Loading...

Feasibility Study Of A Gas To Liquid Plant

Vahidian, Somayeh | 2009

4024 Viewed
  1. Type of Document: M.Sc. Thesis
  2. Language: Farsi
  3. Document No: 39011 (01)
  4. University: Sharif University of Technology
  5. Department: Industrial Engineering
  6. Advisor(s): Hooshmand, Mahmoud
  7. Abstract:
  8. The methodology proposed by UNIDO , to investigate feasibility study of industrial project, is a useful tool in pre-investment decision making. In this work feasibility of investing on "Gas To Liquid" GTL Plant of Asalouye is investigated. Having gathered required information, including gas field potential, required technology and machineries, cost of investments , required manpower to run the UNIDO methodology is used to investigate the investment, the result of the work shows that the project is feasible and it would have internal rate of return of 24% ( by sale cost= 81 $ per barrel of GTL product)
  9. Keywords:
  10. Feasibility Study ; Natural Gas Conversion ; Pars Special Economic Energy Zone (Assaluyeh) ; United Nation Industrial Development Organisation (UNIDO)Method ; Gasoline Production

 Digital Object List

 Bookmark

No TOC