Loading...
Axiomatic design of step down DC/DC converter
Kaboli, S ; Sharif University of Technology | 2008
379
Viewed
- Type of Document: Article
- DOI: 10.1109/ICIT.2008.4608313
- Publisher: 2008
- Abstract:
- In this paper, the axiomatic design is introduced for designing the power electronic converters. The main idea of axiomatic design is to introduce variables affecting the desired performances of the system most independently possible. The design process is presented for a Buck converter. ©2008 IEEE
- Keywords:
- Design ; Power electronics ; Axiomatic design ; Axiomatic designs ; Buck converters ; Dc/dc converters ; Design procedure ; Design processes ; Electronic converters ; Power electronics converter ; Process engineering
- Source: 2008 IEEE International Conference on Industrial Technology, IEEE ICIT 2008, Chengdu, 21 April 2008 through 24 April 2008 ; 2008 ; 9781424417063 (ISBN)
- URL: https://ieeexplore.ieee.org/document/4608313
