Loading...
Search for: testing-systems
0.016 seconds
Total 100 records

    Design and Dynamic Analysis of a Variable Center of Mass Position Estimation Test System

    , M.Sc. Thesis Sharif University of Technology Mahalati Rayeni, Amir (Author) ; Saghafi, Fariborz (Supervisor)
    Abstract
    The weight characteristics of the aircraft, including the location of the center of mass, has a direct and important impact on its stability and control. For example, air dropping is one of those cases in which weight characteristics are subject to considerable changes. Today, the development of algorithms for accurate estimation of weight characteristics has flourished both on-line and off-line. Therefore, it is important to develop the means by which kinetic-based estimation algorithms can be tested. The device should be efficient both in terms of mechanical performance and Implementation capability. To do this, we have to design an outline of the machine, which has the same dynamics as a... 

    Impact of reliability considerations on network topology optimization

    , Article 26th Iranian Conference on Electrical Engineering, ICEE 2018, 8 May 2018 through 10 May 2018 ; 2018 , Pages 1215-1220 ; 9781538649169 (ISBN) Zargar Rezaee, A ; Fotuhi Firuzabad, M ; Farzin, H ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2018
    Abstract
    Optimal transmission switching (OTS) along with optimal bus-bar switching, also known as network topology optimization (NTO), has been previously proposed and utilized as a powerful tool to reduce operational costs. However, operational constraints and reliability considerations of NTO problem have not been addressed properly. In this paper, operational constraints are integrated in NTO problem and the effect of transmission network switching on expected interruption cost (EIC) is investigated. Moreover, a novel approach based on pool of solutions approach is presented, which can generate various switching scenarios. In doing so, the decision maker would be able to analyze and choose the... 

    Optimal transmission switching as a remedial action to enhance power system reliability

    , Article 2016 Smart Grids Conference, SGC 2016, 20 December 2016 through 21 December 2016 ; 2017 , Pages 7-12 ; 9781509049882 (ISBN) Tabatabaei Khorram, S. A ; Fotuhi Firuzabad, M ; Safdarian, A ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2017
    Abstract
    Increasing redundant paths in transmission grids has always been thought to be a tool to enhance service reliability. However, network equations by intertwining power flows through redundant paths impose more limits on systems with more redundancy. Accordingly, autonomous removing of a few lines may relief capacity limit violations in some contingency events thereby enhancing service reliability. This paper aims to study impacts of manual removing of transmission lines on composite system reliability. For doing so, the existing model is extended to consider optimal transmission switching (OTS) as a remedial action. The model minimizes total damage cost imposed by load curtailments. The... 

    Optimal transmission switching as a remedial action to enhance composite system reliability

    , Article 2015 Smart Grid Conference, SGC 2015, 23 December 2015 through 24 December 2015 ; 2017 , Pages 152-157 ; 9781509003693 (ISBN) Tabatabaei Khorram, S. A ; Abbaspour Tehrani Fard, A ; Fotuhi Firuzabad, M ; Safdarian, A ; Sharif University of Technology
    Institute of Electrical and Electronics Engineers Inc  2017
    Abstract
    Increasing redundant paths in transmission grids has always been thought to be a tool to enhance service reliability. However, network equations by intertwining power flows through redundant paths impose more limits on systems with more redundancy. Accordingly, autonomous removing of a few lines may relief capacity limit violations in some contingency events thereby enhancing service reliability. This paper aims to study impacts of manual removing of transmission lines on composite system reliability. For doing so, the existing model is extended to consider optimal transmission switching (OTS) as a remedial action. The model minimizes total damage cost imposed by load curtailments. The... 

    Possibilistic evaluation of distributed generations impacts on distribution networks

    , Article IEEE Transactions on Power Systems ; Volume 26, Issue 4 , 2011 , Pages 2293-2301 ; 08858950 (ISSN) Soroudi, A ; Ehsan, M ; Caire, R ; Hadjsaid, N ; Sharif University of Technology
    Abstract
    In deregulated power systems, the distribution network operator (DNO) is not responsible for investment in distributed generation (DG) units, and they are just concerned about the best architecture ensuring a good service quality to their customers. The investment and operating decisions related to DG units are then taken by entities other than DNO which are exposed to uncertainty. The DNO should be able to evaluate the technical effects of these uncertain decisions. This paper proposes a fuzzy evaluation tool for analyzing the effect of investment and operation of DG units on active losses and the ability of distribution network in load supply at presence of uncertainties. The considered... 

