    Waste Water Purification of the Isfahan Zirconium Production Plant (ZPP) by Membrane Process

    , M.Sc. Thesis Sharif University of Technology Chaichi, Mahdieh (Author) ; Samad Fam, Mohammad (Supervisor) ; Yavari, Ramin (Supervisor) ; Haji Hosseini, Majid (Co-Supervisor)
    Abstract
    Isfahan Zirconium Production Plant (ZPP) is one of the most important plants in the nuclear industry of Islamic Republic of Iran. The wastewater of this plant contains high values of Sodium, Chloride, Nitrate and low values of Calcium, Magnesium, Zinc and Zirconium ions. Its release has been banned by international and national law because of the dangers and toxicity of its ions for the environment and living organisms. Therefore, its refinement as a compensation of Iran’s water resources in agriculture and drinking water has received a major consideration. Among the common methods to removal of these ions, membrane process method is selected due to it's major benefits such as not producing... 

    Operating Room Scheduling with Data driven Robust Optimization Approach

    , M.Sc. Thesis Sharif University of Technology Shah Hosseini, Yasaman (Author) ; Rafiee, Majid (Supervisor)
    Abstract
    In this thesis we will focus on operating room scheduling considering open strategy and uncertainty in the duration of operations for elective patients. A mixed integer programming model will be proposed having the expected list of patients that are going to be scheduled in the specific time horizon and working hours of doctors with the purpose of maximizing the number of scheduled elective patients in the determined time horizon. We aim to assign each patient to an operating room and a start time regarding operating rooms and surgeons working hours, care units capacity constraints and sequencing constraints. We will define three possible ways for each patient after their operations, naming... 

    Production of extracellular protease and determination of optimise condition by bacillus licheniformis BBRC 100053

    , Article Chemical Engineering Transactions ; Volume 21 , 2010 , Pages 1447-1452 ; 19749791 (ISSN) ; 9788895608051 (ISBN) Ghobadinejad, Z ; Yaghmaei, S ; Haji Hosseini, R ; Sharif University of Technology
    2010
    Abstract
    The production of protease by Bacillus licheniformis BBRC 100053 was studied. The most appropriate medium for the growth and protease production is composed of: lactose 1 %, yeast extract 0.5 %, peptone 0.5 %, KH 2PO4 0.1%, MgSO4.7H2O 0.02 %. Enzyme production corresponded with growth and reached a maximums level (589 U/ml) during the stationary phase at 35 °C, pH equivalent to 10 and with 150 rpm after 73 hours. Protease activity was highest at pH 8 and 45 °C. The best carbon sources are respectively lactose and maltose and the best nitrogen source is peptone The protease was highly active and stable from pH 7.0 to 11.0 with an optimum at pH 7-8.Thermo stability of the enzyme was considered... 

    A Methology for Implementing ITIL V3 based on PMBOK

    , M.Sc. Thesis Sharif University of Technology Haji Hosseini, Hamid Reza (Author) ; Shadrokh, Shahram (Supervisor)
    Abstract
    PMBOK is a standard that is the subset of Project Management Knowledge and includes all areas. ITIL is a framework that allows IT organizations using best practices in IT Service Management. Both of them includes some process that during implementation and execution should act based on them. The goal of developing a methodology for implementing ITIL V3 based on PMBOK is executing a comparison mapping for connecting these two difference fields. IT managers know about ITIL implementation, but most of project managers are not familiar about it. If we guess that implementing ITIL V3 is a project, a project manager can do it based on PMBOK. With mapping these two fields, project managers are able... 

    Production of extracellular protease and determination of optimal condition by bacillus licheniformis BBRC 100053

    , Article International Journal of Engineering, Transactions B: Applications ; Volume 22, Issue 3 , 2009 , Pages 221-228 ; 1728-144X (ISSN) Ghobadi Nejad, Z ; Yaghmaei, S ; Haji Hosseini, R ; Sharif University of Technology
    Materials and Energy Research Center  2009
    Abstract
    The production of protease by Bacillus licheniformis BBRC 100053 was studied. The most appropriate medium for the growth and protease production is composed of: lactose 1%, yeast extract 0.5%, peptone 0.5%, KH2PO 4 0.1%, MgSO4.7H2O 0.02%. Enzyme production corresponded with growth and reached a maximums level (589 U/ml) during the stationary phase at 35°C, pH equivalent to 10 and with 150 rpm after 73 hours. Protease activity was highest at pH 8 and 45°C. The best carbon sources are respectively lactose and maltose and the best nitrogen source is peptone. The protease was highly active and stable from pH 7.0 to 11.0 with an optimum at pH 7-8.... 

