Monitoring project duration and cost in a construction project by applying statistical quality control charts

Aliverdi, R ; Sharif University of Technology | 2013

1510 Viewed
  1. Type of Document: Article
  2. DOI: 10.1016/j.ijproman.2012.08.005
  3. Publisher: 2013
  4. Abstract:
  5. The earned value is a leading technique in monitoring and analyzing project performance and project progress. Although, it allows exact measurement of project progress, and can uncover any time and cost deviations from the plan, its capability in reporting accepted level of deviation is not well studied. This study presented an approach to overcome this limitation by applying statistical quality control charts to monitor earned value indices. For this purpose, project time and cost performance indices of a real construction project were monitored regularly on individual control charts. The results were quite promising, and not only competed well against traditional approaches, but also enhanced team's knowledge of project performance. At the end, it was concluded that the proposed approach improves substantially the project controlling scheme and enhances the capability of earned value technique
  6. Keywords:
  7. Earned value technique ; Individual control charts ; Project performance indices ; Schedule and cost performance indices ; Construction projects ; Cost deviation ; Cost performance index ; Earned value ; Individual control ; Project controlling ; Project duration ; Project performance ; Project progress ; Statistical quality control ; Traditional approaches ; Budget control ; Costs ; Optimal systems ; Quality control ; Value engineering ; Flowcharting ; construction industry ; monitoring ; performance assessment ; project assessment ; project management
  8. Source: International Journal of Project Management ; Volume 31, Issue 3 , April , 2013 , Pages 411-423 ; 02637863 (ISSN)