    Interval type-2 fuzzy modeling of wind power generation in Genco's generation scheduling

    , Article Electric Power Systems Research ; Volume 81, Issue 8 , 2011 , Pages 1696-1708 ; 03787796 (ISSN) Siahkali, H ; Vakilian, M ; Sharif University of Technology
    Abstract
    Wind power is a promising source of electric power generation since it has tremendous environmental and social benefits. The generation scheduling (GS) problem encounters several uncertainties in terms of the system's parameters such as load, reserve and available wind power generation. The modeling of those uncertainties is an important issue in power system scheduling. A fuzzy based modeling approach can be used to develop the generation schedule under an uncertain environment. In this paper, the type-2 fuzzy membership function (MF) is implemented to model the linguistic uncertainty of type-1 MF of available wind power generation which stems from opinions of different experts. The... 

    Stochastic unit commitment of wind farms integrated in power system

    , Article Electric Power Systems Research ; Volume 80, Issue 9 , Jan , 2010 , Pages 1006-1017 ; 03787796 (ISSN) Siahkali, H ; Vakilian, M ; Sharif University of Technology
    2010
    Abstract
    Integration of wind power generation creates new concerns for operation engineers in a power system. Unlike conventional power generation sources, wind power generators supply intermittent power due to uncertainty in parameters of wind such as its velocity. This paper presents probabilistic model for load and wind power uncertainty which can be used in operation planning (with durations up to one or two years). A stochastic model is proposed to simulate the status of units that are directly affected by the load and wind power generation uncertainties. This paper develops a solution method for generation scheduling of power system, while taking into account the stochastic behavior of the load... 

    Electricity generation scheduling with large-scale wind farms using particle swarm optimization

    , Article Electric Power Systems Research ; Volume 79, Issue 5 , 2009 , Pages 826-836 ; 03787796 (ISSN) Siahkali, H ; Vakilian, M ; Sharif University of Technology
    2009
    Abstract
    Large-scale integration of wind power in the electricity system presents some planning and operational difficulties, which are mainly due to the intermittent and difficult nature of wind prediction process. Therefore it is considered as an unreliable energy source. This paper presents a new approach for solving the generation scheduling (GS) problem. It will consider the reserve requirement, load balance and wind power availability constraints. The particle swarm optimization (PSO) method is suggested to deal with the equality and inequality constraints in the GS problem. The proposed PSO is applied to a 12-unit test system (including 10 conventional thermal generating units and 2 wind... 

    Competitive distribution system planning model integration of dg, interruptible load and voltage regulator devices

    , Article Iranian Journal of Science and Technology, Transaction B: Engineering ; Volume 34, Issue 6 , 2010 , Pages 619-635 ; 10286284 (ISSN) Siahi, M ; Porkar, S ; Abbaspour Tehrani Fard, A ; Poure, P ; Saadate, S ; Sharif University of Technology
    Abstract
    Distribution systems management is becoming an increasingly complicated issue due to the introduction of new technologies, new energy trading strategies, and new deregulated environment. In the new deregulated energy market and considering the incentives coming from the technical and economical fields, it is reasonable to consider Distributed Generation (DG) as a viable option to solve the lacking electric power supply problem. This paper presents a mathematical distribution system planning model considering three planning options to system expansion and to meet the load growth requirements with a reasonable price as well as the system power quality problems. DG is introduced as an... 

    Observability and estimation of transformer tap setting with minimal PMU placement

    , Article IEEE Power and Energy Society 2008 General Meeting: Conversion and Delivery of Electrical Energy in the 21st Century, PES, Pittsburgh, PA, 20 July 2008 through 24 July 2008 ; 2008 ; 9781424419067 (ISBN) Shiroie, M ; Hosseini, S. H ; Sharif University of Technology
    2008
    Abstract
    One of the most important applications of phasor measurement units (PMUs) is power system state estimation. Some models have been proposed for including phasor measurements in the state estimation. But, all of these models have treated transformer tap settings (voltage transformer turns ratio and phase-shift transformer angle) as fixed parameters of the network. The accuracy of state estimation may decrease when a tap changes or the true value is unknown. In this paper, each transformer tap setting is added as a new state variable to the states vector, converting the linear PMU based state estimation to a nonlinear one. Also, the network observability is analyzed including the observability... 

