Loading...
Search for: rework
0.068 seconds

    Optimal Batch Production for a Single Machine System with Rework

    , M.Sc. Thesis Sharif University of Technology Haji, Babak (Author) ; Haji, Ali Reza (Supervisor)
    Abstract
    This research attempts to develop the optimal solution for an inventory problem consisting of a single machine which produces items some of which may be defective. We assume that no shortages are allowed and all defective items are to be reworked. Setup cost for rework and waiting time of defectives are considered. This research consists of two different parts. In the first part we consider two different policies where in the first policy in each cycle after the regular production the machine is setup for the rework of defectives of the same cycle. In the second policy several cycles constitute a period. All the defectives produced in the period are reworked in the last cycle of that period.... 

    Economic Batch Quantity (EBQ) for a Single-Stage Production System with Rework and Scrapping

    , M.Sc. Thesis Sharif University of Technology Rahmani, Vasim (Author) ; Haji, Rasoul (Supervisor)
    Abstract
    The classical economic batch quantity (EBQ) model assumes that all produced items have a perfect quality. But in real-life production systems, generation of defective items is inevitable. A portion of these defective items is considered to be scrap , while the other is assumed to be reworkable and reworking them can reduce costs and increase productivity. In this thesis we have studied the economic batch quantity for a single stage production system with rework and scrapping . We want to satisfy the customer demand and minimize total costs of the system like set up costs , production costs , rework costs , holding costs , shortage costs and scrapping costs . In the first chapter of this... 

    “Determination of Economic Order and Production Quantity in Inventory System Regarding the Quality of Items”

    , M.Sc. Thesis Sharif University of Technology Torabi, Hassan (Author) ; Haji, Rasoul (Supervisor)
    Abstract
    EOQ and EPQ models have been among the most important and commonly used techniques for about 100 and 60 years respectively .But, they are involved in some assumptions that sometimes prevent them from being implemented in real situation of industry and production. One of these unrealistic assumptions is that all of items received or produced are of perfect quality. In order to overcome this constraint and make the mentioned models closer to the real environmentsome researches have been done. To this end,following the previous attemptsin this project we assumed to have destructive inspections and existence of imperfect and rejected items after rework. In our models, considering 3 circumstances... 

    Optimizing the Economic Lot Size of a Two-Stage Supply Chain With Rework Consideration

    , M.Sc. Thesis Sharif University of Technology Mobarak Abadi, Sara (Author) ; Hajji, Rasul (Supervisor)
    Abstract
    In the present research a two stage supply chain is considered. In its first echelon, there is a producer that produces both perfect and defective items. Defective items are reworked by producer and no defective item is produced during the reworking process. There is a buyer in second echelon of the supply chain that faces constant demand and orders fixed batches in fixed periods to the producer. So in each complete cycle of production, multiple orders are received from buyer. Two different policies for reworking are investigated in this research. In the first policy, reworking is done in the same cycle that producing is conducted but in the second one all defective items that are produced...