Using Decentralized Approach in Power Plants Preventive Maintenance Scheduling Problem

Jabbari, Arman | 2015

582 Viewed
  1. Type of Document: M.Sc. Thesis
  2. Language: Farsi
  3. Document No: 47276 (01)
  4. University: Sharif University of Technology
  5. Department: Industrial Engineering
  6. Advisor(s): Modarres Yazdi, Mohammad
  7. Abstract:
  8. In this paper, a new method for handling power plants preventive maintenance scheduling problem is proposed in which a decentralized framework is applied in order to help the electricity markets to prevent data sharing. The new approach is the extension of alternating direction method of multipliers (ADMM) along with several heuristics and refinements to omit the effect of non-convexity of the problem. Since, the new methodmerely needs minimal information exchange, it is completely practical. In order to evaluate the performance of the proposed method, a case study based on generating system of Iran is presented. It is shown that the proposed model obtains acceptable results
  9. Keywords:
  10. Distributed Optimization ; Power Plants ; Scheduling ; Sequencing ; Preventive Maintenance ; Alternating Direction Method of Multipliers (ADMM)Algorithm