    Fuzzy generating units dispatch considering the load interruption cost

    , Article 42nd International Conference on Large High Voltage Electric Systems 2008, CIGRE 2008, Paris, 24 August 2008 through 29 August 2008 ; 2008 Shafiezadeh, M. A ; Ahmadi Khatir, A ; Jamshidi, A ; Sharif University of Technology
    2008
    Abstract
    In the new environment of power system, generating units dispatch problem plays an important role inasmuch as it is used to clear power market transactions. That is, market operator solves an optimization problem in order to find the energy and capacity reserve quota of each generating units participating in the power market. There are different techniques for solving this problem which differ in many aspects, including the objective function, optimization algorithm, and feasibility, so using an efficient technique is vital. In the real competitive electricity market, the components of generating units dispatch problem are faced with the uncertainties; therefore, due to the presence of... 

    A low-cost on-line monitoring mechanism for the flexray communication protocol

    , Article Proceedings - 2009 4th Latin-American Symposium on Dependable Computing, LADC 2009, 1 September 2009 through 4 September 2009, Joao Pessoa ; 2009 , Pages 111-118 ; 9780769537603 (ISBN) Sedaghat, Y ; Miremadi, G ; Sharif University of Technology
    2009
    Abstract
    Nowadays, communication protocols are used in safety-critical automotive applications. In these applications, fault tolerance is a main requirement and the existence of single points of failure is a serious threat to system failures. Among the communication protocols, FlexRay is expected to become the communication backbone for future automotive systems. In this paper, we identify single points of failure in the FlexRay protocol by injecting a total of 135,600 single-bit transient faults into all accessible registers of the FlexRay communication controller. The results showed that about 1.2% of all injected faults caused the controller to freeze immediately. Based on these results and... 

    Robust fault location of transmission lines by synchronised and unsynchronised wide-area current measurements

    , Article IET Generation, Transmission and Distribution ; Volume 8, Issue 9 , 1 September , 2014 , Pages 1561-1571 ; ISSN: 17518687 Salehi-Dobakhshari, A ; Ranjbar, A. M ; Sharif University of Technology
    Abstract
    This study presents a novel method for fault location of transmission lines by multiple fault current measurements. In contrast to conventional methods, it is proposed to utilise several current measurements, which may be far from the faulted line. The circuit equations of the network are used to express each fault current as a function of fault location. Fault location is then estimated using a least-squares estimation technique. To achieve a robust estimation of fault location, statistical hypotheses-testing is employed for identifying erroneous measurements. The method is applicable to both synchronised and unsynchronised measurements. Moreover, fault location can be estimated regardless... 

    Transmission grid fault diagnosis by wide area measurement system

    , Article IEEE PES Innovative Smart Grid Technologies Conference Europe ; 2012 ; 9781467325974 (ISBN) Salehi Dobakhshari, A ; Ranjbar, A. M ; Sharif University of Technology
    2012
    Abstract
    While the importance of wide area measurement system (WAMS) consisting of phasor measurement units (PMUs) is recognized, there are still unidentified applications that can be addressed with the advance of technology. Traditionally, power system operators diagnosed the fault point through the status of protective relays and circuit breakers of the protection system. In large blackouts, however, the malfunction of protection system has itself often been among the suspects of the disaster. This paper proposes an alternative fault diagnosis approach independent of the function of protection system, utilizing PMU data and bus impedance matrix (Zbus). First, the proposed method diagnoses the fault... 

    Stochastic security constrained unit commitment incorporating demand side reserve

    , Article International Journal of Electrical Power and Energy Systems ; Volume 56 , March , 2014 , Pages 175-184 ; ISSN: 01420615 Sahebi, M. M. R ; Hosseini, S. H ; Sharif University of Technology
    Abstract
    Increasing the social welfare and achieving real competitive markets are the main purposes of consumers participation in electricity markets. Hence, Demand Response Programs (DRPs) have been designed to consider the consumers participation. One of these programs named Emergency Demand Response Program (EDRP) is based on consumers' responses to high electricity prices and to the incentives that are paid by Independent System Operators (ISOs) in the critical hours. In this paper, a model has been proposed for EDRP participation in the Stochastic Security Constrained Unit Commitment (SCUC) program. Both the spinning reserve and the demand side reserve, which is modeled as EDRP, are taken into... 

