Economic batch quantity with setup time for immediate and delayed rework

Haji, B ; Sharif University of Technology | 2007

357 Viewed
  1. Type of Document: Article
  2. Publisher: 2007
  3. Abstract:
  4. This paper considers economic batch quantity (EBQ) in a single machine system in which defective items are produced and are all reworked in the same cycle. In the literature of inventory control, when the rework is done in the same cycle, the setup times are not considered; the rework process starts immediately after each production run, and the waiting of defectives for rework is ignored. Considering these points we assume non-zero setup times for rework, delayed rework in the same cycle, and the cost of waiting, to obtain the EBQ for two different cases
  5. Keywords:
  6. Automation ; Computer networks ; Exhibitions ; Industrial engineering ; Project management ; Systems engineering ; Technology ; Defective items ; Production runs ; Rework process ; Set-up time ; Set-up times ; Single machines ; Production control
  7. Source: IIE Annual Conference and Expo 2007 - Industrial Engineering's Critical Role in a Flat World, Nashville, TN, 19 May 2007 through 23 May 2007 ; 2007 , Pages 1666-1671
  8. URL: https://www.researchgate.net/publication/290800119_Economic_batch_quantity_with_setup_time_for_immediate_and_delayed_rework