Loading...

Closure to "water hammer in a horizontal rectangular conduit containing air-water two-phase slug flow" by Amin Eyhavand-Koohzadi, Seyed M. Borghei, and Abdorreza Kabiri-Samani

Eyhavand Koohzadi, A ; Sharif University of Technology

29 Viewed
  1. Type of Document: Article
  2. DOI: 10.1061/(ASCE)HY.1943-7900.0001098
  3. Keywords:
  4. Source: Journal of Hydraulic Engineering ; Volume 143, Issue 9 , 2017 ; 07339429 (ISSN)
  5. URL: https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29HY.1943-7900.0001354