms is proposed to predict the duration of hospitalization time for patients of digestive system disease that need short term care. Duration of hospitalization is an important criterion to be used for predicting the hospital resources. In order to, a combined model based on CHAID and C.5 decision trees and a neural network is suggested. The suggested model predict the duration of hospitalization with 82% accuracy. The second object of this study is to propose an algorithm based on likelihood ratio. The suggested algorithm... 

    Data Mining Application in Customer Relationship Management: Case study in Saipa Yadak Co.

    , M.Sc. Thesis Sharif University of Technology Akbari, Amin (Author) ; Salmasi, Naser (Supervisor)
    Abstract
    One of the most applicable fields in data mining is customer relationship management (CRM). CRM process includes four aspects: Customer identification, Customer attraction, Customer retention, and Customer development. Data mining can be a supportive tool for decision making in each of these CRM aspects. Huge volume of data and information corresponding to CRM that exists in companies' databases, has made sufficient potential for data mining process and discovering hidden knowledge. Importance of concepts like customer needs identification, customer retention, and increasing customer value for companies has made the need to use of data mining techniques more valuable. Saipa Yadak Co., as a... 

    Flexible Job Shop Scheduling with Sequence Dependent Setup Times

    , M.Sc. Thesis Sharif University of Technology Kahne, Abdollah (Author) ; Salmasi, Naser (Supervisor)
    Abstract
    Due to increasing competition, Flexible Manufacturing System (FMS) take more attention in the new world. This flexibility is generally considered to fall into two categories, which both contain numerous subcategories. The first category, machine flexibility, covers the system's ability to be changed to produce new product types, and ability to change the order of operations executed on a part. The second category is called routing flexibility. Due to high variation in parts and low production volume, setup times are important. In this research, Flexible Jobshop Scheduling Problem with Sequence Dependent Setup Time (SDST-FJSP), as an extension of classical Jobshop scheduling problem (JSP), is... 

    The Anxiety-based Scheduling of Operating Rooms: An Idea to Develop Psyche-based Optimization

    , M.Sc. Thesis Sharif University of Technology Cheramin, Meysam (Author) ; Salmasi, Naser (Supervisor)
    Abstract
    The traditional point of view on the scheduling of the healthcare systems, which is in common with the scheduling of other service and manufacturing systems, has contributed to inattention to patients’ psychological status and has given rise to many negative effects not only on them, but also on hospitals. However, this perspective has not been modified yet with respect to the features of healthcare systems, in which patients, rather that machines, are the main entities of the system. In this study, to address this draw back, a new concept, psyche-based optimization, as well as a new scheduling problem, anxiety-based scheduling of operating rooms, as the advent of this concept, have been... 

    Parallel Machines with Batch Processing

    , M.Sc. Thesis Sharif University of Technology Chaghazardy, Delaram (Author) ; Salmasi, Nasser (Supervisor)
    Abstract
    Due to the undeniable importance and applicability of both "batch processing" and "parallel machines" in service and industry, this survey strives to solve a real-world problem in which some identical parallel machine, capable of processing jobs in batches, are available. In batch processing the process of jobs starts and ends simultaneously. In real world the processing time of the batch is a function of some characteristics of the jobs in the batch. in this survey, for simplicity (as calculating the mentioned function is so difficult), we assume that the processing time of a batch equals the sum of the processing time of the jobs in the batch. we also have assumed that the capacity of a...