    Design and Operational Analysis of Superconducting Qubits

    , M.Sc. Thesis Sharif University of Technology Haji Hosseini Roknabadi, Saeed (Author) ; Fardmanesh, Mahdi (Supervisor)
    Abstract
    Quantum bits, also known as Qubits are the smallest building blocks of quantum computers, their correct operation has a great impact on quantum computing fidelity. For this purpose, Qubits need to have the necessary properties. Many properties have been defined for Josephson junction-based Qubits in order to implement better qubits. In this master thesis, the main characteristics of superconducting quantum bits including resonant frequency, anharmonicity factor, output readability signal, and quantum decoherence time including relaxation time and dephasing time have been calculated for cooper pair box topology in different operational regimes from cooper pair box regime to quantronium and... 

    A Dynamic Model for Cost Reduction in Mega Projects Via Interface Management in Case of Multiple Contractors

    , M.Sc. Thesis Sharif University of Technology Kereshyar, Ali (Author) ; Haji, Alireza (Supervisor) ; Mostafavi, Mostafa (Co-Supervisor) ; Hosseini, Hossein (Co-Supervisor)
    Abstract
    One of the main goals in large projects with multiple contractors is to reduce costs in various processes. The complexity of a large project, which is mainly due to the complexity of activities and the existence of interference between different phases and the lack of transparency of activities, can be added to the multiplicity of contractors and the difficulty of proper interface management.As regards that large projects with a large scope of work, have to use several contractors and this issue has a direct impact on increasing project costs, large project management becomes a major challenge that the application of appropriate knowledge, improving processes and skills and tools can play a... 

    Optimal Batch Production for a Single Machine System with Rework

    , M.Sc. Thesis Sharif University of Technology Haji, Babak (Author) ; Haji, Ali Reza (Supervisor)
    Abstract
    This research attempts to develop the optimal solution for an inventory problem consisting of a single machine which produces items some of which may be defective. We assume that no shortages are allowed and all defective items are to be reworked. Setup cost for rework and waiting time of defectives are considered. This research consists of two different parts. In the first part we consider two different policies where in the first policy in each cycle after the regular production the machine is setup for the rework of defectives of the same cycle. In the second policy several cycles constitute a period. All the defectives produced in the period are reworked in the last cycle of that period.... 

    Transmission Expansion Planning in Deregulated Environments

    , Ph.D. Dissertation Sharif University of Technology Maghouli, Pouria (Author) ; Hosseini, Hamid (Supervisor) ; Oloomi Buygi, Majid (Co-Advisor) ; Shahidehpour, Mohamad (Co-Advisor)
    Abstract
    This study presents a multi-objective optimization framework for transmission expansion planning in restructured electricity markets under uncertainty considerations. Deregulation of power system has introduced new objectives and requirements for transmission expansion planning problem. Also, the unbundling of electricity industry introduced new uncertainties and escalated the existing ones in network planning. Under these circumstances there is an emerging need for new planning models to cope with restructured electricity industry requirements.The conventional least-cost approaches which represent the transmission expansion planning as a single objective optimization problem could not... 

    Optimal batch production with rework and non-zero setup cost for rework

    , Article 2009 International Conference on Computers and Industrial Engineering, 6 July 2009 through 9 July 2009 ; 2009 , Pages 857-862 ; 9781424441365 (ISBN) Haji, B ; Haji, R ; Haji, A ; Sharif University of Technology
    2009
    Abstract
    This paper attempts to develop the optimal solution for an inventoryproblem consisting of a single machine which produces items some of which may bedefective. We assume that no shortages are allowed and all defective items areto be reworked. Setup cost for rework and waiting time of defectives areconsidered. We consider two different policies where in the first policy in eachcycle after the regular production the machine is setup for the rework ofdefectives of the same cycle. In the second policy several cycles constitute aperiod. All the defectives produced in the period are reworked in the last cycleof that period. At the end of the rework cycle the whole process starts allover again. One... 

