    Allocation of Operating Reserve to Demand Response Resources in Composite System

    , M.Sc. Thesis Sharif University of Technology Parvania, Masoud (Author) ; Fotuhi Firuzabad, Mahmoud (Supervisor)
    Abstract
    Considerable developments in demand-side real-time telemetry systems allow ISOs to use demand-side provided reserves in ancillary service markets. Presently, many ISOs designed programs to utilize the reserve provided by demand response resources in their market, and deploy them in emergency conditions. These programs are called ancillary service demand response (ASDR) programs. This thesis presents a stochastic programming model to schedule reserve provided by demand response resources in load buses of system. The demand-side reserve resources are modeled by demand response providers (DRP) which have the responsibility of aggregating and managing responses of customers. The reserve provided... 

    Security Constraint Unit Commitment With Wind Power Uncertainty By Stochastic Programming

    , M.Sc. Thesis Sharif University of Technology Kia, Mohsen (Author) ; Hosseini, Hamid (Supervisor)
    Abstract
    Economic aspects of power systems in their new structures, have been the subject of most of new publications in the area of electrical engineering after the era of restructuring. Nowadays, the power generation business is totally market driven in most of countries all around the world and the system operators are responsible for maintaining a high level of system security as well as the economic operation of the power systems. The development of wind power generation has rapidly progressed over the last decade. With the advancement in wind turbine technology, wind energy has become competitive with other fuel-based resources. The fluctuation of wind, however, makes it difficult to optimize the... 

    Interruptible Load Management in Simultaneous Energy and Reserve Market

    , M.Sc. Thesis Sharif University of Technology Sahebi, Mir Mohammad Reza (Author) ; Ehsan , Mehdi (Supervisor)
    Abstract
    In restructured power system, the Independent System Operator (ISO) implements Security Constraint Unit Commitment (SCUC) for clearing of day-ahead market. In this project, SCUC is also uses for simultaneous clearing of energy and reserve market. Spinning reserve and of generating units and Interruptible Loads (IL) are considered as system operating reserves in the proposed model. Some of IL usage restrictions such as maximum load curtailed, maximum curtailment hour in a day, maximum length of each curtailment and etc is also considered. One of these constraints is interruption time (the time between ISO’s request and IL’s Answer) which is very difficult to formulate. Expected Energy Not... 

    Optimizing Transmisson from Distant Wind Farms

    , M.Sc. Thesis Sharif University of Technology Abdollahi Mansourkhani, Hamid Reza (Author) ; Hosseini, Hamid (Supervisor)
    Abstract
    Wind power is site dependent and is by nature partially dispatchable. Furthermore, good wind sites are far from grid. Due to these problems, and along with the existing limitations in the transmission networks, a comprehensive analysis over an extended time is needed to properly explore all potential wind sites for wind capacity allocation. This problem is computationally expensive and decomposition methods are required to break down this problem. Here Benders decomposition approach is used, which is a popular technique for solving large-scale problems, to decompose the original problem into a master and a subproblem. The master problem is a linear problem, which allocates wind capacity to... 

    Security Constrained Unit Commitment With Natural Gas Transmission Delivery Constraints

    , M.Sc. Thesis Sharif University of Technology Badakhshan, Sobhan (Author) ; Ehsan, Mahdi (Supervisor)
    Abstract
    Natural gas power plant installed in power system as rapid start unit. In the recent decades, with increasing in the number of gas generating units in the world, consideration of natural gas transmission network in optimal solution of security-constrained unit commitment (SCUC) become a non-negligible problem. The gas transmission grid constraints integrated into the scheduling of thermal units in the proposed model for minimizes power system operating cost. In a power plant transmission of natural gas to power plant is very important because congestion in natural gas pipeline increases. This model could consider natural gas storage tank in gas transmission network as decision variable.... 

    Coordinated Scheduling of Power and Natural Gas Systems Considering Demand Uncertainty

    , M.Sc. Thesis Sharif University of Technology Nik Payam, Hossein (Author) ; Rafiee, Majid (Supervisor)
    Abstract
    The everyday increasing electricity consumption of household and industrial sectors across the world, and also the limited generation capacity and fuel supplies has led electricity companies, whether in private or government sectors, to focus deliberately on power generation planning, its costs, risks and constraints Because of many reasons including high efficiency, low cost of capital investment, expeditious permitting, and operation flexibility of gas-fired generating units, electricity companies prefer them to old ones like coal-fired or oil-fired generating units. Thus natural gas has gained a significant share in the portfolio of electricity generation fuel resources, and it is... 

