Loading...
A resource constrained project scheduling problem with fuzzy random duration [electronic resource]
Nematian, J. (Javad) ; Sharif University of Technology
562
Viewed
- Type of Document: Article
- Abstract:
- In this paper, first a fuzzy random resource-constrained project scheduling problem is presented. The object of the problem is to find the optimal scheduling of project activities. In this model, duration of project activities is a fuzzy random variable. Then, the proposed model is formulated by using the expected value of fuzzy random variables as an IP model. An illustrative example is also provided to clarify the concept. © 2010 World Academic Press, UK. All rights reserved
- Keywords:
- Resource-constrained project scheduling problem ; Fuzzy random variable ; Integer programming
- Source: Journal of Uncertain Systems ; Vol.4, No.2, pp.123-132, 2010
- URL: http://www.civilica.com/Paper-ICIORS01-ICIORS01_157.html