    One-for-one period policy in a two-echelon inventory system with commoncycle and poisson demand rate for retailers

    , Article 2009 International Conference on Computers and Industrial Engineering, CIE 2009 ; 2009 , Pages 831-834 ; 9781424441365 (ISBN) Haji, R ; Tayebi, H ; Haji, B ; Sharif University of Technology
    2009
    Abstract
    This paper deals with a two-echelon inventory system consisting of onesupplier and N retailers. Each retailer faces an independent Poisson demand withthe same rate and applies a new ordering policy called one-for-one- periodordering policy for its inventory control. In this ordering policy the ordersize is equal to one and the time interval between any two consecutive ordersforms a common fixed cycle. Thus, the supplier faces a deterministic demand andadopts a deterministic inventory policy. At each cycle he orders a batch of sizeN to his own supplier. Upon receipt of each batch he sends 1 unit of theproduct to each retailer with a transportation cost. In this paper, for theabove system we... 

    Revenue sharing contract for a VMI with one for one period policy

    , Article Cogent Engineering ; Volume 5, Issue 1 , 2018 , Pages 1-19 ; 23311916 (ISSN) Haji, A ; Afzalabadi, M ; Haji, R ; Sharif University of Technology
    Cogent OA  2018
    Abstract
    In this article, we design a revenue-sharing contract to coordinate inventory control decisions in a serial supply chain consisting of one supplier, one vendor, and one retailer. We assume that the retailer faces Poisson demand and his unsatisfied demands will be lost. The retailer applies one-for-one period policy in which he constantly places an order for one unit of product to the vendor in a predetermined time interval which results in a deterministic demand for the vendor. Vendor orders the required quantity from supplier which will be immediately received at the vendor’s warehouse. Solution procedures are developed to find the equilibrium in the vendor managed inventory program with a... 

    Pricing and inventory decisions in a vendor managed inventory system with revenue sharing contract

    , Article Uncertain Supply Chain Management ; Volume 6, Issue 3 , 2018 , Pages 299-320 ; 22916822 (ISSN) Haji, A ; Afzalabadi, M ; Haji, R ; Sharif University of Technology
    Growing Science  2018
    Abstract
    In this paper, we design a revenue sharing contract to coordinate pricing and inventory control decisions in a serial supply chain consisting of one supplier, one manufacturer and one retailer. We assume that the retailer faces Poisson demand and his unsatisfied demands will be lost. The retailer applies one-for-one period policy in which he constantly places an order for one unit of product to the manufacturer in a predetermined time interval which results in a deterministic demand for the manufacturer. Solution procedures are developed to find the equilibrium in the Vendor Managed Inventory (VMI) program with a revenue sharing contract, in which no party is willing to deviate from for the... 

    Developing a partial backlogging deteriorating inventory model with selling price dependant demand rate and cycle length dependant selling price

    , Article 2008 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2008, Singapore, 8 December 2008 through 11 December 2008 ; January , 2008 , Pages 198-202 ; 9781424426300 (ISBN) Haji, A ; Sabahno, H ; Haji, R ; Sharif University of Technology
    2008
    Abstract
    In this paper, we develop an inventory model with price dependant demand rate, under time value of money and inflation, finite time horizon, exponential backlogging rate and exponential deterioration rate with the objective of maximizing the present worth of the total system profit. Using a dynamic programming based solution algorithm, we are able to find the optimal sequence of the cycles and also to obtain different optimal selling prices and optimal order quantities for the cycles with unequal lengths, which have never been done before for our model. We also use a proper numerical example to show accuracy of the solution procedure. © 2008 IEEE  

    One-for-one period policy and a series of suppliers

    , Article 2009 International Conference on Computers and Industrial Engineering, CIE 2009, 6 July 2009 through 9 July 2009, Troyes ; 2009 , Pages 902-906 ; 9781424441365 (ISBN) Haji, R ; Pirayesh Neghab, M ; Haji, A ; Sharif University of Technology
    2009
    Abstract
    The purpose of this paper is to adopt and analyze a new ordering policycalled one-for-one-period policy in a multi-echelon supply chain consisting ofone retailer and a series of TV suppliers. The main advantage of adopting theone-for-one-period (7,7) ordering policy for retailers is the elimination ofuncertainty for supplier which leads to total elimination of the safety stocksat all suppliers. This in turn leads to the reduction of the total system costsand in case any supplier's ordering cost is negligible it can even eliminate theneed for him to carry any inventory. In addition to this advantage, thenumerical results show that the application of this new policy for the retailerleads to... 