    Management of Different Levels of Frequency Control Reserve Ancillary Services

    , M.Sc. Thesis Sharif University of Technology Taghizadeh Torghabeh, Adel (Author) ; Fotuhi Firuzabad, Mahmoud (Supervisor)
    Abstract
    In most countries Frequency control services as one of the Ancillary services are presented in market scheme. Frequency control are used in different levels to balance generation and demand. Each reserve levels is implemented with specific characteristics and rules. Clearance of energy and one control reserve has some drawbacks so in this thesis we try to clear energy and different reserve levels simultaneously. Each reserve level is determined with special criteria. This criterion in primary reserve is frequency deviation restriction and unit commitment risk in territory reserve that is determined by system operator. In this thesis these two criteria are formulated in linear form and... 

    Interruptible Load Contracts and Demand Response Program Implementation in Stochastic Long-Term SCUC with Wind Farm Consideration

    , M.Sc. Thesis Sharif University of Technology Abedini Duki, Esmaeil (Author) ; Hosseini, Sayyed Hamid (Supervisor)
    Abstract
    Providing more choices to customers for determining the cost of their required reliability levels is one of the most important targets of restructured power system. Centralized management of reliability in Vertically Integrated Utility (VIU) applying the same policies to different customers is replaced with decentralized management allowing customers to participate in reliability management based on their required reliability levels. In this thesis, impact of emergency demand response programs, interruptible load contract and wind farms on the long-term security constrained unit commitment has been studied. Random outages of generators and transmission lines, load forecast inaccuracies as... 

    Day-ahead power system scheduling considering water consumption in power plants

    , Article International Transactions on Electrical Energy Systems ; Volume 29, Issue 12 , 2019 ; 20507038 (ISSN) Badakhshan, S ; Ganjkhani, M ; Safdarian, A ; Li, L ; Sharif University of Technology
    John Wiley and Sons Ltd  2019
    Abstract
    Power generation consumes a substantial amount of water in the power industry. In order to address the impact of water consumption restriction on the power generation, this paper proposes a security-constrained unit commitment (SCUC) formulation considering water consumption impact as an additional constraint. To this end, the water consumption in power plants is formulated. Consequently, the SCUC is extended to consider the consumed water volume as a restricting factor. A procedure is introduced to investigate the most appropriate point of power generation operation to save a vital amount of water by raising reasonable generation costs. The objective of the proposed model is to minimize the... 

    A modified algorithm for allocating reserve power considering security constraints

    , Article International Transactions on Electrical Energy Systems ; Volume 30, Issue 7 , 2020 Hosseini, S. A ; Toulabi, M. R ; Ashouri Zadeh, A ; Ranjbar, A. M ; Sharif University of Technology
    John Wiley and Sons Ltd  2020
    Abstract
    This paper addresses a novel formulation and solution for the security constrained reserve management (SCRM) problem in both normal and N − 1 contingency conditions. Indeed, the SCRM problem is a modified version of the security constraint unit commitment problem which is updated with the operational reserve management and frequency stability constraints in both normal and N − 1 contingency conditions. The objective of this problem is to determine the optimal amounts of generation associated with different units and frequency regulation reserve (FRR) and allocate the FRR among the generation units. Therefore, the SCRM problem is a mixed integer nonlinear problem which is solved using the... 

    Frequency stability improvement in windthermal dominated power grids

    , Article IET Generation, Transmission and Distribution ; Volume 14, Issue 4 , 2020 , Pages 619-627 Ashouri Zadeh, A ; Toulabi, M ; Dobakhshari, A. S ; Ranjbar, A. M ; Sharif University of Technology
    Institution of Engineering and Technology  2020
    Abstract
    With the proliferation of intermittent renewable energy sources, power systems need to withstand an increasing number of disturbances that may affect system frequency. In this paper, we focus on the effects of high penetration level of wind turbine-generators (WTG) on the power system operational planning from the frequency point of view. Specifically, an exact formulation for the minimum frequency calculation is presented to increase accuracy and speed of analyses. Then, the effect of WTG's frequency response on the power system frequency stability is investigated to compute the maximum acceptable generation outage as a function of penetration level. Finally, as an application to power... 

