A time-cost trade-off model by incorporating fuzzy earned value management: A statistical based approach
Salari, M ; Sharif University of Technology | 2015
564
Viewed
- Type of Document: Article
- DOI: 10.3233/IFS-141478
- Publisher: IOS Press , 2015
- Abstract:
- Time-cost trade-off problems (TCT) are well-known in project management contents. This approach normally applied for scheduling of a project especially where the project should be completed under pre-determined deadline. This paper aims to extend time-cost trade-off (TCT) problems in order to provide a well-organized mechanism for both scheduling and rescheduling processes of a project. The proposed mechanism includes project scheduling which concerns with the TCT problem, monitoring of project performance during execution phase using earned value management (EVM), and also predicting project future performance through statistical modeling. Once the predicted values of project performance indicate the necessity for rescheduling, the initial TCT problem is modified to determine a new mode for the execution of the project. In the proposed model, also several options have been considered with specific time and cost for an individual activity where options indicate different execution methods (EM) for the implementation of the whole project. Furthermore, due to vagueness and impreciseness associated with data of real case projects, the time and cost behavior of each option presumed as fuzzy numbers. The proposed control mechanism can help project managers to take the advantage of a comprehensive model to schedule, control, and reschedule a project through the life cycle. An illustrative case is then presented to successfully demonstrate the application of the proposed approach
- Keywords:
- Budget control ; Costs ; Economic and social effects ; Fuzzy logic ; Fuzzy sets ; Life cycle ; Project management ; Value engineering ; Earned value ; Earned value management ; Fuzzy regressions ; Re-scheduling process ; rescheduling ; Statistical modeling ; Time-cost trade-off problems ; Time-cost trade-offs ; Scheduling
- Source: Journal of Intelligent and Fuzzy Systems ; Volume 28, Issue 4 , 2015 , Pages 1909-1919 ; 10641246 (ISSN)