    Simultanous emergency demand response programming and unit commitment programming in comparison with interruptible load contracts

    , Article IET Generation, Transmission and Distribution ; Volume 6, Issue 7 , 2012 , Pages 605-611 ; 17518687 (ISSN) Sahebi, M. M ; Duki, E. A ; Kia, M ; Soroudi, A ; Ehsan, M ; Sharif University of Technology
    2012
    Abstract
    Different reasons such as power system restructuring, electricity price variation in some hours of a day and growth in the fuel price, have led to more attention to demand response (DR) programmes for consumers. Two important issues in DR programmes are emergency demand response programming (EDRP) and Interruptible/Curtail able (I/C) programme that is utilised as interruptible load contracts (ILC). The EDDR is utilised to decrease the consumption in peak load or critical hours of the day. This occurs by means of customer's behaviour in response to the incentives. However, the curtailment of voluntarily loads in the critical hours considering the consumer requirements is an action that can be... 

    Composite power system adequacy assessment based on postoptimal analysis

    , Article Turkish Journal of Electrical Engineering and Computer Sciences ; Volume 21, Issue 1 , 2013 , Pages 90-106 ; 13000632 (ISSN) Safdarian, A ; Fotuhi Firuzabad, M ; Aminifar, F ; Sharif University of Technology
    2013
    Abstract
    The modeling and evaluation of enormous numbers of contingencies are the most challenging impediments associated with composite power system adequacy assessment, particularly for large-scale power systems. Optimal power flow (OPF) solution, as a widely common approach, is normally employed to model and analyze each individual contingency as an independent problem. However, mathematical representations associated with diverse states are slightly different in one or a few generating units, line outages, or trivial load variations. This inherent attribute brings a promising idea to speed up the contingency evaluation procedure. In this paper, postoptimal analysis (POA), as a well-recognized... 

    A fast load shedding algorithm to relieve transmission system overloads

    , Article 2011 10th International Conference on Environment and Electrical Engineering, EEEIC.EU 2011 - Conference Proceedings, 8 May 2011 through 11 May 2011 ; May , 2011 , Page(s): 1 - 4 ; 9781424487820 (ISBN) Safdarian, A ; Fotuhi Firuzabad, M ; Tohidy, Y ; Aminifar, F ; Sharif University of Technology
    Abstract
    To improve power system reliability, it is important to reduce the amount of curtailed load when a contingency occurs. While comparing the conventional methods in load shedding, this paper presents a new approach based on sensitivity between line flows and bus power injections. The proposed method selects a set of buses for alleviating the overloaded transmission lines. The RBTS, IEEE-RTS79, and IEEE 118-bus test systems are used to examine the applicability of the proposed method. The results obtained are compared with those of global optimization and heuristic approach from the amount of curtailed load and the computational burden points of view. It will be shown that the proposed method... 

    A global Particle Swarm-Based-Simulated Annealing Optimization technique for under-voltage load shedding problem

    , Article Applied Soft Computing Journal ; Volume 9, Issue 2 , 2009 , Pages 652-657 ; 15684946 (ISSN) Sadati, N ; Amraee, T ; Ranjbar, A. M ; Sharif University of Technology
    2009
    Abstract
    In this paper, a new approach based on hybrid Particle Swarm-Based-Simulated Annealing Optimization technique (PSO-B-SA) is proposed for solving under-voltage load shedding (UVLS) problem. Under-voltage load shedding (UVLS) is one of the most important tools for avoiding voltage instability. In this paper, the UVLS problem is formulated based on the concept of the static voltage stability margin and its sensitivity at the maximum loading point or the collapse point. The voltage stability criterion is modeled directly into the load-shedding scheme. In any UVLS scheme finding the global point is very important for having cost effective economy. The proposed PSO-B-SA methodology is implemented... 

    Investigating the effect of ambient temperature on fault-induced delayed voltage recovery events

    , Article IET Generation, Transmission and Distribution ; Volume 14, Issue 9 , 2020 , Pages 1781-1790 Saber, H ; Karimi, M. R ; Hajipour, E ; Farzin, N ; Hashemi, S. M ; Agheli, A ; Ayoubzadeh, H ; Ehsan, M ; Sharif University of Technology
    Institution of Engineering and Technology  2020
    Abstract
    The high penetration of residential air conditioners (RACs) poses a growing concern in emerging fault-induceddelayed voltage recovery (FIDVR) in power systems. FIDVR is expected to be a significant threat to the stability and reliability offuture power grids. Hence, the system planners should carry out appropriate simulation studies to mitigate the severeconsequences of FIDVR events. A key question to implement these studies is how to determine the worst condition whichresults in FIDVR. Most of the actual FIDVR events have been experienced in the hot hours of the day and this issue makes onecurious to think about the relationship between the FIDVR events and the ambient temperature. In this...