    Probabilistic assessment of available transfer capacity via market linearization

    , Article IEEE Systems Journal ; Volume 9, Issue 4 , August , 2015 , Pages 1409-1418 ; 19328184 (ISSN) Mohseni, M ; Nouri, A ; Salmanpor Bandaghiri, P ; Saeedavi, R ; Afkousi Paqaleh, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2015
    Abstract
    Uncertainties associated with bus loading and components' availability lead to uncertainties in different system variables based on the system physical and economical relationships. Line flows, bus voltages, different prices, and other variables and indices, such as available transfer capacity (ATC), are stochastic and cannot be expressed as a determined quantity. Traditionally, in order to model the stochastic nature of power systems, a stochastic power flow algorithm is used. In this paper, stochastic-algebraic method is applied to find the probability density function (pdf) of ATC. The algorithm linearizes the optimal power flow formulation and uses Gram-Charlier expansion to find the pdf... 

    An analytical framework for operational reliability studies of highly wind integrated power systems

    , Article 2016 International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2016 - Proceedings, 16 October 2016 through 20 October 2016 ; 2016 ; 9781509019700 (ISBN) Parvini, Z ; Abbaspour, A ; Fotuhi Firuzabad, M ; Moeini Aghtaie, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2016
    Abstract
    This paper presents a new framework for evaluating contribution of wind farms in operational reliability level of power systems. In this regard, at first, it provides a short-term analytical model well designed to represent intermittent and uncertain nature of wind power. Combining the attained multi-state model of wind farms with the other committed generating units, operational risk of the system is evaluated. The concept of Pennsylvania-New Jersey-Maryland (PJM), previously developed to assess the short-term/mid-term reliability of conventional generating units, is revisited in this paper to more practically incorporate wind farms in reliability studies of the power system. The proposed... 

    Optimizing nodal demand response in the day-ahead electricity market within a smart grid infrastructure

    , Article 16th IEEE International Conference on Industrial Informatics, INDIN 2018, 18 July 2018 through 20 July 2018 ; 2018 , Pages 972-977 ; 9781538648292 (ISBN) Hajibandeh, N ; Shafie Khah, M ; Ehsan, M ; Catalao, J. P. S ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2018
    Abstract
    Developments of the smart grid infrastructure can facilitate the upsurge of Demand Response (DR) share in power system resources. This paper models the effects of Demand Response Programs (DRPs) on the behavior of the electricity market in the Day-Ahead (DA) session. Decision makers look for the best DR tariff to employ it as a tool to obtain a flexible and sustainable energy market. Employing the most effective DRP is of crucial importance. An optimized DR model and the optimum rates for each DRP are found to meet the decision makers' requirements. optimizing the nodal tariff and incentive values of different DRPs are proposed in the electricity market. In such environment, market... 

    Stochastic Security Constrained Unit Commitment with High Penetration of Wind Farms

    , Article 19th IEEE International Conference on Environment and Electrical Engineering and 2019 IEEE Industrial and Commercial Power Systems Europe, EEEIC/I and CPS Europe 2019, 11 June 2019 through 14 June 2019 ; 2019 ; 9781728106526 (ISBN) Kia, M ; Hosseini, S. H ; Heidari, A ; Lotfi, M ; Catalão, J. P. S ; ShafieKhah, M ; Osório, G ; Santos, S. F ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2019
    Abstract
    Secure and reliable operation is one of the main challenges in restructured power systems. Wind energy has been gaining increasing global attention as a clean and economic energy source, despite the operational challenges its intermittency brings. In this study, we present a formulation for electricity and reserve market clearance in the presence of wind farms. Uncertainties associated with generation and line outages are modeled as different system scenarios. The formulation incorporates the cost of different scenarios in a two-stage short-term (24-hours) clearing process, also considering different types of reserve. The model is then linearized in order to be compatible with standard... 