    Optimal batch production with minimum rework cycles and constraint on accumulated defective units

    , Article 2009 IEEE/INFORMS International Conference on Service Operations, Logistics and Informatics, SOLI 2009, Chicago, IL, 22 July 2009 through 24 July 2009 ; 2009 , Pages 633-638 ; 9781424435418 (ISBN) Haji, B ; Haji, A. R ; Haji, R ; Sharif University of Technology
    2009
    Abstract
    This paper deals with the issue of economic batch quantity (EBQ) in a single machine system in which defective items are produced in each cycle of production. The accumulated defective items produced in a period, consisting of several equal cycles, are all reworked in the last cycle of this period called the rework cycle. At the end of each period the whole process will start all over again. We assume that there is a limitation on the total defective items. We also do not adopt the restriction that the rework process rate be equal to the normal production rate. In addition we assume that there is a set up time for rework process. Further we assume that the number of rework cycles be as small... 

    Economic production quantity with accumulated rework

    , Article 36th International Conference on Computers and Industrial Engineering, ICC and IE 2006, Taipei, 20 June 2006 through 23 June 2006 ; 2006 , Pages 4196-4203 Haji, R ; Tavakol, A. R ; Haji, B ; Sharif University of Technology
    2006
    Abstract
    This paper deals with the issue of economic batch quantity (EBQ) in a single machine system in which defective items are produced in each cycle of production. The defective items produced in the first N cycles are accumulated at the end of the Nth cycle and are all reworked in a separate cycle called the rework cycle which has the same length as the other cycles and begins just at the end of the Nth cycle. At the end of the rework cycle the whole process will start all over again. For this system, assuming no shortages are permitted we obtain the economic batch quantity which minimizes the total cost  

    The Effects of Intentional Process Models on Goal Modeling and Process Conformance Checking

    , M.Sc. Thesis Sharif University of Technology Farsayyad, Nazi (Author) ; Rafiei, Majid (Supervisor) ; Khedmati, Majid (Supervisor)
    Abstract
    In recent years, requirement engineering and goal modeling have gained more attention among different organisations. Therefore, different methods have been designed to discover stakeholders’ requirements and translate them into process and organizational goals. Various goal models have been introduced to represent these goals and their relations towards each other. Still, these methods are manual representations of different process scenarios and do not relate to the actual behavior. In 2014, Map Miner Method (MMM) was introduced to discover intentional process models from event logs. MMM uses Hidden Markov Model (HMM) as a means to represent the process as a map model of strategies and... 

    Multi-Echelon Mixed-loop Supply Chain Network Design under Disruption Conditions

    , M.Sc. Thesis Sharif University of Technology Beheshti, Saeed (Author) ; Haji, Rasoul (Supervisor) ; Haji, Alireza (Supervisor)
    Abstract
    Fulfilling the demands of customers, used to be the main purpose of Supply Chain Network Designers. Soon after that, the environmental concerns created the concept of Reverse Logistic in order to prevent goods from being scattered in the environment after their disposal. Governmental regulations and people's concerns, forced the factories to gather the created pollutions of the environment. They gradualy confessed the positive impacts of these ruturns on their financials. The flow of forward and reverse logistics establishes a Closed-Loop in which the returning economical circumstances were transferd into original factories. Later, Open-Loops were created. In open-loops the returns have to... 

    A Trajectory Recommendation System for Efficient Finding of Passengers

    , M.Sc. Thesis Sharif University of Technology Aledavood, Ebrahim (Author) ; Khedmati, Majid (Supervisor) ; Rafiee, Majid (Supervisor)
    Abstract
    Recommending routes to city taxis in order to improve their performance in finding passengers can reduce traffic, pollution and waiting time for passengers, as well as this, increasing the efficiency of taxis can increase their income. In this study, by analyzing trajectory data obtained from 536 taxis in San Francisco over a period of one month, we generated networks of cells, each of which has time-dependent characteristics such as the probability of finding a passenger, the capacity of each cell, or the amount of demand exists is in the cell and the average speed of passing through that cell. also, the connections between these cells in order to make more use of the experiences of taxi...