    Security-constrained unit commitment with natural gas pipeline transient constraints

    , Article IEEE Transactions on Smart Grid ; Volume 11, Issue 1 , 2020 , Pages 118-128 Badakhshan, S ; Ehsan, M ; Shahidehpour, M ; Hajibandeh, N ; Shafie Khah, M ; Catalao, J. P. S ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2020
    Abstract
    The interdependencies of power systems and natural gas networks have increased due to the additional installations of more environmental-friendly and fast-ramping natural gas power plants. The natural gas transmission network constraints and the use of natural gas for other types of loads can affect the delivery of natural gas to generation units. These interdependencies will affect the power system security and economics in day-ahead and real-time operations. Hence, it is imperative to analyze the impact of natural gas network constraints on the security-constrained unit commitment (SCUC) problem. In particular, it is important to include natural gas and electricity network transients in... 

    Risk-Based networked-constrained unit commitment considering correlated power system uncertainties

    , Article IEEE Transactions on Smart Grid ; Volume 11, Issue 2 , 2020 , Pages 1781-1791 Ghorani, R ; Pourahmadi, F ; Moeini Aghtaie, M ; Fotuhi Firuzabad, M ; Shahidehpour, M ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2020
    Abstract
    The forecast errors for distributed energy resources (DERs) and hourly demands have contributed to power system uncertainties and additional risks in the day-ahead scheduling of electricity markets. In this paper, a risk-based approach is introduced to determine the stochastic solution of network-constrained unit commitment (NCUC) when additional uncertainties are embedded in the power system scheduling. The historical power market transaction data are used to model nodal injection uncertainties and reserve capacity requirements are considered to assess the solution of the risk-based NCUC. The proposed NCUC problem is formulated as a single-stage second order cone program which is a convex... 

    Distributionally robust chance-constrained generation expansion planning

    , Article IEEE Transactions on Power Systems ; Volume 35, Issue 4 , 2020 , Pages 2888-2903 Pourahmadi, F ; Kazempour, J ; Ordoudis, C ; Pinson, P ; Hosseini, S. H ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2020
    Abstract
    This article addresses a centralized generation expansion planning problem, accounting for both long- and short-term uncertainties. The long-term uncertainty (demand growth) is modeled via a set of scenarios, while the short-term uncertainty (wind power generation) is described by a family of probability distributions with the same first- and second-order moments obtained from historical data. The resulting model is a distributionally robust chance-constrained optimization problem, which selects the conventional generating units to be built among predefined discrete options. This model includes a detailed representation of unit commitment constraints. To achieve computational tractability,... 

    The impact of dispersed PV generation on ramp rate requirements

    , Article 2012 11th International Conference on Environment and Electrical Engineering, EEEIC 2012 - Conference Proceedings, 18 May 2012 through 25 May 2012, Venice ; 2012 , Pages 977-982 ; 9781457718281 (ISBN) Arabali, A. S ; Dehghanian, P ; Moeini-Aghtaie, M ; Abbaspour, A ; Sharif University of Technology
    IEEE  2012
    Abstract
    PV generation variability and uncertainty significantly influence operation of the power systems with high penetration of PV sources. The potential impact of distributed PV generation on ramp rate requirements in the IEEE 24-bus system is evaluated in this paper. PV generation and load are, here, probabilistically modeled using actual data and curve fitting approach. Probabilistic unit commitment (UC) based on unit de-commitment method combined with two point estimate method (2-PEM) is used to determine the ramp rate required to compensate for the PV power fluctuations. The proposed method considers stochastic factors and their effects on the dispatch results. Two scenarios are studied to... 

    Profit-based unit commitment of integrated CHP-thermal-heat only units in energy and spinning reserve markets with considerations for environmental CO2 emission cost and valve-point effects

    , Article Energy ; Volume 133 , 2017 , Pages 621-635 ; 03605442 (ISSN) Nazari, M. E ; Ardehali, M. M ; Sharif University of Technology
    Elsevier Ltd  2017
    Abstract
    For the purposes of lowering environmental emission cost and increasing economic profit, energy efficient combined heat and power (CHP) units can be integrated with conventional separate heat and power production units to meet heat and power demands. The goal of this study is to develop and examine a novel heuristic and deterministic optimization algorithm for solving the profit-based unit commitment (PBUC) problem for a generation company with integrated CHP-thermal-heat only system for (i) satisfying demands for heat and power, (ii) selling spinning reserve for power, (iii) reducing environmental CO2 emission cost, and (iv) accounting for valve-point effects for steam turbines. For...